THOMAS GENERAL CONTRACTORS, INC. | B= | C | 05/14/2021 | structural steel and weld report uploaded. | NATHAN | NATHAN | | B= | C | 6968396 |
THOMAS GENERAL CONTRACTORS, INC. | BFN | C | 05/14/2021 | footer and open excavation uploaded. | NATHAN | NATHAN | | BFN | C | 6968395 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 02/26/2021 | Provide 3rd party pad, column and mezzanine floor observations, with completed required inspections B= okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PRESTIGE MECHANICAL CONTRACTORS,INC Mechanical Final Inspection is not Completed yet, PRESTIGE MECHANICAL CONTRACTORS,INC Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6883026 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 01/08/2021 | 2nd layer drywall at entry wall and door frame okay | NATHAN | NATHAN | | BFR | P | 6830558 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 01/06/2021 | Rated` Door frame and wall 1st layer drywall at both sides okay. | NATHAN | NATHAN | | BFR | P | 6826926 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 12/30/2020 | Top out of existing bathroom walls to deck with completed required inspections okay. | NATHAN | NATHAN | | BFR | P | 6822433 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 12/23/2020 | With completed required inspections frame okay at lower level / Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6818573 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 12/18/2020 | Complete MEP rough inspections / Provide engineers welding and bolting letter for mezzanine structure / Light gauge steel framing at mezzanine partition walls ok / No other framing inspected at this time | TIMOTHYS | TIMOTHYS | | BFR | P | 6813783 |
DILLER ELECTRIC LLC | E= | C | 02/03/2021 | | BRIAN | BRIAN | | E= | C | 6857835 |
DILLER ELECTRIC LLC | E= | P | 01/29/2021 | still need kitchen area / bathrooms / floor box es / ----rest ok | BRIAN | BRIAN | | E= | P | 6853657 |
DILLER ELECTRIC LLC | EUG | C | 01/19/2021 | break area / | BRIAN | BRIAN | | EUG | C | 6839364 |
DILLER ELECTRIC LLC | ER | C | 01/15/2021 | above ceiling--ok / | BRIAN | BRIAN | | ER | C | 6838531 |
DILLER ELECTRIC LLC | ER | P | 01/14/2021 | above ceiling ----- south office is missing ko plugs in 4 sq box rest ok / | BRIAN | BRIAN | | ER | P | 6837016 |
DILLER ELECTRIC LLC | ER | P | 01/06/2021 | 1st floor bathrooms walls ---ok / | BRIAN | BRIAN | | ER | P | 6827315 |
DILLER ELECTRIC LLC | ER | P | 12/23/2020 | 1st floor walls and bathroom hard lids--ok / | BRIAN | BRIAN | | ER | P | 6818297 |
DILLER ELECTRIC LLC | ER | P | 12/16/2020 | loft walls--ok / | BRIAN | BRIAN | | ER | P | 6809456 |
DILLER ELECTRIC LLC | ER | P | 12/11/2020 | back 3/4 of ceiling--ok / | BRIAN | BRIAN | | ER | P | 6805350 |
DILLER ELECTRIC LLC | ESL | C | 12/08/2020 | 2 floor boxes---ok / | BRIAN | BRIAN | | ESL | C | 6799855 |
PRESTIGE MECHANICAL CONTRACTORS,INC | H= | C | 03/01/2021 | PIPING PER REVISED PLAN SPLICE | JERRYF | JERRYF | | H= | C | 6884267 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HC | C | 03/01/2021 | RELEASE METER FOR ADDED LOAD | JERRYF | JERRYF | | HC | C | 6884266 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | C | 03/01/2021 | PIPING PER REVISED PLAN | JERRYF | JERRYF | | HI | C | 6884256 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 02/04/2021 | SPLICE ON FILE AND TAB REPORT HAS BEEN RECEIVED, MECHANICAL FINAL OK | BENH | BENH | | H= | C | 6859608 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 02/03/2021 | TAB REPORT RECEIVED, SEE IMAGES | BENH | BENH | | H= | P | 6857674 |
