RAMPART ENTERPRISES, INC. | B= | P | 04/12/2024 | Requested paperwork on file. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | TRENTP | TRENTP | | B= | P | 8050712 |
RAMPART ENTERPRISES, INC. | BE | L | 04/11/2024 | Renewed for No Fee at 4/11/2024 9:40:26 AM | JACKIEP | JACKIEP | | BE | L | 8049390 |
RAMPART CONSTRUCTION | BE | L | 03/07/2023 | Renewed online for Full Fee at Mar 7 2023 8:27AM (RECEIPT #: 1937732) | WEBSITE | WEBSITE | | BE | L | 7678563 |
RAMPART CONSTRUCTION | BE | L | 08/30/2022 | Renewed for Full Fee at 8/30/2022 1:07:15 PM | AMYP | AMYP | | BE | L | 7500770 |
RAMPART CONSTRUCTION | BE | L | 02/21/2022 | Renewed online for Half Fee at Feb 21 2022 7:55AM (RECEIPT #: 1845014) | WEBSITE | WEBSITE | | BE | L | 7276965 |
RAMPART CONSTRUCTION | BIN | C | 07/29/2021 | 3rd Party Insulation Certificate on file / Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file / No Burn Long form on file for fire protection / | ERIKK | ERIKK | | BIN | C | 7053172 |
RAMPART CONSTRUCTION | BSP | P | 07/08/2021 | Final done as BSP / Need to provide 3rd party insulation certificate and blower door to complete BIN / Provide Test report and installers certificate for materials used for fire protection of floor per IRC 302.13 EX #4 / Need to complete H= / Rest okay / Unfinished basement, rear deck w/stairs, AC / No further field inspection needed | TRENTP | TRENTP | | BSP | P | 7029198 |
RAMPART CONSTRUCTION | BFD | C | 07/08/2021 | | TRENTP | TRENTP | | BFD | C | 7029159 |
RAMPART CONSTRUCTION | BFR | C | 03/09/2021 | Engineer letter for framing corrections on file | TRENTP | TRENTP | | BFR | C | 6892585 |
RAMPART CONSTRUCTION | BIN | P | 03/09/2021 | Please provide final 3rd party insulation certificate, rough inspection report not needed | TRENTP | TRENTP | | BIN | P | 6892581 |
RAMPART CONSTRUCTION | BFR | P | 03/09/2021 | Need to upload framing correction letter electronically / Footing observation already on file | TRENTP | TRENTP | | BFR | P | 6892578 |
RAMPART CONSTRUCTION | BLA | C | 03/08/2021 | | TRENTP | TRENTP | | BLA | C | 6891613 |
RAMPART CONSTRUCTION | BFR | P | 03/05/2021 | Need to provide engineer letter for frame corrections, footing and foundation observation already on file / Truss repair detail on file | TRENTP | TRENTP | | BFR | P | 6889540 |
RAMPART CONSTRUCTION | BFR | P | 03/04/2021 | Need truss repair uploaded electronically / Need engineer letter for corrections provided on site uploaded electronically / Items corrected and okay per engineer letter / Provide Test report and final certificates for materials used for fire protection of floor per IRC 302.13 EX #4 by final / | TRENTP | TRENTP | | BFR | P | 6888883 |
RAMPART CONSTRUCTION | BFT | C | 03/04/2021 | See notes for BFN | TRENTP | TRENTP | | BFT | C | 6887929 |
RAMPART CONSTRUCTION | BFN | C | 03/04/2021 | open hole on file -- 2400 PSF -- usable -- 5% / footing and foundation observation on file - ufer noted / foundation design on file (bearing capacity verified) / | TRENTP | TRENTP | | BFN | C | 6887925 |
