GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 08/11/2022 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 7479134 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 02/22/2022 | summary letter for construction observations on file / pending other final inspections. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), FIRE ALARM: ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 7278675 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | R | 02/17/2022 | still need all paper work to complete foundation - insulation - sfrm - structural steel welding and bolting / still need to complete re-inspection for penetrations in fire rated assemblies - see bsp inspection dated 1/27 / need to complete other final inspections. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), FIRE ALARM: ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | R | 7274652 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/27/2022 | GYP PENETRATIONS / ABOVE GRID - GARDEN LVL / multiple gyp penetrations at conduit locations - need re-inspection / observed other above grid penetrations at garden lvl / pending other rough inspections / discussed outstanding engineering paper work needed for permit with site superintendent | BRIANB | BRIANB | | BSP | P | 7252294 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/21/2022 | Framing at 2nd floor and 2 layers of drywall at exiting side of wall OK / horizontal assembly framing OK | JEREMYA | JEREMYA | | BFR | P | 7246167 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/18/2022 | 1ST FLOOR -- Light gauge wall frame at Tele. 1119 OK pending other roughs
2ND FLOOR -- 2nd and 3rd layer of gypsum at opposite side of Mech. 2401 OK | DAKOTAB | DAKOTAB | | BFR | P | 7241567 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/14/2022 | 1ST FLOOR -- Light guage frame above lid at Tele. 1119 OK pending other roughs
2ND FLOOR -- 1st layer of gypsum on opposite side of Mech. 2401 OK | DAKOTAB | DAKOTAB | | BFR | P | 7240397 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/11/2022 | 2nd layer of gypsum at exit ramp on garden level OK -- 3rd layer of gypsum at 2hr fire barrier on 1st floor at existing building OK -- 1st layer of gypsum at smoke barrier at 2nd floor mech. room OK | DAKOTAB | DAKOTAB | | BSP | P | 7235892 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/10/2022 | Gypsum attachment at exit ramp on garden level OK -- 2 layers of gypsum attachment at 1st floor fire barrier at existing building OK | DAKOTAB | DAKOTAB | | BSP | P | 7234290 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/06/2022 | GYP INSPECTION / 2HR HORIZONTAL ASSEMBLY & 2HR FIRE BARRIER AT EXISTING BLDING - GARDEN LVL / I502 & V455 / observed 2nd layer American gyp at 2hr horizontal - 2hr fire barrier at areas noted / pending other rough inspections | BRIANB | BRIANB | | BSP | P | 7230720 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/05/2022 | GYP INSPECTION / 2HR HORIZONTAL ASSEMBLY & 2HR FIRE BARRIER AT EXISTING BLDING - GARDEN LVL / I502 & V455 / observed base layer American gyp at 2hr horizontal - 2hr fire barrier at areas noted / pending other rough inspections -----
GYP INSPECTION / 2HR FIRE BARRIER AT SHAFT- W415 / 1ST FLR MED CONF. 1119 & MISSION OUT 1113 / observed 5/8" base layer gyp at in fill wall framing at areas noted / discussed and reviewed details for fire rated assemblies with site reps / pending other rough inspections ------
GYP INSPECTION / STORAGE USE - EXIT SIDE / observed 5/8" gyp for 1hr fire barrier at exterior side of storage use room ------ | BRIANB | BRIANB | | BSP | P | 7229340 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/03/2022 | FRAME - 1" GYP INSPECTION / 2HR HORIZONTAL ASSEMBLY & 2HR FIRE BARRIER AT EXISTING BLDING - GARDEN LVL / I502 & V455 / observed mtl framing - mineral wool and 1" American gyp at 2hr horizontal - 2hr fire barrier at areas noted / pending other rough inspections --
GYP INSPECTION / GARDEN LVL RAMP - EXIT / 2HR FIREBARIER / observed base layer gyp at areas noted --
GYP INSPECTION / SHAFT AT EXISTING BLDING - 2nd FLR / observed 2nd layer 5/8" gyp for shaft at 2nd floor mech room area / reviewed details for fire rated assemblies and applied to onsite conditions with site reps / discussed needing observation letters for sfrm - structural steel
