ART C KLEIN CONSTRUCTION, INC. | B= | C | 07/22/2021 | | BOBF | BOBF | | B= | C | 7045738 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 02/03/2021 | drywall install on underside of ceiling framing per U 419 okay, this is a rated assembly that is not IBC required | BOBF | BOBF | | BFR | P | 6858314 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 02/02/2021 | drywall install on top of ceiling and both sides of walls per U 419 okay, please note, these rated assemblies are for other than IBC | BOBF | BOBF | | BFR | P | 6856323 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 02/01/2021 | pending completion of other required inspections, framing for ceiling per U 419 okay - please note ratings are for "other than IBC" | BOBF | BOBF | | BFR | P | 6855158 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 01/19/2021 | Wall framing rated for other than IBC per U419 okay , ceiling framing not completed | NATHAN | NATHAN | | BFR | P | 6840642 |
FOSTER ELECTRIC CORPORATION | E= | C | 06/18/2021 | FIRE ALARM INSPECTION: | CRAIG | CRAIG | | E= | C | 7007959 |
FOSTER ELECTRIC CORPORATION | E= | C | 06/18/2021 | FIRE ALARM INSPECTION: 3 new smokes and suppression ok | CRAIG | CRAIG | | E= | C | 7007943 |
FOSTER ELECTRIC CORPORATION | E= | C | 05/19/2021 | | CRAIG | CRAIG | | E= | C | 6974205 |
FOSTER ELECTRIC CORPORATION | E= | P | 04/22/2021 | picture of AIC labeling ok | CRAIG | CRAIG | | E= | P | 6942714 |
FOSTER ELECTRIC CORPORATION | E= | P | 04/21/2021 | install AIC label to panels --------- splice plans to show 3 phase mini splice 2.9 min / 15 max with 12 ga wire 65,000 at unit ----------- up load pictures for labeling to permit | CRAIG | CRAIG | | E= | P | 6941860 |
FOSTER ELECTRIC CORPORATION | EP | C | 04/21/2021 | 175 AMP 4/W TO NEW 112.5 XFMR THEN TO 400 AMP 4/W SUB PANEL ( ETLCR3 PANEL ) 225 AMP 4/W TO UPS | CRAIG | CRAIG | | EP | C | 6941848 |
FOSTER ELECTRIC CORPORATION | ES | P | 03/31/2021 | Commercial Service: had consultation with contractor | CRAIG | CRAIG | | ES | P | 6917630 |
FOSTER ELECTRIC CORPORATION | ER | P | 02/01/2021 | new walls for IT room ---------- 4 new lights / frog eyes / switches -------- plugs will be surface mounted | CRAIG | CRAIG | | ER | P | 6854898 |
TOLIN MECHANICAL SYSTEMS COMPANY, LLC | H= | C | 06/10/2021 | CEILING RADIATION DAMPERS AND SUPPORTS OK. CONDENSATE DRAINS OK. CONDENSING UNIT AND SUPPORTS OK. ALL INSTALLED AS PER PLAN. | BILLS | BILLS | | H= | C | 6998105 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 02/24/2021 | room 129 floor drain and aav (see images ) | TED | TED | | P= | C | 6878991 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 02/23/2021 | new added floor drain in I.T. room 129, (note: test and design ok, for 2'' trap, drain and vent, aav in ceiling) | TED | TED | | PB | C | 6877806 |
FOSTER ELECTRIC CORPORATION | XES | T | 06/21/2021 | PAID (REC#1783121): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revised panel schedule. | SHELBY | SHELBY | | XES | T | 7009071 |
FOSTER ELECTRIC CORPORATION | XES | T | 05/17/2021 | PAID (REC#1773566): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add cooling unit. | SHELBY | SHELBY | | XES | T | 6970698 |
TOLIN MECHANICAL SYSTEMS COMPANY, LLC | XMS | T | 02/17/2021 | PAID (REC#1750719): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: okay new splice relocate floor drain and condensation pump, | TCRIPPEN | TCRIPPEN | | XMS | T | 6872108 |