SHARP GENERAL CONTRACTORS, INC | B= | C | 05/21/2021 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 6977366 |
SHARP GENERAL CONTRACTORS, INC | B= | P | 05/07/2021 | With completed required inspections B= okay. Additional Inspections Required (computer generated): AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6961191 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 03/31/2021 | Exterior wall framing for overhead doors okay with approved required inspection. | NATHAN | NATHAN | | BFR | P | 6917103 |
SHARP GENERAL CONTRACTORS, INC | BFR | P | 03/10/2021 | Need exterior bar to patio framing still, interior wall and bar framing with completed required inspections okay. | NATHAN | NATHAN | | BFR | P | 6895910 |
ELECTRIC TECH INC. | E= | C | 05/05/2021 | corrections made / MUA and KEF 15A / GFCI protection provide / mixer ok to hardwire per manufacturer / | MIGUEL | MIGUEL | | E= | C | 6958810 |
ELECTRIC TECH INC. | E= | P | 04/29/2021 | dining and bar area ok / seal raceways leading into coolers w/ duct seal / tables inmiddle of kitchen required to be GFCI protected , make sure in-use covers can open 90 degrees / mixer does not match plans , plans show 1ph 30A, mixer is 3ph 18A and could not locate in panel, can not cut cord to mixer and land in disconnect / verify plans and panel shedules match / still need roof and hood inspections / | MIGUEL | MIGUEL | | E= | P | 6952650 |
ELECTRIC TECH INC. | ER | P | 04/06/2021 | bar walls --ok / | BRIAN | BRIAN | | ER | P | 6923843 |
ELECTRIC TECH INC. | ER | P | 03/10/2021 | bar wall | JOHNN | JOHNN | | ER | P | 6895178 |
ELECTRIC TECH INC. | ESL | C | 02/18/2021 | | BRIAN | BRIAN | | ESL | C | 6874547 |
ELECTRIC TECH INC. | ER | P | 02/18/2021 | kitchen wall with new hood---ok / | BRIAN | BRIAN | | ER | P | 6874546 |
SHARP GENERAL CONTRACTORS, INC | FP= | C | 05/21/2021 | | KEITH | KEITH | BDA | FP= | C | 6977365 |
AIRTECH MECHANICAL, INC. | H= | C | 05/19/2021 | Correction made, see images / | MARKB | MARKB | | H= | C | 6973309 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 05/07/2021 | | MARKB | MARKB | | H= | C | 6961284 |
AIRTECH MECHANICAL, INC. | H= | P | 05/07/2021 | FINAL PENDING - Install missing eyebrow on makeup air unit. HOOD INTERLOCKS CONFIRMED & OTHER CORRECTIONS MADE. | MARKB | MARKB | | H= | P | 6961265 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 05/05/2021 | CANNOT CONFIRM REGULATOR FOR COOK LINE IS INSTALLED AND NEED TETHERS INSTALLED ON CONVEYOR PIZZA OVEN. | MARKB | MARKB | | H= | P | 6957956 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 05/05/2021 | ADDING LOAD TO METER PER PLAN | MARKB | MARKB | | HC | C | 6957948 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 05/05/2021 | PLAN SPLICE ON FILE. PIPING ON ROOF OK. | MARKB | MARKB | | HI | C | 6957944 |
AIRTECH MECHANICAL, INC. | H= | R | 05/04/2021 | NOT READY - condensate piping for cooler not complete. New hood grease clean out not wrapped per manufacturer instructions. Need install instructions for conveyor pizza oven. Install grease cups. Need to confirm hood interlocks. Corner of pizza oven off ground - only supported by 3 wheels. Grease fan not complete on roof. Makeup air unit on roof not complete. STOPPED INSPECTION. | MARKB | MARKB | | H= | R | 6956246 |
AIRTECH MECHANICAL, INC. | H= | L | 04/28/2021 | NOT READY | MARKB | MARKB | | H= | L | 6950243 |
