HENSEL PHELPS CONSTRUCTION CO | B= | C | 05/06/2022 | | LONNYS | LONNYS | | B= | C | 7366908 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 04/07/2022 | light gauge framing at 4 bathrooms at pod 22 OK pending other roughs | DANE | DANE | | BFR | P | 7330005 |
HENSEL PHELPS CONSTRUCTION CO | BE | P | 12/15/2021 | | MATTHEWM | MATTHEWM | | BE | P | 7209693 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 09/01/2021 | Building final for rooms in area 123 only / pending other required inspections / all 4 rooms shower seats measured 19-1/2 " to 20" from floor to top of seat / missing 1-1/2" clearance from horizontal grab bars to shower controls escutcheons rooms A2304, A2306, and A2314 / rest of building final OK -- Schedule a new Building Final when above items are complete. UPDATE: BY Lonny S on 9-2-21 / after further inspection scope of work not intended to bring existing bathrooms up to current accessibly requirements - area 123 final OK pending other finals Additional Inspections Required (computer generated): ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7093483 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 08/06/2021 | pending other roughs / interior light gauge steel framing at furred out walls in area 123 OK / reviewed accessible elements with site rep | LONNYS | LONNYS | | BFR | P | 7063347 |
ENCORE ELECTRIC, INC. | E= | C | 04/28/2022 | | RANDY | RANDY | | E= | C | 7355993 |
ENCORE ELECTRIC, INC. | ED | P | 04/07/2022 | 2208,2210,2216,2218 bathrooms | RANDY | RANDY | | ED | P | 7329555 |
ENCORE ELECTRIC, INC. | EE | L | 03/15/2022 | Renewed online for Half Fee at Mar 15 2022 10:35AM (RECEIPT #: 1850622) | WEBSITE | WEBSITE | | EE | L | 7301516 |
ENCORE ELECTRIC, INC. | ER | P | 08/10/2021 | Demo per print. Two bathrooms. | AARONR | AARONR | | ER | P | 7066355 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 04/29/2022 | UNDERFLOOR ALSO OK ON LAST FOUR SHOWERS PER PICS | LEE | LEE | | P= | C | 7358424 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 04/12/2022 | Engineers letter for showers uploaded to images. | DANR | DANR | | P= | P | 7334765 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/07/2022 | shower valves in units 2216,2216,2208,2210 south tower ok, need to see drains completed | JOSEPHD | JOSEPHD | | PTO | P | 7329644 |
OLSON PLUMBING & HEATING COMPANY | PE | L | 04/06/2022 | Renewed online for Half Fee at Apr 6 2022 1:05PM (RECEIPT #: 1856517) | WEBSITE | WEBSITE | | PE | L | 7328479 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 09/02/2021 | after further review all west side units ok, just need engineer letter for fixed shower head | JOSEPHD | JOSEPHD | | P= | P | 7095815 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/30/2021 | all west side units under floor ok | JOSEPHD | JOSEPHD | | PTO | P | 7089684 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 08/30/2021 | will need to conduct more research into shower valve heights in units 2314 and 2304 will update notes tomorrow, need engineer letter for elimination of fixed shower heads, other units on west side ok | JOSEPHD | JOSEPHD | | P= | P | 7089682 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/10/2021 | inspection for west side bathrooms only, fixed shower head not in approved location, per ipc Colorado state amendment 417.7 and 417.8, need nail protection on water lines to shower valves thru out, rest of in-wall ok, still need to see under floor completed, still need to see east side bathrooms | JOSEPHD | JOSEPHD | | PTO | P | 7067022 |
HENSEL PHELPS CONSTRUCTION CO | XES | P | 03/25/2021 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Nurse call revisions | SHELBY | SHELBY | | XES | P | 6910667 |
HENSEL PHELPS CONSTRUCTION CO | XPS | T | 03/25/2021 | PAID (REC#1759835): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 1 revisions: P001 adjusted fixture schedule, P102 adjusted second floor domestic plan, P103 added new sheet | SHANEN | SHANEN | | XPS | T | 6910254 |