CRYSTAL ROSE CONSTRUCTION, LLC | B= | C | 07/30/2021 | Previous items corrected | TRENTP | TRENTP | | B= | C | 7055932 |
CRYSTAL ROSE CONSTRUCTION, LLC | B= | R | 07/29/2021 | Missing code compliant address numbers on house / Need to complete landing at interior of garage service door / Need seal wire penetration at stairs at garage/dwelling wall / Need to provide fire protection of floors in unfinished mechanical room over 80 sq ft / Missing guard/handrail at rear patio stairs, more than 30 inches of fall with in 36 inches of walking surface, 4 risers / Finished basement, front deck w/stairs, No AC | TRENTP | TRENTP | | B= | R | 7054176 |
CRYSTAL ROSE CONSTRUCTION, LLC | BSP | P | 07/29/2021 | Air leakage test results uploaded / | ERIKK | ERIKK | | BSP | P | 7053226 |
CRYSTAL ROSE CONSTRUCTION, LLC | BIN | C | 05/21/2021 | Items corrected / Will inspect attic insulation at final, need air leakage test results by final | TRENTP | TRENTP | | BIN | C | 6977348 |
CRYSTAL ROSE CONSTRUCTION, LLC | BIN | P | 05/20/2021 | Missing top plate air gasket | TIMOTHYS | TIMOTHYS | | BIN | P | 6976121 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFR | C | 05/18/2021 | Items corrected | CHAD | CHAD | | BFR | C | 6972672 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFR | P | 05/18/2021 | Engineer letter for frame items and manufactures clarification for gypsum fastening on file / Pending field inspection of corrections | TRENTP | TRENTP | | BFR | P | 6971692 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFT | C | 05/18/2021 | Footing observation with Eufer noted on file | TRENTP | TRENTP | | BFT | C | 6971633 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFN | C | 05/18/2021 | Footing observation with Eufer noted on file | TRENTP | TRENTP | | BFN | C | 6971625 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFR | R | 05/17/2021 | 1. Need to complete all foundation inspections prior to further inspection / 2. Anchor bolts not installed at middle third of sill plate at eastern garage wall / 3. Incorrect fasteners in all HHUS26-2s and HUS410s /4, Missing second HTS20 at T1G bearing point at front / 5. Need clarification from licensed design professional of framing for rear sliding glass door and steel beam bearing points in basement / 6. Please provide manufactures specs for styrofoam foundation blocks to ensure drywall may be attached and at least 24 inches OC / Front deck cover beam corrected / Finished basement, front deck | TRENTP | TRENTP | | BFR | R | 6971196 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFT | P | 05/17/2021 | Need to provide observation of Eufer / open hole on file -- 3000/4000 (garage/basement) -- usable -- 10% / footing and foundation observation on file - Eufer not noted / foundation design on file (bearing capacity verified) / | TRENTP | TRENTP | | BFT | P | 6970193 |
CRYSTAL ROSE CONSTRUCTION, LLC | BSP | P | 05/12/2021 | Inspection for front porch and rear porch lids, and front deck/rear cover piers / Front porch beam is still double 2x10, RBD stamped plans call for double 2x12 / Need to provide foundation design to confirm pier dimentions, inspector observed (2) 20x30 and (2) 26x30 inch piers for front deck and (2) 24x30 inch piers for rear cover / Rear cover lid okay, still need to inspect rear cover posts | TRENTP | TRENTP | | BSP | P | 6966179 |