PRESTIGE MECHANICAL CONTRACTORS,INC | H= | P | 01/29/2021 | SEE HI NOTES FOR FINAL | JERRYF | JERRYF | | H= | P | 6853075 |
PRESTIGE MECHANICAL CONTRACTORS,INC | HI | P | 01/29/2021 | NEED APPROVED PLAN TO VERIFY SIZING BEFORE METER RELEASE NOTE / TEST OK / | JERRYF | JERRYF | | HI | P | 6853060 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | C | 01/14/2021 | ABOVE CEILING DUCT OK, WILL REQUIRE SPLICE FOR F-1 AND F-2 LATERALS SINCE DOESN'T MATCH PLANS BUT WILL PASS SINCE ALL DUCT IS EXPOSED,WILL ALSO NEED SPLICE FOR ALL EXHAUST BECAUSE SIZES HAVE CHANGED, NO ROOF TODAY, FOR FINAL WILL NEED TAB REPORT , SPLICES, CONTROLS COMPLETED AND ROOF INSPECTION TO VERIFY CLEARANCES | BENH | BENH | | HD | C | 6836363 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | C | 04/16/2021 | A.M.M. Approved for Drinking Fountains | LEE | LEE | | P= | C | 6936204 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | P | 03/17/2021 | SEE 401.1 2018 IPC -- ASME A112.19.1 OR A112.19.2 ARE ACCEPTABLE PER CODE | LEE | LEE | | P= | P | 6901939 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P=S | P | 03/16/2021 | P=S INSPECTION ? | LEE | LEE | | P=S | P | 6900341 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | P | 03/08/2021 | COULD NOT FIND INSTALLATION INSTRUCTIONS FOR DRINKING FOUNTAINS AS DISCUSSED ON PRIOR INSPECTION (1/2" DRAINS) -- REST OK -- MIN SIZE PER CODE IS 1-1/4" | LEE | LEE | | P= | P | 6891519 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | P | 03/01/2021 | LACKS HIGH LOOP AND HAMMER ARRESTOR AT DISHWASHER -- NEED ENGINEER APPROVAL FOR BOWL TYPE DRINKING FOUNTAINS WITH (1/2" DRAINS X-2) , CHANGED FROM ELKAY HIGH / LOW WITH BOTTLE FILLER ON PLANS | LEE | LEE | | P= | P | 6884242 |
PRESTIGE MECHANICAL CONTRACTORS,INC | P= | P | 01/29/2021 | TWO BACK RESTROOMS AND W/H ROOM, NEED TO CK W/H SIZE NEXT INSP | LEE | LEE | | P= | P | 6853903 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PB+ | C | 01/26/2021 | added break room sink | JOEL | JOEL | | PB+ | C | 6848641 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PTO | C | 12/30/2020 | Drinking Fountain traps in wall. | SAMH | SAMH | | PTO | C | 6822187 |
PRESTIGE MECHANICAL CONTRACTORS,INC | PB | C | 12/04/2020 | | SAMH | SAMH | | PB | C | 6796747 |
PRESTIGE MECHANICAL CONTRACTORS,INC | XPS | T | 03/05/2021 | PAID (REC#1754936): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: P2 adjusted fixture schedule | SHANEN | SHANEN | | XPS | T | 6889457 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | XMS | T | 02/03/2021 | PAID (REC#1747565): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas to as-built conditions | JUSTINC | JUSTINC | | XMS | T | 6857522 |
DILLER ELECTRIC LLC | XES | P | 01/22/2021 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Revise lighting | SHELBY | SHELBY | | XES | P | 6846566 |
PRESTIGE MECHANICAL CONTRACTORS,INC | XPS | P | 01/22/2021 | PLAN SPLICE FEE: $0 by: SHANEN for Plumbing: Delta 2 revisions: 3 sheets provided, P1 adjusted plumbing plan, P2 adjusted fixture schedule, added dishwasher hook-up detail, P3 adjusted isometrics | SHANEN | SHANEN | | XPS | P | 6845362 |
THOMAS GENERAL CONTRACTORS, INC. | XBS | T | 01/21/2021 | PAID (REC#1744757): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise demo and plans as required | MICHAELA | MICHAELA | | XBS | T | 6844529 |