CMG CORP | B= | C | 01/05/2022 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 7229752 |
CMG CORP | B= | P | 09/03/2021 | . Additional Inspections Required (computer generated): LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 7097414 |
CMG CORP | BFR | C | 03/16/2021 | With completed required inspections frame okay. | NATHAN | NATHAN | | BFR | C | 6899943 |
EL PASO ELECTRIC, LLC. | E= | C | 08/31/2021 | | BRIAN | BRIAN | | E= | C | 7092630 |
EL PASO ELECTRIC, LLC. | E= | R | 08/30/2021 | elect room locked / need to verify ocp / verify size of circuit fla on controller 46 amps ?? | BRIAN | BRIAN | | E= | R | 7090380 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 01/05/2022 | revisions made (on page 22) of plans | JOHNS | JOHNS | | P= | C | 7229751 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 12/03/2021 | STILL NEED to revise plans to show water entry piping is located in mens locker room closet
--on the revision also show bfp drain is now ran to fire riser room floor sink and to delete floor sink in the men's locker room closet (has pre existing floor drain 6' in front of the water entry closet in bath, rest ok | JOHNS | JOHNS | | P= | P | 7196503 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 09/13/2021 | NEED to revise plans to show water meter / water bfp / water entry is now inside closet of men's locker room (n lieu of outside structure meter pit per plans), STILL NEED to add 4" floor sink @ new water entry location (as noted on RECENT plan revisions) in men's locker room closet, rest ok for other revisions made | JOHNS | JOHNS | | P= | P | 7104634 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 08/13/2021 | --STILL NEED REVISIONS noted on 6/7/21 PTO notes--
--NEED TO REVISE PLANS to show new location of water entry and water entry piping--
--WILL NEED INSTALLER on site once plans are revised to re walk water entry and water entry piping
rest ok | JOHNS | JOHNS | | P= | P | 7071852 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 08/13/2021 | see P= NOTES, rest ok for remainder. NOTE: vtr (existing) | JOHNS | JOHNS | | PTO | C | 7071848 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 08/13/2021 | | JOHNS | JOHNS | | PB | C | 7071836 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/07/2021 | GC TO attach elec permit, MECH is n/a on plans
---NEED TO REVISE PLANS to show 2nd foor drain lines tied into bsmnt ejector, to show 2nd floor tie in for ejector, to show 6" drain @ 2nd floor for ejector tie in point, and to show 6" drain from 2nd floor to bsmnt pool area south east wall termination point---
ok for previous PTO corrections MINUS 4" over head tie in STILL NEED remainder
ok for bsmnt ejector tie ins @ 2 floor to city stub through south east pool room wall MINUS @ 2nd floor tie ins will need to use wye's in lieu of san-tee's
NOTE: vtr (existing) for ejector, verify access panel @ mens urinal @ final
ins note only-- PB in P status? | JOHNS | JOHNS | | PTO | P | 6992660 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 03/12/2021 | In wall for restroom and mop sink only: Need insulation, hammer arrestor, 4" overhead drain tie in. | DANR | DANR | | PTO | P | 6897845 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 02/16/2021 | Drain tie in from corridor to ejector pit ok. Note: ejector pits lid needs to be flush or above floor at final. | DANR | DANR | | PB | P | 6870502 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 02/12/2021 | Basement restrooms and water entry floor drain stubbed out to corridor ok. Note: need tie ins noted on 1/12/ 2021 inspection /. need tie in to existing and ejector.
| DANR | DANR | | PB | P | 6868885 |
LANDMARK PLUMBING AND HEATING, INC. | PB | L | 02/11/2021 | Canceled by contractor. | DANR | DANR | | PB | L | 6867368 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 01/12/2021 | Horizontal 6" Sewer main at basement complete. Verify tie ins at both ends at next inspection. | SAMH | SAMH | | PTO | P | 6833607 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 01/04/2022 | PAID (REC#1833840): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: Adjusted sheet P1. | SHANEN | SHANEN | | XPS | T | 7227119 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 09/07/2021 | PAID (REC#1805829): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 1 revisions: Adjusted sheet P1 and added sheet P2. | SHANEN | SHANEN | | XPS | T | 7097798 |
CMG CORP | XES | T | 05/06/2021 | PAID (REC#1771038): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: To add electrical | SHELBY | SHELBY | | XES | T | 6960536 |