GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 07/30/2021 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 7054867 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/23/2021 | Complete all final inspections transfer shower grab bars installed. Additional Inspections Required (computer generated): CONVERGINT TECHNOLOGIES, LLC Electrical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6944776 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/19/2021 | need 18" grab bar at 2 transfer showers, install drinking fountain. with all completed MEP inspections B= okay. image with measurements can be used for reinspection. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): CONVERGINT TECHNOLOGIES, LLC Electrical Final Inspection is not Completed yet, GREINER ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6939468 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/02/2021 | Discussed turning radius and clear floor space at showers with Chris. | NATHAN | NATHAN | | BSP | P | 6920900 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/31/2021 | Consultation to discuss accessible door clearances at Sauna rooms / Training with Nathan R | TIMOTHYS | TIMOTHYS | | BSP | P | 6917548 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/19/2021 | With completed required inspections frame okay. Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6904992 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/24/2021 | thickened slab and plunge pool reinforcement okay | NATHAN | NATHAN | | BFR | P | 6880272 |
CONVERGINT TECHNOLOGIES, LLC | E= | C | 06/24/2021 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 7014517 |
CONVERGINT TECHNOLOGIES, LLC | ER | C | 06/24/2021 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 7014511 |
GREINER ELECTRIC, LLC. | E= | C | 04/21/2021 | gfci protection ---ok / | BRIAN | BRIAN | | E= | C | 6942003 |
GREINER ELECTRIC, LLC. | E= | P | 04/19/2021 | need gfci protection on the lighting working / rest ok / | BRIAN | BRIAN | | E= | P | 6938646 |
GREINER ELECTRIC, LLC. | ER | P | 04/12/2021 | coaches office ceiling--ok / | BRIAN | BRIAN | | ER | P | 6929936 |
GREINER ELECTRIC, LLC. | ER | P | 03/24/2021 | rest of the hard lids--ok / | BRIAN | BRIAN | | ER | P | 6909072 |
GREINER ELECTRIC, LLC. | ER | P | 03/23/2021 | bath room and offices---ok / hallway hard lids / | BRIAN | BRIAN | | ER | P | 6907607 |
CONVERGINT TECHNOLOGIES, LLC | ER | P | 03/22/2021 | FIRE ALARM INSPECTION: shower and spa areas---ok / | BRIAN | BRIAN | | ER | P | 6906385 |
GREINER ELECTRIC, LLC. | ER | P | 03/22/2021 | locker rooms and shower areas-- walls and hardlids--ok / panel L1E---ok / | BRIAN | BRIAN | | ER | P | 6906380 |
GREINER ELECTRIC, LLC. | ESL | C | 02/25/2021 | 2nd spa ---ok / | BRIAN | BRIAN | | ESL | C | 6881144 |
GREINER ELECTRIC, LLC. | ESL | P | 02/24/2021 | 4 corners rebar bonded from lower deck of tub to upper deck 1st pool --- 4 corners rebar bonded from upper deck of tub to lower deck not ready at second tub --- | LOGANP | LOGANP | | ESL | P | 6879369 |
GREINER ELECTRIC, LLC. | ESL | R | 02/23/2021 | need to bond all 4 corners of the lower deck to the upper deck / need to install a EPO switch and have the service disconnect more than 5' away from the spa / | BRIAN | BRIAN | | ESL | R | 6878455 |
HVAC SOLUTIONS, INC. | H= | C | 07/30/2021 | REVISED TEST AND BALANCE REPORT RECEIVED. | MARKB | MARKB | | H= | C | 7054866 |
HVAC SOLUTIONS, INC. | H= | R | 05/19/2021 | CONTRACTOR TO REVIEW TEST AND BALANCE REPORT AND CORRECT OUTSTANDING ITEMS BEFORE SUBMITTING TO RBD. | MARKB | MARKB | | H= | R | 6973413 |
HVAC SOLUTIONS, INC. | H= | P | 04/16/2021 | FINAL PENDING - Need signs installed outside of sauna's per 2015 IMC 914.5. Provide test and balance report. FLEX, DIFFUSERS, TRANSFERS COMPLETE. SAUNA CONTROLS, TRANSFERS AND HEATER COMPLY WITH IMC 914 AND MANUFACTURER INSTRUCTIONS. | MARKB | MARKB | | H= | P | 6937186 |
HVAC SOLUTIONS, INC. | H= | P | 04/06/2021 | 3- 6" DUCTS FOR EXHAUST OK AT COACHES BATH ROOM AND SHOWER. OK TO WRAP SUPPLY DUCT OVER COACHES OFFICE. RECALL INSPECTION AFTER FLEX AND DIFFUSERS ARE INSTALLED BEFORE TILE FOR COACHES OFFICE. | JON | JON | | H= | P | 6924354 |
HVAC SOLUTIONS, INC. | HD | P | 03/23/2021 | ABOVE CEILING DUCT - EXHAUST DUCT FOR MECH 112, COACH'S TOILETS & SHOWERS ABOVE HARD LID OK TO WRAP. | MARKB | MARKB | | HD | P | 6907460 |
HVAC SOLUTIONS, INC. | HD | P | 03/22/2021 | ----NEED A CONTRACTOR TO CLAIM ELECTRIC HEATERS---- ABOVE CEILING DUCT - SUPPLY/EXHAUST ABOVE HARD LID FOR LOCKER 110, 105 & RESTROOM 107, 108 INSTALLED PER PLAN OK TO WRAP. VOLUME DAMPERS WILL BE AT GRILLS. Still need 24x14 transfer grills installed and 6" sauna vents. Sauna's will need to comply and be inspected to 2015 IMC section 914 | MARKB | MARKB | | HD | P | 6906599 |
HVAC SOLUTIONS, INC. | HD | P | 03/17/2021 | THIS INSPECTION WAS FOR MEN'S AND WOMEN'S LOCKER ROOMS ABOVE CEILING ONLY - SOMEONE NEEDS TO CLAIM ELECTRIC HEATERS - NEED TO SEAL ALL DUCT WORK THROUGH BOTH LOCKER ROOMS - MISSING 24 X 14 TRANSFER HOLES IN CORRIDOR X 2 - STOPPED INSPECTION | JERRYF | JERRYF | | HD | P | 6901921 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 04/26/2021 | | JOHNS | JOHNS | | P= | C | 6946863 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/19/2021 | Need drinking fountain installed / rest ok. | DANR | DANR | | P= | P | 6938200 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 03/24/2021 | mechanical room & water tie in @ water entry, ok. | DANR | DANR | | PTO | C | 6908803 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/18/2021 | Need inspection mechanical room and water tie in water entry / rest ok. Note: Discussed accessible elements. | DANR | DANR | | PTO | P | 6902759 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/16/2021 | Men's and Women's locker area DWV and domestic water: Need base and top plate nail protection / 2 - vent tie ins / insulation domestic water / rest ok this area. Note: Discussed accessible elements. | DANR | DANR | | PTO | P | 6899662 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 02/18/2021 | OK. | DANR | DANR | | PB | C | 6873782 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 02/12/2021 | Ok for DWV room 109 and stubbed into room 112. | DANR | DANR | | PB | P | 6869073 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 02/10/2021 | Ok for underground room 107, 108 and up to floor drain in 109. | DANR | DANR | | PB | P | 6865909 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 02/05/2021 | Inspected locker 105 to lavs in 107 / ok. | DANR | DANR | | PB | P | 6861146 |
HVAC SOLUTIONS, INC. | XMS | P | 07/26/2021 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised CFM | JUSTINC | JUSTINC | | XMS | P | 7048322 |