WELLS & WEST GENERAL CONTRACTORS, INC. | B= | C | 05/17/2021 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 6970187 |
WELLS & WEST GENERAL CONTRACTORS, INC. | B= | P | 05/11/2021 | Building final complete. Additional Inspections Required (computer generated): PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 6964703 |
WELLS & WEST GENERAL CONTRACTORS, INC. | BFR | P | 02/16/2021 | pending other required inspections / interior light gauge steel framing OK / reviewed accessible elements with site rep | LONNYS | LONNYS | | BFR | P | 6871754 |
PROCOM ELECTRICAL SERVICES, INC. | E= | C | 05/04/2021 | | BRETC | BRETC | | E= | C | 6956405 |
PROCOM ELECTRICAL SERVICES, INC. | ER | C | 04/09/2021 | Bond Transformer to water in serving area of transformer, will look at on final / Leave tile out at VAV for final / 30 KVA ceiling transformer rest - Ok | BRETC | BRETC | | ER | C | 6928204 |
FIRE ALARM SERVICES, INC. | E= | C | 04/09/2021 | FIRE ALARM INSPECTION: | BRETC | BRETC | | E= | C | 6928223 |
FIRE ALARM SERVICES, INC. | ER | C | 04/09/2021 | FIRE ALARM INSPECTION: 2 ceiling & 1 wall device - Ok | BRETC | BRETC | | ER | C | 6928224 |
PROCOM ELECTRICAL SERVICES, INC. | ER | P | 03/04/2021 | Two short walls w/panel - Ok | BRETC | BRETC | | ER | P | 6888055 |
PROCOM ELECTRICAL SERVICES, INC. | ER | P | 02/16/2021 | Walls only - Ok / Panel R3B & XFormer ---- to be determined location | BRETC | BRETC | | ER | P | 6871066 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 05/17/2021 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6970186 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 05/12/2021 | FINAL PENDING : NEED TEST AND BALANCE REPORT./ | LIDO | LIDO | | H= | P | 6966038 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 04/16/2021 | MISSING TF-1 THERMOSTAT / MISSING RETURN AIR IN ROOM # 205 / LABEL ALL THERMOSTATS FOR VAV THEY CONTROL / NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 6937508 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 04/07/2021 | STILL NEED DUCT ROUGH FOR TF-1 FAN / REST OF ABOVE CEILING DUCT ROUGH COMPLETE / MISSING RETURN AIR GRILL ROOM #205 / FPB-1 FAN AND DUCT ROUGH OK / ALL SUPPLY GRILLS COMPLETE / | LIDO | LIDO | | HD | P | 6925447 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 03/31/2021 | ABOVE CEILING ROUGH : STILL NEED THE FOLLOWING -TF-1 FAN AND DUCT INSTALLED, FPB-1 AND DUCT , ALL RETURN AIR GRILLS ,THERMOSTATS AND TEST AND BALANCE REPORT / ALL VAV'S , ALL SUPPLY DUCT ROUGH, SUPPLY FLEX DUCT AND GRILLS OK / | LIDO | LIDO | | HD | P | 6917349 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 04/30/2021 | | LEE | LEE | | P= | C | 6953200 |
FRONTIER MECHANICAL SYSTEMS INC | P= | R | 04/28/2021 | STILL MISSING HAMMER ARRESTOR AT DISHWASHER -- HIGH LOOP STILL NOT HIGH AS POSSIBLE | LEE | LEE | | P= | R | 6950525 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 04/20/2021 | NEED FULL FLOW GATE VALVE UPSTREAM OF CHECK VALVE AT EJECTOR -- INSTALL HAMMER ARRESTOR AT DISHWASHER -- HIGH LOOP APPROX. 4-1/2" TOO LOW | LEE | LEE | | P= | P | 6939858 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 02/16/2021 | WASTE ON LEFT, VENT ON RIGHT | LEE | LEE | | PTO | C | 6870732 |
PROCOM ELECTRICAL SERVICES, INC. | XES | T | 03/16/2021 | PAID (REC#1758409): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Relocate 30 KVA XFMR and panel R3B. | SHELBY | SHELBY | | XES | T | 6900937 |