CRYSTAL ROSE CONSTRUCTION, LLC | BSP | P | 05/12/2021 | Photo of front porch LUS's on file / Pending field inspection | TRENTP | TRENTP | | BSP | P | 6965331 |
CRYSTAL ROSE CONSTRUCTION, LLC | BSP | R | 04/28/2021 | FRONT PORCH LID - Drop beam to be (2) 2x12 - (2) 2x 10 installed / Missing sheer side fastener at 3rd LUS24 on J1 truss / | CHAD | CHAD | | BSP | R | 6950575 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFD | C | 02/19/2021 | Drain is usable to daylight at southwest, dampproofing okay / Note: Need to complete BFT and BFN | TRENTP | TRENTP | | BFD | C | 6875309 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFD | P | 02/19/2021 | Open hole on file, 3000 psf for garage area, 4000 psf for basement area / Drain design on file / Pending field inspection | TRENTP | TRENTP | | BFD | P | 6874713 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFN | P | 02/19/2021 | Inspection changed to BFN / Need to provide foundation design with bearing capacity stated / Eufer observation not mentioned in foundation observation / Need to provide soils report referenced in open hole to complete BFT / Footing and foundation observation on file | TRENTP | TRENTP | | BFN | P | 6874708 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFD | R | 02/09/2021 | Need drain design and soils report/open hole / A mix of two materials covering drain could not be identified, need design for clarification if these materials are acceptable, materials are not Murify 140 / Need material data for peel and stick sheets being used as dampproofing for ICF foundation / Need to complete BFT and BFN / Note: All foundation paperwork to be uploaded to permit electronically, in unsure how to upload images, use following link: https://youtu.be/QS0hdGSBA6o | TRENTP | TRENTP | | BFD | R | 6865200 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFT | P | 01/05/2021 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 6826144 |
CRYSTAL ROSE CONSTRUCTION, LLC | BFN | P | 01/05/2021 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 6826143 |
BOULTON ELECTRICAL SERVICES | E= | C | 07/26/2021 | | TOMC | TOMC | | E= | C | 7049168 |
BOULTON ELECTRICAL SERVICES | E= | P | 07/23/2021 | corrections made now bath receptacle circuits on 15 amp breaker? | BRET | BRET | | E= | P | 7046803 |
BOULTON ELECTRICAL SERVICES | E= | R | 07/19/2021 | need gfi protection in unfinished area , plug on common wall with stair storage has no power | TOMC | TOMC | | E= | R | 7040016 |
BOULTON ELECTRICAL SERVICES | E= | R | 07/13/2021 | need filler in outside panel , SER cable to sub-panel needs secured and protected , need gfi protection in garage , label sub-panel and main panel ------ complete re-inspection | TOMC | TOMC | | E= | R | 7034549 |
BOULTON ELECTRICAL SERVICES | ES | C | 05/27/2021 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | TOMC | TOMC | | ES | C | 6983122 |
BOULTON ELECTRICAL SERVICES | ER | C | 05/10/2021 | ER OK ----- | GREGM | GREGM | | ER | C | 6962649 |