| BRIANB | BRIANB | | BFR | P | 7226711 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/29/2021 | GYP INSPECTION / 2HR Fire barrier - V455 (see approved splice) / GARDEN LVL RAMP / observed base layer 5/8" gyp panels at 2hr fire barrier / reviewed details for fire rated assemblies and applied to onsite conditions with superintendent | BRIANB | BRIANB | | BSP | P | 7224137 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 12/29/2021 | partial / south elevation | BRIANB | BRIANB | | BLA | P | 7223974 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/28/2021 | GYP INSPECTION / 2HR FIRE BARRIER / V455 - 2HR FIRE BARRIER - SHAFT AT 1ST - 2ND FLR @ EXISTING BLDING / observed base layer gyp for shaft at 2nd floor and 2nd layer gyp at 1st floor at existing building / reviewed details in approved design for 2hr fire barrier at shaft and applied to onsite conditions with site reps | BRIANB | BRIANB | | BFR | P | 7221995 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/22/2021 | 2nd layer of 5/8" gypsum at 2HR fire barrier at existing building OK 1st and 2nd per V455 | DAKOTAB | DAKOTAB | | BSP | P | 7219111 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/21/2021 | GYP INSPECTION - BASE LAYER / 2HR FIRE BARRIER / V455 - 2HR FIRE BARRIER - SHAFT AT 1ST FLR @ EXISTING BLDING / observed 5/8" American gyp for shaft 1st floor at existing building / reviewed details in approved design for 2hr fire barrier at shaft and applied to onsite conditions with site reps | BRIANB | BRIANB | | BSP | P | 7217473 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/20/2021 | Face layer of 5/8" gypsum at 2nd floor Mech. 2401 OK | DAKOTAB | DAKOTAB | | BFR | P | 7215468 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/17/2021 | courtesy visit - discussed inspection processes and procedures for final inspection with site superintendent | BRIANB | BRIANB | | BSP | P | 7213265 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/16/2021 | 1" GYP - MTL FRAME / V455 / 2HR FIRE SMOKE @ EXISTING BLD IN EXIT PASS -GARDEN LVL / observe mtl framing and 1" American gyp panels / also observed non-rated furr out wall framing in exit passage garden lvl / pending other rough inspections /
1" GYP - MTL FRAME / 2HR FIRE BARRIER / V455 - 2HR FIRE BARRIER - SHAFT AT 1ST - 2ND FLR @ EXISTING BLDING / observed mtl framing and 1" American gyp panels for shaft 1st and 2nd floor at existing building / reviewed details in approved design for 2hr fire barrier at shaft and applied to onsite conditions with site reps /
IN-FILL WALL FRAME / 2HR FIRE BARRIER AT SHAFT- W415 / 1ST FLR MED CONF. 1119 & MISSION OUT 1113 / observed in fill wall framing at areas noted / discussed and reviewed details for fire rated assemblies with site reps / pending other rough inspections
WALL FRAME / 2ND FLR MECH 2401 / 1HR FIRE BARRIER / observed remainder of wall framing at mech 2401 / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7211306 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 12/16/2021 | PARTIAL / WEST ELEVATION | BRIANB | BRIANB | | BLA | P | 7211257 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/07/2021 | GYP INSPECTION / GARDEN LVL - STORAGE USE G127 - G123 / 1HR FIRE BARRIERS / observed gyp and gyp fastening at areas noted / reviewed approved design and fire rated assemblies with site reps | BRIANB | BRIANB | | BSP | P | 7200574 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 12/07/2021 | PARTIAL / north elevation only | BRIANB | BRIANB | | BLA | P | 7200554 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/02/2021 | GYP INSPECTION / 2HR FIRE BARRIER - V489 & U419 / MED GAS STORAGE G124 / observed face layer American 5/8" gyp with fastening at 8" and 12" o.c at interior side of med gas storage (pending splice for proposed design changes from U419 to V455) /
WALL FRAME / CLEAN SUPPLY - COLUMNS / observed light gauge wall framing around columns in clean supply G123 / pending other rough inspections /
WALL FRAME / RAMP / MID-RAMP DOOR / V489 - 2hr Fire barrier / observed wall framing at area noted / pending other rough inspections /