RAMPART CONSTRUCTION | BFR | R | 03/03/2021 | Still need to complete BFT and BFN / Footing and foundation observation already on file / No inspection performed | TRENTP | TRENTP | | BFR | R | 6886318 |
RAMPART CONSTRUCTION | BFN | P | 03/03/2021 | Still need to provide soils report and open hole to complete BFT and BFN / Footing and foundation observation already on file | TRENTP | TRENTP | | BFN | P | 6886314 |
RAMPART CONSTRUCTION | BFR | R | 03/02/2021 | Still need to complete foundation inspections prior to further inspection / No inspection performed | TRENTP | TRENTP | | BFR | R | 6884723 |
RAMPART CONSTRUCTION | BFN | R | 03/02/2021 | No images attached to inspection request / Need to complete BFT / If unfamiliar with uploading images please used following link: https://youtu.be/QS0hdGSBA6o | TRENTP | TRENTP | | BFN | R | 6884720 |
RAMPART CONSTRUCTION | BFR | R | 03/01/2021 | Still need to complete foundation inspections prior to further inspection / No inspection performed | TRENTP | TRENTP | | BFR | R | 6883297 |
RAMPART CONSTRUCTION | BFN | R | 03/01/2021 | No images attached to inspection request / Need to complete BFT / Foundation observation and foundation design on file, still need to verify bearing capacity | TRENTP | TRENTP | | BFN | R | 6883293 |
RAMPART CONSTRUCTION | BFR | P | 02/05/2021 | 1. Provide all foundation paperwork prior to reinpsection /2. Missing fireblocking at multiple top plate penetrations / 3. Broken bottom cord on J10 truss in master bath / 4. Missing 3 2x6 with strap at master bed / 5. Missing inverted HDU4 at X1 girder per detail at rear slider / 6. Steel beam to be in beam pocket north end basement / 7. South beams not splice per detail / 8. Incorrect straps at rear deck posts still installed / Rear deck lid per plan / Sheer walls per plan | CHAD | CHAD | | BFR | P | 6862221 |
RAMPART CONSTRUCTION | BIN | P | 02/02/2021 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | INTERNET | INTERNET | | BIN | P | 6857397 |
RAMPART CONSTRUCTION | BSP | R | 01/29/2021 | Missing H2.5 on truss at east side of deck cover / Incorrect straps used at post to beam connection for deck and cover posts, observed CS16s / Incorrect beam hangers used, observed HUC28-2s / Front porch cover okay | TRENTP | TRENTP | | BSP | R | 6853780 |
RAMPART CONSTRUCTION | BFT | P | 01/29/2021 | Still need to provide soils report and open hole / Need to complete BFN / Footing and foundation observation on file / Engineer letter for framing items was also uploaded to this inspection | TRENTP | TRENTP | | BFT | P | 6852540 |
RAMPART CONSTRUCTION | BTR | C | 01/04/2021 | | TRENTP | TRENTP | | BTR | C | 6824443 |
RAMPART CONSTRUCTION | BFI | C | 10/15/2020 | Need to complete BFT and BFN / R10 installed | JUSTINL | JUSTINL | | BFI | C | 6742248 |
RAMPART CONSTRUCTION | BFD | P | 10/14/2020 | Drain is usable to daylight at northwest -- Damp proofing OK / Need to complete BFT and BFN | TRENTP | TRENTP | | BFD | P | 6741400 |
RAMPART CONSTRUCTION | BFT | P | 09/24/2020 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFT | P | 6717602 |
RAMPART CONSTRUCTION | BFN | P | 09/24/2020 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFN | P | 6717601 |