AIRTECH MECHANICAL, INC. | HSP | P | 04/28/2021 | Test and balance Received - engineer to address cfm's in equipment schedule do not match required balance schedule and diffuser totals do not match equipment schedule. What are the correct numbers? | MARKB | MARKB | | HSP | P | 6949478 |
AIRTECH MECHANICAL, INC. | HD | P | 04/20/2021 | FOR FINAL - Still need plan splice, new hood clean out not wrapped per wrap instructions, neew to confirm interlocks and equipment on roof. FLEX AND DIFFUSERS ABOVE KITCHEN AND BACK AREA COMPLETE | MARKB | MARKB | | HD | P | 6940053 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 04/05/2021 | ROOF PLAN DOES MATCH INSTALLED - HAS 1/2" MEDIUM PRESSURE MAIN LINE WHERE PLAN SHOWS 1 1/2" NEED PLAN REVISION BEFORE METER RELEASE (CONTRACTOR PROCEEDING AT OWN RISK) NOTES: INTERIOR PIPING PER PLAN AND PRESSURE TEST OK - ROOF LINE PRESSURE TEST OK | JERRYF | JERRYF | | HI | P | 6921581 |
AIRTECH MECHANICAL, INC. | HSP | P | 03/31/2021 | FOR FINAL - Address grease duct notes from 3/31/21. Install cooling for makeup air unit. Install supply/return grills in kitchen. Confirm interlocks, install equipment under hoods, perform roof inspection and provide test and balance report. | MARKB | MARKB | | HSP | P | 6916792 |
AIRTECH MECHANICAL, INC. | HD | P | 03/31/2021 | ----NEED APPROVED PLAN SPLICE FOR GREASE DUCT---- NEW HOOD - Engineer to address curb extended 6' above roof and how servicing. Need steel plate removed from access door to see how door is wrapped. RELOCATED EXISTING HOOD - 2ND LAYER OF GREASE WRAP AND BANDS COMPLETE MAKEUP AIR DUCT AND INSULATION COMPLETE TO BOTH HOODS. | MARKB | MARKB | | HD | P | 6916782 |
AIRTECH MECHANICAL, INC. | HD | P | 03/30/2021 | RELOCATED EXISTING HOOD: ----EXISTING DUCT SIZE NOT PER PLAN---- GREASE DUCT LIGHT TEST - LIGHT TEST FOR SEALING UP ACCESS OPENING ABOVE LEFT HOOD COLLAR OK. WRAP - 1ST LAYER OF WRAP OK TO INSTALL 2ND LAYER AND BANDS | MARKB | MARKB | | HD | P | 6915514 |
AIRTECH MECHANICAL, INC. | HD | P | 03/29/2021 | RELOCATED EXISTING HOOD: ----EXISTING DUCT SIZE NOT PER PLAN---- LIGHT TEST - LIGHT TEST IS COMPLETE FOR RELOCATED HOOD AND GREASE DAMS ADDRESSED. If closing up access point above left collar, will need a light test on patch. Cannot mix different brands of wrap - either complete with existing brand type or re wrap entire duct with with new same brand. CONTINUE AT OWN RISK. | MARKB | MARKB | | HD | P | 6913608 |
AIRTECH MECHANICAL, INC. | HD | R | 03/26/2021 | EXISTING HOOD: ----GREASE DUCT NOT PER PLAN---- LIGHT TEST - LIGHT TESTED NEW HORIZONTAL SECTION AND FOUND 1 HOLE IN MIDDLE TOP. Stopped light test - Contractor to correct grease dams at both ends of horizontal section. NEW HOOD - FIRST LAYER OF WRAP OK. Will need access door installed and wrap per manufacturer instructions. | MARKB | MARKB | | HD | R | 6911811 |
AIRTECH MECHANICAL, INC. | HD | P | 03/24/2021 | ----ENGINEER TO ADDRESS: For new hood approved plans and Captive Aire drawings show 2 - 10" hood outlet collars but hood on site that matches model number only has 1 - 14" outlet GREASE DUCT LIGHT TEST - LIGHT TEST ON NEW HOOD COMPLETE FROM CURB TO HOOD COLLAR. Will need to support grease duct and provide cleanout at change in direction. CONTINUE AT OWN RISK. | MARKB | MARKB | | HD | P | 6909478 |
AIRTECH MECHANICAL, INC. | HD | P | 03/22/2021 | LIGHT TEST COMPLETED AT SHOP FOR ROUND GREASE DUCT MARKED WITH ORANGE PAINT - ALL MARKED DUCT OK | JERRYF | JERRYF | | HD | P | 6906032 |
AIRTECH MECHANICAL, INC. | HD | P | 02/17/2021 | HOOD WALL OK FOR ZERO CLEARANCE AT NEW LOCATION - NEED SECOND HOOD ADDED TO PERMIT WORK SCOPE | JERRYF | JERRYF | | HD | P | 6872456 |
