JAMES R. HOWELL & CO., INC. | B= | C | 04/07/2021 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 6924442 |
JAMES R. HOWELL & CO., INC. | B= | P | 04/02/2021 | Building final complete pending all other required finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), CUSTOM AIR INC Mechanical Final Inspection is not Completed yet. | ADAML | ADAML | | B= | P | 6920184 |
JAMES R. HOWELL & CO., INC. | BFR | C | 03/30/2021 | 3rd party letter for structural steel observations per 804 - A681 on file | ADAML | ADAML | | BFR | C | 6915053 |
JAMES R. HOWELL & CO., INC. | BFR | P | 02/04/2021 | Pending all other required inspections / Observed all light gauge metal non rated framing on walls and soffits / Need observation letter for structural steel bolting and welding on detail 804 A-681 above foldable partition in multi purpose room / Reviewed accessible elements | ADAML | ADAML | | BFR | P | 6859584 |
DYNALECTRIC COMPANY | E= | C | 03/30/2021 | | BRETC | BRETC | | E= | C | 6915199 |
DYNALECTRIC COMPANY | E= | C | 03/17/2021 | FIRE ALARM INSPECTION: FA Rough - Ok | BRETC | BRETC | | E= | C | 6901549 |
DYNALECTRIC COMPANY | ER | C | 03/17/2021 | FIRE ALARM INSPECTION: FA Rough - Ok | BRETC | BRETC | | ER | C | 6901548 |
DYNALECTRIC COMPANY | ER | P | 03/17/2021 | 2-clouds and 4 team rm ceilings - Ok / All Vav's in ceilings - Ok, check brkrs at final | BRETC | BRETC | | ER | P | 6901534 |
DYNALECTRIC COMPANY | ER | P | 03/02/2021 | All floor boxes on 2nd fl, ceilings on 1st fl --- Ok / Partial on 2n fl ceilings, DO NOT Tile --- Need FA, Lighting and VAV's wired | BRETC | BRETC | | ER | P | 6885565 |
DYNALECTRIC COMPANY | ER | P | 02/01/2021 | FIRE ALARM INSPECTION: Pipe Stub walls - Ok | BRETC | BRETC | | ER | P | 6854509 |
DYNALECTRIC COMPANY | ER | P | 02/01/2021 | All walls & 1 - hard lid soffit - Ok | BRETC | BRETC | | ER | P | 6854504 |
CUSTOM AIR INC | H= | C | 04/06/2021 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 6922714 |
CUSTOM AIR INC | H= | P | 03/25/2021 | PARTIAL PENDING TAB REPORT NOTES: PICTURES OF GRILLES AND CONTROLS RECEIVED | JERRYF | JERRYF | | H= | P | 6910060 |
CUSTOM AIR INC | H= | P | 03/11/2021 | MISSING RA GRILLES IN MULTI PROPOSE ROOM #239 - NEED THERMOSTATS LOWERED TO 48" TO TOP OR INSTALL LOCK BOXES AT ALL NEW CONTROLS - TAB REPORT (CONTRACTOR TO ATTACH PICTURES OF GRILLES AND CONTROLS TO TAB REPORT) | JERRYF | JERRYF | | H= | P | 6896623 |
CUSTOM AIR INC | HWP | P | 03/08/2021 | ALL CHILLED PIPING AND PRESSURE TESTS ARE OK | JERRYF | JERRYF | | HWP | P | 6892402 |
CUSTOM AIR INC | HD | P | 03/08/2021 | ALL BOXES AND MEDIUM PRESSURE TIE INS ARE COMPLETE | JERRYF | JERRYF | | HD | P | 6892397 |
CUSTOM AIR INC | HWP | P | 02/16/2021 | THIS INSPECTION WAS FOR THE FOLLOWING - STILL NEED ALL CHILLED LINES AND TIE INS AT BOXES WHEN READY NOTES: HWP SUPPLY AND RETURN MAINS INCLUDING CORRIDOR - TEST OK - PIPING PER PLAN - OK TO INSULATE | JERRYF | JERRYF | | HWP | P | 6871769 |
CUSTOM AIR INC | HD | P | 02/04/2021 | CONTRACTOR NEEDS TO ADD ALL HWP PIPING THE PERMIT WORK SCOPE - STILL NEED ALL BOXES / ALL DUCT WORK AT VAV - 4 -2 -28 / VAV 4 - 2 - 29 / VAV 4 - 2 -29A - STILL NEED ALL MEDIUM PRESSURE MAINS / TIE INS IN CORRIDOR AT SECOND LEVEL NOTES: THIS INSPECTION WAS FOR THE FOLLOWING - ALL LOW PRESSURE SA MAINS AND RUN OUTS OK TO WRAP | JERRYF | JERRYF | | HD | P | 6860373 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | P= | C | 03/31/2021 | | LEE | LEE | | P= | C | 6916559 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | P= | P | 03/30/2021 | STILL NEED to add floor sink to scope of work as previously noted, CAN complete w/ note in comment section stating "no on site visit required scope of work updated", rest ok | JOHNS | JOHNS | | P= | P | 6915786 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | P= | P | 03/30/2021 | INSULATION PICS OK -- STILL NEED ICE MAKER ON SITE FOR WATER AND DRAIN INSPECTION | LEE | LEE | | P= | P | 6914837 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | P= | P | 03/25/2021 | NEED OWNER SUPPLIED ICE MACHINE INSTALLED FOR DRAIN / WATER INSPECTION -- STILL NEED PERMIT DETAILS TO REFLECT TWO INSTA HOT, AND ONE FLOOR SINK -- REST OK | LEE | LEE | | P= | P | 6911267 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | PTO | C | 01/29/2021 | by final need to add 1 water heater and 1 floor sink to scope, note: at final check point of use water heater, contractor to provide photos of water pipe insulation at final, | JOSEPHD | JOSEPHD | | PTO | C | 6853974 |
DYNALECTRIC COMPANY | XES | T | 03/03/2021 | PAID (REC#1757080): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: For correct billing | SHELBY | SHELBY | | XES | T | 6887065 |
MTECH MECHANICAL TECHNOLOGIES GROUP, INC. | XPS | P | 03/03/2021 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Clouded revisions only: P-101 adjusted second floor partial plumbing plan, P-501 adjusted insulation schedule | SHANEN | SHANEN | | XPS | P | 6886425 |
CUSTOM AIR INC | XMS | T | 03/03/2021 | PAID (REC#1754271): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 6886393 |
DYNALECTRIC COMPANY | XES | T | 03/03/2021 | PAID (REC#1754253): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise panel schedules | SHELBY | SHELBY | | XES | T | 6886288 |
JAMES R. HOWELL & CO., INC. | XBS | T | 02/22/2021 | PAID (REC#1754039): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise some finishes | MICHAELA | MICHAELA | | XBS | T | 6875889 |