T-BONE CONSTRUCTION, INC. | B= | C | 08/24/2021 | | NATHAN | NATHAN | | B= | C | 7083791 |
T-BONE CONSTRUCTION, INC. | B= | P | 07/13/2021 | With completed required inspections frame okay. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES INC. Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 7033564 |
T-BONE CONSTRUCTION, INC. | BFR | P | 07/13/2021 | With completed required inspections frame okay. | NATHAN | NATHAN | | BFR | P | 7033544 |
T-BONE CONSTRUCTION, INC. | BFR | P | 07/12/2021 | With completed required inspections drywall attachment okay at above ceiling over doors, firestop and mud and tape needed. | NATHAN | NATHAN | | BFR | P | 7031959 |
T-BONE CONSTRUCTION, INC. | BSP | P | 06/25/2021 | Damper framing is a mechanical inspection and support must be per 1 of 2 support methods in the engineer design presented to RBD uploaded to images. Recall mechanical inspection when the support is corrected and then make sure the framing above the entry matches plan or splice the plan for design change. | NATHAN | NATHAN | | BSP | P | 7015988 |
T-BONE CONSTRUCTION, INC. | BFR | P | 04/01/2021 | Need mechanical inspection for damper framing, joint detail fire stopping and above ceiling marking at both sides of the entry wall still needed. | NATHAN | NATHAN | | BFR | P | 6918837 |
T-BONE CONSTRUCTION, INC. | BFR | P | 02/01/2021 | THIS IS A IEBC PERMIT, rated wall, door and window framing for new corridor entry not done, all office walls okay with completed required inspections, | NATHAN | NATHAN | | BFR | P | 6854872 |
T-BONE CONSTRUCTION, INC. | E= | C | 04/22/2021 | | BRIAN | BRIAN | | E= | C | 6943439 |
T-BONE CONSTRUCTION, INC. | ER | C | 04/22/2021 | ceilings--ok / | BRIAN | BRIAN | | ER | C | 6943429 |
T-BONE CONSTRUCTION, INC. | ER | P | 02/03/2021 | walls --ok / | BRIAN | BRIAN | | ER | P | 6858120 |
T-BONE CONSTRUCTION, INC. | ER | R | 02/01/2021 | light switches are to high, 48" max to the top / Discussed accessibility requirements with contractor / | BRIAN | BRIAN | | ER | R | 6855349 |
PIPE LINE SPECIALTIES INC. | H= | C | 08/20/2021 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES / | MARKB | MARKB | | H= | C | 7079189 |
PIPE LINE SPECIALTIES INC. | HSP | P | 07/12/2021 | DAMPERS COMPLETE. NEED TEST AND BALANCE REPORT FOR FINAL | JON | JON | | HSP | P | 7032650 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/08/2021 | DAMPER FRAMING, ANNULAR SPACE AND BREAK AWAY CONNECTIONS OK BUT WILL NEED TO FILL IN GAP AT BOTTOM OF DAMPER OPENING AT LIGHT GAUGE ANGLE BEFORE SHEET ROCK IS INSTALLED. CONTRACTOR TO TAKE PICTURES IF PROCEEDING AT OWN RISK. | MARKB | MARKB | | HD | P | 7029447 |
PIPE LINE SPECIALTIES INC. | HSP | P | 07/06/2021 | On site consult with mechanical contractor and architect - Installing damper to engineer option #1 - see permit images. DAMPER FRAMING - Cannot have holes in damper framing into damper opening. Tabs on top plate need to be bent up out of opening per manufacturer instructions. Need correct annular space around damper keeping in mind damper angles need to over lap drywall by a minimum of 1". Will need proper break away connections on duct. Contractor will need to provide ladder tall enough at next inspection to see top of damper. | MARKB | MARKB | | HSP | P | 7026136 |
PIPE LINE SPECIALTIES INC. | H= | P | 06/18/2021 | COULD NOT PERFORM PROPER INSPECTION. DID NOT HAVE INSTRUCTIONS FOR LLOYD DAMPERS PER ENGINEER DETAIL. INITIAL INSPECTION SHOWS WE ARE MISSING PROPER FRAMING, FRAMING MEMBERS ETC. APPEARS THERE WILL NEED TO BE A BSP AND AN HSP INSPECTION WITH THE FRAMING CONTRACTOR TO ACHIEVE PROPER FRAMING PER DETAIL AND MUST HAVE PROPER DAMPER INSTRUCTIONS FROM DAMPER MANUFACTURER CALLED OUT ON ENGINEERED DETAILS AND LETTER. | JON | JON | | H= | P | 7008266 |
PIPE LINE SPECIALTIES INC. | HSP | P | 06/07/2021 | DESIGN PROFESSIONAL AND MANUFACTURER LETTER FOR DAMPER SUPPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | HSP | P | 6992424 |
PIPE LINE SPECIALTIES INC. | HSP | P | 05/14/2021 | MET ON SITE WITH NATHAN (PLS) TO DISCUSS FIRE DAMPER INSTALL - NEED ENGINEER TO GIVE A DETAIL FOR HOW TO SUPPORT FIRE DAMPERS BECAUSE DAMPER INSTRUCTIONS DO NOT SHOW SUPPORT ABOVE GLASS WALL. WILL NEED PROPER BREAK-AWAY CONNECTIONS, ANNULAR SPACE, ANGLES AND ACCESS PANELS INSTALLED. STILL NEED ENGINEER TO ADDRESS RETURN AIR FOR OFFICES BACK TO MAIN ROOM. | MARKB | MARKB | | HSP | P | 6969797 |
PIPE LINE SPECIALTIES INC. | HSP | R | 05/07/2021 | ----ENGINEER TO ADDRESS THE FOLLOWING: Fire/smoke dampers were removed and replaced with fire only dampers. What happens to old fire/smoke controls now just left above ceiling? Fire dampers are installed above glass wall, how are we meeting the intent of the manufacturer instructions for support. How does return air get from hall 203 to room 201?---- FIRE DAMPERS WERE INSTALLED AND COVERED PRIOR TO ANY DAMPER INSPECTIONS. 8" ROUND SUPPLY TO RM 205 IS TRANSITIONED TO RECTANGLE DUCT OVER RM 204 WITH SMALLER SQUARE INCHES. NO CHILLED OR HEAT PIPING INSPECTION WERE CALLED. MOST OF NEW WORK WAS COVERED ABOVE CEILING WITHOUT PROPER INSPECTIONS. ADD NEW FAN COIL UNIT TO PERMIT SCOPE. | MARKB | MARKB | | HSP | R | 6961735 |
GOLD RUSH PLUMBING | P= | C | 04/21/2021 | See images. | DANR | DANR | | P= | C | 6941251 |
GOLD RUSH PLUMBING | P= | P | 04/08/2021 | Need flooring installed to verify height of sink ( currently at 34-1/2", cannot be over 34"), picture ok / rest ok. | DANR | DANR | | P= | P | 6926570 |
GOLD RUSH PLUMBING | PTO | C | 03/04/2021 | SINK TIED INTO EXISTING VTR | LEE | LEE | | PTO | C | 6888815 |