CMG CORP | B= | C | 06/23/2021 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 7012126 |
CMG CORP | B= | P | 06/09/2021 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6996501 |
CMG CORP | BFR | P | 05/20/2021 | office frame of 103-105 okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 6975938 |
CMG CORP | B= | P | 05/14/2021 | Need frame and inspection of 103-105 still, office area 100,101,102,106,107,109,113 with completed required inspections okay. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6969006 |
CMG CORP | BSP | T | 04/14/2021 | PAID (REC#1764691): ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Expanded suite and revised floor plan. | SHELLEY | SHELLEY | | BSP | T | 6933303 |
CMG CORP | BFR | P | 03/29/2021 | offices 103-105 not ready at this time , with completed required inspections remaining framing okay, Reviewed Accessible Elements / | NATHAN | NATHAN | | BFR | P | 6914170 |
EL PASO ELECTRIC, LLC. | E= | C | 06/07/2021 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 6992819 |
EL PASO ELECTRIC, LLC. | ER | C | 06/07/2021 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 6992818 |
EL PASO ELECTRIC, LLC. | E= | C | 06/07/2021 | | BRIAN | BRIAN | | E= | C | 6992804 |
EL PASO ELECTRIC, LLC. | ER | C | 06/07/2021 | ceiling phase 2 / | BRIAN | BRIAN | | ER | C | 6992802 |
EL PASO ELECTRIC, LLC. | ER | P | 05/21/2021 | cancelled by contractor / | BRIAN | BRIAN | | ER | P | 6977136 |
EL PASO ELECTRIC, LLC. | ER | P | 05/20/2021 | walls in phase 2 ---ok / | BRIAN | BRIAN | | ER | P | 6976154 |
EL PASO ELECTRIC, LLC. | ER | P | 05/06/2021 | ceilings in phase 1 ---ok / | BRIAN | BRIAN | | ER | P | 6959601 |
EL PASO ELECTRIC, LLC. | ER | R | 05/05/2021 | J-box laying on duct -- J-boxes with wires hanging out of them -- MC laying on water and gas pipes -- MC not terminated laying on grid -- Strap MC no more than 6' intervals -- Secure ceiling wires to grid -- Flag ceiling wires -- Complete FA --- | LOGANP | LOGANP | | ER | R | 6957845 |
EL PASO ELECTRIC, LLC. | ER | R | 04/29/2021 | need fire alarm permit and completed / missing ko plugs and mc laying on the sprinkler pipe / j box with wires hanging out / | BRIAN | BRIAN | | ER | R | 6951814 |
EL PASO ELECTRIC, LLC. | ER | P | 03/29/2021 | walls on east side of unit---ok / | BRIAN | BRIAN | | ER | P | 6913515 |
EL PASO ELECTRIC, LLC. | ER | R | 03/26/2021 | no access / | BRIAN | BRIAN | | ER | R | 6912523 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 06/23/2021 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES / | MARKB | MARKB | | H= | C | 7012125 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 06/09/2021 | Mechanical final ok pending receipt of test and balance report / ABOVE CEILING DUCT AND DIFFUSERS COMPLETE FOR ROOMS 103, 104 & 105
| MARKB | MARKB | | H= | P | 6996316 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 05/12/2021 | FLEX, DIFFUSERS AND RETURN GRILLS COMPLETE FOR ROOMS 100, 101, 102, 106, 107, 109, 110 & 113 | MARKB | MARKB | | H= | P | 6966375 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/12/2021 | ABOVE CEILING DUCT - ROUGH DUCT COMPLETE FOR ROOMS 100, 101, 102, 106, 107, 109, 110 & 113 | MARKB | MARKB | | HD | P | 6966371 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/21/2021 | Ok. | DANR | DANR | | P= | C | 7008912 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 06/21/2021 | | DANR | DANR | | PTO | C | 7008908 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 06/10/2021 | Need PTO items completed rest ok. | DANR | DANR | | P= | P | 6997443 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/10/2021 | Support all over head pipe and test to code / need engineers approval for 1-1/2" PVC pump discharge pipe with plenum wrap (drawings show 2" pipe) / Need plenum wrap PVC pipe in R/ A plenum / | DANR | DANR | | PTO | P | 6997441 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 03/29/2021 | In wall DWV and domestic water only: Drain line not piped per plan, contractor stated they are installing ejector pump / need plans splice for ejector pump / how is the ejector pump venting? / domestic water ok. Note: Discussed accessible elements. | DANR | DANR | | PTO | P | 6913409 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 06/16/2021 | PAID (REC#1782775): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: Adjusted sheet P0.1. | SHANEN | SHANEN | | XPS | T | 7003837 |
EL PASO ELECTRIC, LLC. | XES | P | 04/15/2021 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Added one office to scope and two circuits to breakroom. | SHELBY | SHELBY | | XES | P | 6934744 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | P | 04/15/2021 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Added scope | JUSTINC | JUSTINC | | XMS | P | 6934707 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 04/14/2021 | PAID (REC#1772418): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: P0.1 adjusted fixture schedule and plumbing plan | SHANEN | SHANEN | | XPS | T | 6933736 |
CMG CORP | XMS | T | 03/12/2021 | PAID (REC#1756832): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised background and layout | JUSTINC | JUSTINC | | XMS | T | 6898919 |
CMG CORP | XPS | P | 03/12/2021 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 1 revisions: P0.1 adjusted plumbing plan | SHANEN | SHANEN | | XPS | P | 6898901 |
CMG CORP | XES | T | 03/12/2021 | PAID (REC#1756831): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise floor plan | SHELBY | SHELBY | | XES | T | 6898856 |
CMG CORP | XBS | T | 03/12/2021 | PAID (REC#1756830): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Added additional area to scope; increase occupant load | LBENNETT | LBENNETT | | XBS | T | 6898511 |