1" GYP & MTL FRAME / 2HR Fire barrier - U415 / GARDEN LVL RAMP / observed mtl framing and 1" American M - Glass gyp panels per the UL V455 per system b assembly onsite at ramp - receiving dock 2hr fire barrier - proposed changes to fire rated assemblies need to be spliced into the permitted design - reviewed with site superintendent /
WALL FRAME / MECH 2401 / 1HR FIRE BARRER - V496 / observed wall framing at area noted / pending other rough inspections /
GYP INSPECTION / 1st - 2nd floor SHAFT - U - W415 / Proposed V455 listing onsite for inspection / observed 2nd layer American 5/8" gyp with fastening at 8" and 12" o.c at shaft where the approved UL assembly requires USG gyp (U415 - W415) / also need details on how the continuity for the fire barrier will be maintained to the deck above / | BRIANB | BRIANB | | BFR | P | 7195715 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | R | 11/29/2021 | GYP INSPECTION / MED GAS STORAGE G124 / FIRE BARRIER - V489 - Proposed V455 listing onsite for inspection / observed American 5/8" gyp with fastening at 8" and 12" o.c at the interior side of med gas storage where the approved UL assembly requires USG gyp (U415 - W415)
GYP INSPECTION / 1st - 2nd floor SHAFT - U - W415 / Proposed V455 listing onsite for inspection / observed 1st layer American 5/8" gyp with fastening at 8" and 12" o.c at shaft where the approved UL assembly requires USG gyp (U415 - W415) / also need details on how the continuity for the fire barrier will be maintained to the deck above /
FRAME - WALLS / STORAGE USE G127 - 123 - 125 GARDEN LVL AREA / observed wall framing at areas noted - pending other rough inspections / Note - still need to inspect fire barrier wall framing at ramp area / reviewed details for fire rated assemblies and continuity requirements with site superintendents | BRIANB | BRIANB | | BFR | R | 7190326 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 11/22/2021 | BATT INSULATION / MED GAS STORAGE G124 / observed batt insulation at south and west walls / pending other rough inspections / reviewed approved plan splices and details for fire rated assemblies with site superintendent | BRIANB | BRIANB | | BIN | P | 7185053 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/16/2021 | GYP INSPECTION / BASE LAYER / SHAFT T2035 - 2ND FLR / observed base layer 5/8" American gyp at shaft t2035 inside 2nd floor mech 2401 - still need to revise design to reflect as built condition - to reflect modifications to fire rated assemblies / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7178851 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/15/2021 | 3RD FLOOR -- 1st layer of 5/8" gypsum at smoke barrier on 3rd floor OK pending splice of updated listing -- Steel stud frame and gypsum panel at north side of mechanical shaft on 3rd floor OK -- 1ST FLOOR -- Steel stud frame, gypsum panel, and exterior gypsum at exterior walls of med-gas room OK | DAKOTAB | DAKOTAB | | BFR | P | 7177608 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/10/2021 | GYP INSPECTION - 1hr smoke barrier / INSIDE 2ND FLR MECH2401 / observed base layer 5/8" American M - bloc gyp (fastening at 8" o.c) per the UL V455 per system b assembly onsite inside 2nd floor mech 2401- the approved design reflects a 1hr smoke barrier barrier per U415 assembly with USG - proposed changes to fire rated assemblies need to be spliced into the permitted design - reviewed with site superintendent / UPDATED 22NOV21 - changed inspection from reject to partial - see approved plan splices for revised fire rated assemblies | BRIANB | BRIANB | | BFR | P | 7172348 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 11/08/2021 | FRAME / LID ABOVE EXIT #1 / observed framing for lid over exit #1 - pending other rough inspections /
GYP INSPECTION / 2HR FIRE BARRIER - U419 / MED GAS STORAGE G124 - SOUTH & WEST WALLS / observed American 5/8" M-Glass gyp with fastening at 8" and 12" o.c where the approved UL assembly requires USG gyp /
GYP INSPECTION / 1HR FIRE BARRIER - U493 / 2nd FLR MECH 2401 - exterior wall to shaft 2035 only / observed American 5/8" M-Bloc gyp with fastening at 8" and 12" oc. where the approved UL assembly requires USG gyp at the inside of Mech 2401 from exterior to shaft 2035 / also need details on how the continuity for the fire barrier will be maintained to the deck above /
