KTK GENERAL CONTRACTING LIMITED | B= | C | 01/22/2021 | | TIMOTHYS | TIMOTHYS | | B= | C | 6845784 |
KTK GENERAL CONTRACTING LIMITED | B= | P | 01/21/2021 | Missing signage at exit doors reading "THIS DOOR TO REMAIN UNLOCKED WHEN THIS SPACE IS OCCUPIED" / Rest of final ok -- Schedule a new Building Final when above items are complete. | TIMOTHYS | TIMOTHYS | | B= | P | 6844811 |
KTK GENERAL CONTRACTING LIMITED | BFR | P | 11/12/2020 | Pending all other required inspections / Observed W3 light gauge metal non rated walls and first layer of gyp in Conference room 111, Break room 112 and Copy room 113 as well as offices 114,115, and 118 / Reviewed elements of accessibility / Need to attach mechanical to permit | ADAML | ADAML | | BFR | P | 6773984 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 01/19/2021 | | JOHNN | JOHNN | | E= | C | 6839881 |
INTERMOUNTAIN POWER SERVICES INC | ER | C | 12/23/2020 | | BRETC | BRETC | | ER | C | 6817924 |
STILSON ELECTRIC SYSTEMS, INC. | E= | C | 12/23/2020 | FIRE ALARM INSPECTION: | BRETC | BRETC | | E= | C | 6817923 |
STILSON ELECTRIC SYSTEMS, INC. | E= | C | 12/23/2020 | FIRE ALARM INSPECTION: Ceilings and walls - Ok | BRETC | BRETC | | E= | C | 6817916 |
STILSON ELECTRIC SYSTEMS, INC. | ER | R | 12/22/2020 | FIRE ALARM INSPECTION: Not Ready | BRETC | BRETC | | ER | R | 6816113 |
INTERMOUNTAIN POWER SERVICES INC | E= | P | 12/14/2020 | See Rough Notes | BRETC | BRETC | | E= | P | 6807118 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 12/14/2020 | Ceiling rough ok, FA not complete ---------do not close ceiling-------------- / | BRETC | BRETC | | ER | P | 6807114 |
INTERMOUNTAIN POWER SERVICES INC | ER | C | 11/10/2020 | walls OK--- general contractor tells me the fire alarm was ceiling and will go back in the ceiling | CRAIGS | CRAIGS | | ER | C | 6770849 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 01/19/2021 | PICTURE OF DUCT ACCESS DOOR RECEIVED | JERRYF | JERRYF | | H= | C | 6838891 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 01/14/2021 | FINAL PENDING :LABELED ACCESS FOR EXISTING FIRE DAMPER (New duct was connected to the existing fire damper per plan splice) | LIDO | LIDO | | H= | P | 6835823 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/07/2021 | TEST AND BALANCE REPORT RECEIVED. SEE IMAGES. | LIDO | LIDO | | HD | P | 6827969 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 12/30/2020 | CHANGED TO (HD) INSPECTION DUE TO FIRE SMOKE DAMPER ISSUES / CLOUDED AREA ON PLAN SPLICE M1.1 DATED 12/21/20 SHOWS A FIRE SMOKE DAMPER. PLAN PAGE M1.1 DATED 9/10/20 SHOWS A FIRE SMOKE DAMPER. UPON VIEWING THE TWO PLAN PAGES I SEE NO CHANGES, AND A FIRE SMOKE DAMPER IS STILL REQUIRED. GENERAL CONTRACTOR STATED THE REVISED PLANS WERE TO SHOW THE EXISTING DAMPER TO BE UTILIZED BUT THIS DAMPER IS ONLY A FIRE DAMPER, NOT A FIRE SMOKE DAMPER. ALL FLEX DUCT, SUPPLY GRILLS AND RETURN GRILLS OK / ALL THERMOSTATS OK / BY FINAL NEED LETTER FROM ENGINEER DELETING EXISTING CU 1 / NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | HD | P | 6822815 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 12/04/2020 | BY FINAL NEED THE FOLLOWING - LETTER FROM ENGINEER DELETING EXISTING CU 1 - VERIFY ROUND DUCT HAS BEEN CAPPED AT WEST WALL NOTES: ABOVE CEILING SA / RA MAINS / RUN OUTS OK | JERRYF | JERRYF | | HD | P | 6796709 |
INTEGRATED PLUMBING SYSTEMS, INC. | P= | C | 01/20/2021 | | LEE | LEE | | P= | C | 6841851 |
INTEGRATED PLUMBING SYSTEMS, INC. | P= | P | 01/15/2021 | STILL WAITING FOR EJECTOR TO GET ADDED TO PERMIT DETAILS LIST -- OTHER OK | LEE | LEE | | P= | P | 6838627 |
INTEGRATED PLUMBING SYSTEMS, INC. | P= | P | 01/13/2021 | NEED TO INSTALL A BALL VALVE ABOVE CHECK VALVE AT EJECTOR PUMP (2015 IPC 712.2) -- ALSO NEED TO ADD EJECTOR TO SCOPE OF WORK PER NOTES | LEE | LEE | | P= | P | 6835152 |
INTEGRATED PLUMBING SYSTEMS, INC. | PTO | C | 12/23/2020 | By final add Ejector pit to scope of work. | SAMH | SAMH | | PTO | C | 6818949 |
INTEGRATED PLUMBING SYSTEMS, INC. | PTO | R | 11/12/2020 | Switched to PTO inspection / DWV and domestic water not piped per plan / need plans splice for all changes / re-inspect all.. Note: Drawings do not show ejector pump if approved drain and vent need tied in per code IPC section 712 / | DANR | DANR | | PTO | R | 6774215 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | T | 01/12/2021 | PAID (REC#1742276): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout and equipment revisions | JUSTINC | JUSTINC | | XMS | T | 6832539 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | P | 12/21/2020 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised for fire damper | JUSTINC | JUSTINC | | XMS | P | 6814741 |
INTEGRATED PLUMBING SYSTEMS, INC. | XPS | T | 12/21/2020 | PAID (REC#1738461): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: P1.1 adjusted fixture schedule, hex notes and new work plan | SHANEN | SHANEN | | XPS | T | 6814265 |