A N' M ELECTRIC | E= | C | 07/07/2021 | | RANDY | RANDY | | E= | C | 7027014 |
A N' M ELECTRIC | E= | R | 07/02/2021 | 125 amp breaker feeding sub-panel (#2al) / need test lights for OH doors and outlet on patio above light / ------------- 30 amp a/c and hot tub pre-wire | MATTHEW | MATTHEW | | E= | R | 7024438 |
A N' M ELECTRIC | ES | C | 02/02/2021 | Residential Underground: 200-amp 3 Wire New Residence ok NEED METER SEAL. / | GREGM | GREGM | | ES | C | 6856348 |
A N' M ELECTRIC | ER | C | 02/02/2021 | ER OK --- #6CU RANGE OVEN STUB @ BACK OF HOUSE STUB @ SIDE OF GARAGE ----IRR UFER --- NO MCC --- INFLOOR HEAT MST BATH ----- #2AL TO SUB PANEL ---- | GREGM | GREGM | | ER | C | 6856341 |
A N' M ELECTRIC | EP | C | 02/02/2021 | EP OK ----- 100 AMP SUB PANEL ---- | GREGM | GREGM | | EP | C | 6856317 |
A N' M ELECTRIC | EUG | C | 12/08/2020 | 250 urd | TOMC | TOMC | | EUG | C | 6799802 |
A N' M ELECTRIC | ESL | C | 11/04/2020 | ESL OK ---- 1" PVC ----- | GREGM | GREGM | | ESL | C | 6764351 |
A & Z MECHANICAL, INC. | H= | C | 06/06/2023 | PLAN SPLICE IS NOW ON FILE WHOLE HOUSE VENTILATION BEING ACHIEVED WITH DAMPERED OUTSIDE AIR DUCT TO FURNACE RETURN X2 / WHOLE HOUSE SWITCH LOCATED IN THE MECHANICAL ROOM / NOTE / UNFINISHED BASEMENT / DIRECT VENT FURNACE X2 / A/C COMPLETE X1 / OUTSIDE AIR TO FURNACE RETURN X2 / DIRECT VENT UNIT HEATER / | TREVORH | TREVORH | | H= | C | 7764399 |
A & Z MECHANICAL, INC. | H= | P | 06/09/2021 | WILL NEED TO SEE AN ARCHITECTURAL PLAN SPLICE SHOWING THE GARAGE AS HEATED, WILL NEED AN EQUIPMENT CERTIFICATE FOR THE GARAGE UNIT HEATER, WHOLE HOUSE VENTILATION BEING ACHIEVED WITH DAMPERED OUTSIDE AIR DUCT TO FURNACE RETURN X2 / WHOLE HOUSE SWITCH LOCATED IN THE MECHANICAL ROOM / NOTE / UNFINISHED BASEMENT / DIRECT VENT FURNACE X2 / A/C COMPLETE X1 / OUTSIDE AIR TO FURNACE RETURN X2 / DIRECT VENT UNIT HEATER / | TREVORH | TREVORH | | H= | P | 6996289 |
R D PLUMBING LLC | HI+ | C | 03/08/2021 | 10 LB TEST OK / ADDED 8' OF 1-1/4" FROM EXISTING MAIN IN BASEMENT TO FUTURE USE STUB / ADDED 14' OF 3/4" FROM EXISTING 1" LINE TO GARAGE UNIT HEATER / | BILLS | BILLS | | HI+ | C | 6891902 |
WESTERN FIREPLACE SUPPLY, INC. | HV+ | C | 02/22/2021 | CORRECTION MADE, SEE IMAGES | BILLS | BILLS | | HV+ | C | 6876066 |
WESTERN FIREPLACE SUPPLY, INC. | HV+ | P | 02/02/2021 | WILL REQUIRE HIGH INSULATION SHIELD TO CONTINUE TO TOP OF VENT CHASE (CHIMNEY CHASE ON TOP OF TRUSSES) OR PICTURES OF DRAFT STOP INSTALLED AT PLYWOOD LINE ON TOP OF TRUSSES | BILLS | BILLS | | HV+ | P | 6856665 |
A & Z MECHANICAL, INC. | HC | C | 02/02/2021 | RELEASE METER | BILLS | BILLS | | HC | C | 6856664 |
A & Z MECHANICAL, INC. | HRR | C | 02/02/2021 | WHOLE HOUSE VENTILATION BEING ACHIEVED WITH DAMPERED OUTSIDE AIR DUCT TO FURNACE RETURN X2 / NOTE / UNFINISHED BASEMENT / DIRECT VENT FURNACE X2 / A/C ROUGH COIL AND LINESET X1 / OUTSIDE AIR TO FURNACE RETURN X2 / | BILLS | BILLS | | HRR | C | 6856663 |
A & Z MECHANICAL, INC. | HRR | P | 01/28/2021 | AFTER CONVERSATION WITH CONTRACTOR, SPRAY FOAM TO BE INSTALLED AT ROOF LINE. WILL NEED AN HV+ INSPECTION REQUESTED FOR THE FIREPLACE VENTS BEFORE THE HRR INSPECTION CAN BE COMPLETED AS THE ORIGINAL HV INSPECTION HAS ALREADY BEEN COMPLETED. | BILLS | BILLS | | HRR | P | 6850990 |