BOULTON ELECTRICAL SERVICES | ER | R | 05/07/2021 | run grounding electrode conductor and attach to ufer, make up grounds at panel, close unused openings at top of panel (discussed working clearance, height and not having panel above stairs with builder), make up grounds in laundry and left of fireplace and upper room (several other boxes have NM hanging by them and I assume the NM is going to the boxes), make up all ex-fans, add outlets on both sides of handrails for 6' spacing, staple NM so it's not hanging below ceiling, install wiring for smoke detector thru entire house, missing front deck outlet, ground metal box at water heater, ------------------ complete re-inspect--------------- | MATTHEW | MATTHEW | | ER | R | 6961064 |
DESIGNED FOR COMFORT INC | H= | C | 07/26/2021 | WHOLE HOUSE VENTILATION SWITCH HAS BEEN LABELED. SEE IMAGES. | ANGELW | ANGELW | | H= | C | 7048389 |
DESIGNED FOR COMFORT INC | H= | P | 07/23/2021 | LABEL WHOLE HOUSE VENTILATION SWITCH IN LAUNDRY ROOM / OK TO ATTACH PICTURE WITH NEXT INSPECTION REQUEST / | ANGELW | ANGELW | | H= | P | 7047741 |
DESIGNED FOR COMFORT INC | HSP | P | 07/19/2021 | MECHANICAL SPLICE DATED 7/8/21 HAS BEEN APPROVED / GAS LINE WAS SIZED AT HI FOR TANKLESS WATER HEATER / VENT FOR TANKLESS WATER HEATER WAS INSPECTED AT ROUGH / ONSITE INSPECTION IS STILL REQUIRED | ANGELW | ANGELW | | HSP | P | 7039892 |
DESIGNED FOR COMFORT INC | H= | P | 07/16/2021 | NEED TO RESEARCH PLANS AND MAKE SURE DUCT DESIGN HAS BEEN UPDATED / ALL SUPPLY AIR REGISTERS WERE COVERED WITH PAINTERS PAPER AT TIME OF THIS INSPECTION WILL NEED TO RE-INSPECT ALL ROOMS TO CHECK FOR REGISTERS / LABEL WHOLE HOUSE VENTILATION FAN SWITCH / TANKLESS WATER HEATER HAS BEEN INSTALLED. WILL NEED TO VERIFY GAS LINE SIZING IS CAPABLE OF CARRYING 180,000 BTU TANKLESS WATER HEATER AT CURRENT LENGTH / Whole House Ventilation being achieved with exhaust fan located in laundry room / NOTES / NO A/C / NO OUTSIDE AIR TO FURNACE RETURN / FINISHED BASEMENT / DIRECT VENT FURNACE / DIRECT VENT TANKLESS WATER HEATER | ANGELW | ANGELW | | H= | P | 7039622 |
DESIGNED FOR COMFORT INC | HC | C | 05/14/2021 | RELEASE METER | SAMS | SAMS | | HC | C | 6969437 |
DESIGNED FOR COMFORT INC | HRR | C | 05/14/2021 | BY FINAL ADD SPLICE ON MECHANICAL PLANS SHOWING 18'' X 8'' SUPPLY DUCT IS APPROVED / | SAMS | SAMS | | HRR | C | 6969432 |
DESIGNED FOR COMFORT INC | HI | C | 05/12/2021 | 10 LB TEST OK / CORRECTION COMPLETED ON FIREPLACE GAS PIPING INSTALL / BY FINAL INSPECTOR TO VERIFY ACCESSIBLE SHUT OFF VALVES TO ALL APPLIANCES / | WHITNEYH | WHITNEYH | | HI | C | 6966609 |
DESIGNED FOR COMFORT INC | HI | P | 05/11/2021 | CANNOT USE 2 FLEX CONNECTORS TO CONNECT THE HARD PIPE TO THE FIREPLACE / BY FINAL VERIFY ALL GAS APPLIANCES HAVE AN ACCESSIBLE SHUT OFF VALVE / 10 LB TEST OK / 1 1/2 INCH MAIN / 1 FURNACE / 1 TANKLESS WATER HEATER / 1 RANGE / 1 DRYER / 1 FIREPLACE / | SAMS | SAMS | | HI | P | 6964620 |
DESIGNED FOR COMFORT INC | HI | P | 05/10/2021 | FIELD CANCELED BY CONTRACTOR | JERAMIEP | JERAMIEP | | HI | P | 6962685 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 05/10/2021 | MAIN LEVEL FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK / NON-COMBUSTIBLE MATERIALS INSTALLED / | JERAMIEP | JERAMIEP | | HV | C | 6962675 |