AIRTECH MECHANICAL, INC. | HSP | P | 02/02/2021 | HAD CONSULT WITH WALT FROM AIR TECH ON NEW HOOD WALL CONSTRUCTION | JERRYF | JERRYF | | HSP | P | 6856244 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 05/12/2021 | See splice. | DANR | DANR | | P= | C | 6965455 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 05/12/2021 | See splice. | DANR | DANR | | PTO | C | 6965452 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 05/05/2021 | Can complete PTO and final pending Splice approval for added line for MAU make up water and backflow protection. | DANR | DANR | | P= | P | 6957589 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 05/04/2021 | Need PTO completed / need plans splice for added MAU make up water and drain, need backflow protection / need all kitchen ceiling inspection / need all bar area inspection / rest ok. | DANR | DANR | | P= | P | 6956216 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 04/05/2021 | Added 1/2" stub on North wall of bar for bottle washer: Need plans splice and nail protection / pictures ok for nail protection. | DANR | DANR | | PTO | P | 6921329 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 03/16/2021 | BAR AREA OK | LEE | LEE | | PTO | P | 6900491 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 03/11/2021 | Bar area only: Low test cold water / finish nail protection and isolators / cannot do horizontal offset on vent below flood level rim / need insulation hot lines. | DANR | DANR | | PTO | P | 6896317 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 03/10/2021 | NOT READY, WANTED BAR AREA, LOST TEST AND ISOLATION CLAMPS INCOMPLETE | LEE | LEE | | PTO | P | 6894636 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 02/19/2021 | UNDERSLAB H20 OK -- FLOOR SINK IN KITCHEN OK -- STILL NEED HAND SINK | LEE | LEE | | PB | P | 6875304 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 02/16/2021 | BAR AREA OK MINUS 1" H20 IN DITCH PER PLAN-- STILL NEED HAND SINK IN KITCHEN | LEE | LEE | | PB | P | 6871177 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 05/11/2021 | PAID (REC#1771999): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 8 revisions: P1.1 adjusted plumbing plan, added detail | SHANEN | SHANEN | | XPS | T | 6963898 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 05/03/2021 | PAID (REC#1769493): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 6954602 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | P | 04/08/2021 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 5 revisions: P1.1 adjusted plumbing plan | SHANEN | SHANEN | | XPS | P | 6926210 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 04/08/2021 | PAID (REC#1763448): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 6926055 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 03/02/2021 | PAID (REC#1755644): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: P0.1 adjusted fixture schedule, P1.1 adjusted plumbing plan. | SHANEN | SHANEN | | XPS | T | 6884717 |
ELECTRIC TECH INC. | XES | T | 02/22/2021 | PAID (REC#1752340): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | T | 6877413 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 02/11/2021 | PAID (REC#1750330): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: 1 revised sheet provided, P1.1 adjusted plan to show existing plumbing equipment on drawing | SHANEN | SHANEN | | XPS | T | 6867374 |