A & Z MECHANICAL, INC. | HRR | P | 01/27/2021 | LOWER BVENT FIRE STOP TO BOTTOM OF SOFFIT LINE TO PROTECT VENT FROM BLOWN INSULATION (INSULATION SHIELD WAS ADDED AT ROOF LINE?) BVENT LACKS CLEARANCE TO WIRES IN BASEMENT. CONTRACTOR MAY ATTACH DETAILED PICTURES AT NEXT INSPECTION REQUEST. | BILLS | BILLS | | HRR | P | 6849890 |
A & Z MECHANICAL, INC. | HRR | P | 01/22/2021 | LOWER BVENT FIRE STOP TO BOTTOM OF SOFFIT LINE TO PROTECT VENT FROM BLOWN INSULATION, DRYER EXHAUST REQUIRES NAIL PROTECTION AT WALL TOP PLATES, SUPPORT BATH EXHAUST AT BATHROOM #2, SEAL ELBOW GORES AT KITCHEN EXHAUST, BVENT LACKS CLEARANCE TO WIRES IN BASEMENT. WHOLE HOUSE VENTILATION BEING ACHIEVED WITH DAMPERED OUTSIDE AIR DUCT TO FURNACE RETURN X2 / NOTE / UNFINISHED BASEMENT / DIRECT VENT FURNACE X2 / A/C ROUGH COIL AND LINESET X1 / OUTSIDE AIR TO FURNACE RETURN X2 / | BILLS | BILLS | | HRR | P | 6845789 |
R AND D PLUMBING | HI+ | C | 01/21/2021 | 10 LB TEST OK / MAIN UPGRADED TO 2 INCH / ADDED 1 GENERATOR AND 1 PATIO STUB UNDER SOUTH SIDE OF DECK / | MATTM | MATTM | | HI+ | C | 6844553 |
R AND D PLUMBING | HI | C | 01/15/2021 | 10 LB TEST OK / 1-1/2 INCH MAIN / 2 FURNACES / 2 WATER HEATERS / 1 COOK-TOP / 1 FIREPLACE / 1 1" EXTERIOR STUB BELOW BACK DECK / | BILLS | BILLS | | HI | C | 6837732 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 12/10/2020 | NOTE / MAIN LEVEL FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK / NON-COMBUSTIBLE MATERIALS INSTALLED / | BILLS | BILLS | | HV | C | 6803289 |
R AND D PLUMBING | P= | C | 07/07/2021 | potable water cert on file | JOHN | JOHN | | P= | C | 7027239 |
R AND D PLUMBING | P= | R | 07/07/2021 | the address on potable water certification does not match address of house, other correction ok | JOSEPHD | JOSEPHD | | P= | R | 7026271 |
R AND D PLUMBING | P= | R | 07/06/2021 | NO CHANGES MADE AT DISHWASHER DRAIN -- WAITING FOR POTABLE H20 REPORT -- REST OK | LEE | LEE | | P= | R | 7025609 |
R AND D PLUMBING | P= | P | 06/24/2021 | need backflow for yard hydrant, need potable water certification, need access to aav @ washer box, need high loop @ dishwasher, pex for expansion tank lacking 6" clearance to single wall water heater vent, rest ok note: unfinished basement, RP for irrigation in mech | JOSEPHD | JOSEPHD | | P= | P | 7014436 |
R AND D PLUMBING | PWO | C | 01/21/2021 | need certificate of potable water and backflow protection for yard hydrant by final. | TAYLOR | TAYLOR | | PWO | C | 6844345 |
R AND D PLUMBING | PTO | C | 01/19/2021 | note: will need pwo inspection when water line is run to well, unfinished basement, irrigation stub, check well tank at final, aav @ laundry sink, both master lavs, washer box, guest bath lav, in wall at guest bath tub, powder lav, at final contractor stated that attic will be conditioned at rain head in master shower, | JOSEPHD | JOSEPHD | | PTO | C | 6840789 |
R AND D PLUMBING | PB | C | 11/02/2020 | Note: need PWO inspection | MALYNDA | MALYNDA | | PB | C | 6761007 |