DESIGNED FOR COMFORT INC | HRR | P | 05/07/2021 | PER CONTRACTOR THE UPPER LEVEL BONUS ROOM WILL BE HEATED BY ELECTRIC BASEBOARD / CONTRACTOR STATES RETURN WILL BE ADDED ON A YET TO BE BUILT WALL BEHIND THE STAIRS IN THE BASEMENT / NO CHANGES WE'RE MADE / SEAL THE ENTIRE FURNACE CABINET TO THE DUCT BY FINAL | SAMS | SAMS | | HRR | P | 6961791 |
DESIGNED FOR COMFORT INC | HRR | P | 04/30/2021 | RETURN DUCTING INCOMPLETE / SUPPLY TRUNK-LINE INSIDE THEATER ROOM AND BEDROOM 3 TO REDUCE TO 12X8 (SECTION FEEDING THREE 6 INCH SUPPLIES AND ONE 8 INCH SUPPLY) CURRENTLY REMAINS 18X8 THROUGHOUT WILL NEED APPROVED PLAN SPLICE BY FINAL TO REFLECT CHANGE IN TRUNK-LINE SIZE / FURNACE AND WATER HEATER VENTING INCOMPLETE, MUST HAVE INSTALLATION MANUALS FOR APPLIANCES ON SITE AND VENT TERMINATIONS COMPLETED FOR VERIFICATION AT NEXT INSPECTION (PER CONTRACTOR ALL VENTING TO REMAIN WITHIN UNFINISHED MECHANICAL ROOM FOR INSPECTION IF APPLIANCES ARE STILL NOT IN PLACE BY NEXT INSPECTION / --UPPER LEVEL BONUS ROOM TO BE HEATED BY ELECTRIC BASEBOARD HEAT PER APPROVED PLANS--- Whole house ventilation being achieved with exhaust fan located in laundry room. / Verify whole house ventilation switch location at final / NOTE / FINISHED BASEMENT / NO OUTSIDE AIR TO FURNACE RETURN / (PER CONTRACTOR DIRECT VENT FURNACE, DIRECT VENT WATER HEATER) UNABLE TO VERIFY DUE TO LACK OF VENT INSTALLATION ON SITE / NO A/C | WHITNEYH | WHITNEYH | | HRR | P | 6954308 |
WOLVERINE CONSTRUCTION LLC | P= | C | 07/28/2021 | yard hydrant was eliminated | JOSEPHD | JOSEPHD | | P= | C | 7051715 |
WOLVERINE CONSTRUCTION LLC | P= | P | 07/27/2021 | still need RP for yard hydrant, and need to post non-potable sign on yard hydrant, other corrections made | JOSEPHD | JOSEPHD | | P= | P | 7050199 |
WOLVERINE CONSTRUCTION LLC | P= | P | 07/26/2021 | need RP for yard hydrant, need air gap at 1/2" drain down by water heater, if using pex for t&p will need to up size to 1" need air gap at t&p and need to support pex t&p, rest ok note: finished basement, no irrigation | JOSEPHD | JOSEPHD | | P= | P | 7048519 |
WOLVERINE CONSTRUCTION LLC | P= | P | 07/26/2021 | potable water certification in images | JOSEPHD | JOSEPHD | | P= | P | 7048096 |
WOLVERINE CONSTRUCTION LLC | P= | R | 07/19/2021 | no hot water re-inspect all, need potable water certification | JOSEPHD | JOSEPHD | | P= | R | 7040108 |
WOLVERINE CONSTRUCTION LLC | PWO | C | 06/02/2021 | | LEE | LEE | | PWO | C | 6987681 |
WOLVERINE CONSTRUCTION LLC | PTO | C | 05/11/2021 | insulation on hot water installed see images | JOSEPHD | JOSEPHD | | PTO | C | 6963799 |
WOLVERINE CONSTRUCTION LLC | PTO | P | 05/05/2021 | need to insulate all hot water piping 3/4 inch and larger/ recirc return lines, rest ok, finished basement, VTR x 2, check water service connections and water heater by final, note: need PWO inspection. | TAYLOR | TAYLOR | | PTO | P | 6958308 |
WOLVERINE CONSTRUCTION LLC | PB | C | 04/02/2021 | no water stubbing at this time, will need pwo inspection | JOSEPHD | JOSEPHD | | PB | C | 6919952 |
CRYSTAL ROSE CONSTRUCTION, LLC | XMS | T | 07/08/2021 | PAID (REC#1792494): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: revised duct design | TCRIPPEN | TCRIPPEN | | XMS | T | 7029089 |