THOMAS GENERAL CONTRACTORS, INC. | B= | C | 01/26/2021 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 6848315 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 12/30/2020 | pending completion of other required inspections, building okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6822733 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | P | 12/15/2020 | Need to attach plumb to permit, no additional on site inspections after today until plumb permit is attached / pending completion of other required inspections, above ceiling okay | BOBF | BOBF | | BSP | P | 6808770 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 11/19/2020 | need to attach plumb to permit / pending completion of other required inspections, frame okay / Reviewed Accessible Elements / | BOBF | BOBF | | BFR | P | 6783183 |
MATRIX ELECTRIC, INC. | E= | C | 12/21/2020 | FIRE ALARM INSPECTION: | CRAIG | CRAIG | | E= | C | 6815366 |
MATRIX ELECTRIC, INC. | E= | C | 12/21/2020 | note Furniture whips not installed at this time rest ok | CRAIG | CRAIG | | E= | C | 6815361 |
MATRIX ELECTRIC, INC. | ER | P | 12/17/2020 | above ceiling in 103 and 104 ok note VAV1w10 need 30" of clearance in front of disconnect | CRAIG | CRAIG | | ER | P | 6811829 |
MATRIX ELECTRIC, INC. | ER | P | 12/17/2020 | FIRE ALARM INSPECTION: above ceiling in 103 and 104 ok 14/2 FPLP cable | CRAIG | CRAIG | | ER | P | 6811823 |
MATRIX ELECTRIC, INC. | ER | P | 11/19/2020 | Walls ok / | LOGANP | LOGANP | | ER | P | 6782106 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 01/26/2021 | ENGINEER APPROVED TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | C | 6848314 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 12/30/2020 | Mechanical final ok pending receipt of test and balance report / THERMOSTATS ARE COMPLETE | MARKB | MARKB | | H= | P | 6822266 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 12/14/2020 | FINAL PENDING - Install thermostats and provide test and balance report. | MARKB | MARKB | | H= | P | 6806410 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | C | 12/14/2020 | ABOVE CEILING DUCT - FLEX, DIFFUSERS, VAV'S & TRANSFERS COMPLETE. | MARKB | MARKB | | HD | C | 6806405 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 11/24/2020 | ABOVE CEILING DUCT - RELOCATED BRANCHES IN OPEN OFFICE AREA 103 OK TO WRAP. RELOCATED VAV-03 AND ROUGH DUCT IN BREAK AREA OK TO WRAP. LOW PRESSURE MAINS/BRANCHES FOR VAV'S 9 & 10 OK TO WRAP - vav's not installed. Still need to complete all transfer openings. No diffusers this inspection. | MARKB | MARKB | | HD | P | 6787522 |
R & R DITCHING, INC | P= | C | 12/29/2020 | demo 2 break room sinks, cap water and vent in ceiling, cap drain at floor | TED | TED | | P= | C | 6820852 |