1" GYP AND MTL FRAME - 1hr smoke barrier / INSIDE 2ND FLR MECH2401 / observed mtl framing and 1" American M - Glass gyp panels per the UL V455 per system b assembly onsite inside 2nd floor mech 2401- the approved design reflects a 1hr smoke barrier barrier per U415 assembly with USG - proposed changes to fire rated assemblies need to be spliced into the permitted design - reviewed with site superintendent / UPDATED 22NOV21 - changed inspection from reject to partial - see approved plan splices for revised fire rated assemblies | BRIANB | BRIANB | | BFR | P | 7169040 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/28/2021 | PARTIAL / CURTAIN WALL FRAMING - REMAINING SOUTH ELEVATION / observed mtl framing along south elevation curtain wall /
TOP OF WALL FRAME / GARDEN LVL / VENDOR G127 (1hr fire barrier) SUPPLY G123 - EXIT 01 - MED GAS G124 (2hr fire barrier) / observed top of wall framing at areas noted / reviewed permitted design - details for fire rated assemblies including fire barrier continuity requirements and applied to onsite conditions - fire barrier wall framing does not extend to deck above at rear of vendor G127 at expansion joint - need clarification on how fire barrier continuity will be achieved / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7158872 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/20/2021 | PARTIAL / PARAPET WALL FRAME / EAST - WEST - NORTH / observed parapet wall framing at areas noted / discussed fire rated assemblies with site rep - note - inspection added onsite per site rep / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7148958 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/18/2021 | PARTIAL / CURTAIN WALL FRAMING - REMAINING NORTH & WEST ELEVATION / observed mtl framing at remaining north and west elevation curtain wall only / observation letter for all structural steel - foundation components to follow | BRIANB | BRIANB | | BFR | P | 7145483 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 10/06/2021 | PARTIAL / CURTAIN WALL FRAMING - NORTH WEST / observed mtl framing at north west corner curtain wall only / observation letter for all structural steel - foundation components to follow | BRIANB | BRIANB | | BFR | P | 7132280 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 10/06/2021 | Qualified third party energy inspection documentation must be presented at time of final building (B=) inspection | BRIANB | BRIANB | | BIN | P | 7131559 |
ENCORE ELECTRIC, INC. | E= | C | 08/11/2022 | | AARONR | AARONR | | E= | C | 7479140 |
ENCORE ELECTRIC, INC. | E= | C | 08/11/2022 | FIRE ALARM INSPECTION: | AARONR | AARONR | | E= | C | 7479133 |
ENCORE ELECTRIC, INC. | E= | C | 06/28/2022 | | AARONR | AARONR | | E= | C | 7428756 |
ENCORE ELECTRIC, INC. | E= | P | 02/28/2022 | See prints for areas inspected. | AARONR | AARONR | | E= | P | 7284938 |
ENCORE ELECTRIC, INC. | ER | P | 02/23/2022 | FIRE ALARM INSPECTION: See prints for areas inspected. | AARONR | AARONR | | ER | P | 7280800 |
ENCORE ELECTRIC, INC. | ER | P | 02/23/2022 | See prints for areas inspected. | AARONR | AARONR | | ER | P | 7280795 |
ENCORE ELECTRIC, INC. | E= | P | 02/17/2022 | Need labeling on panels. | AARONR | AARONR | | E= | P | 7275065 |
ENCORE ELECTRIC, INC. | E= | R | 02/16/2022 | FIRE ALARM INSPECTION: Med gas are needs clearance in front of panel --- Need disconnects on garage motors. --- GFCI protection can't be above 6'-7" in loading dock............Hall ways OK. | AARONR | AARONR | | E= | R | 7273457 |
ENCORE ELECTRIC, INC. | ER | P | 02/16/2022 | See prints for areas inspected. | AARONR | AARONR | | ER | P | 7273454 |
ENCORE ELECTRIC, INC. | E= | P | 02/16/2022 | FIRE ALARM INSPECTION: Fire alarm OK in loading dock. | AARONR | AARONR | | E= | P | 7273443 |
ENCORE ELECTRIC, INC. | ER | P | 02/16/2022 | Rough OK in the Med gas area. | AARONR | AARONR | | ER | P | 7273435 |
ENCORE ELECTRIC, INC. | E= | R | 02/14/2022 | Garden level OK. | AARONR | AARONR | | E= | R | 7270256 |
ENCORE ELECTRIC, INC. | ER | P | 02/14/2022 | Garden level. | AARONR | AARONR | | ER | P | 7270249 |
ENCORE ELECTRIC, INC. | EP | P | 02/08/2022 | See prints for areas inspected. | AARONR | AARONR | | EP | P | 7263781 |
ENCORE ELECTRIC, INC. | ER | P | 02/08/2022 | See prints for areas inspected. | AARONR | AARONR | | ER | P | 7263768 |
ENCORE ELECTRIC, INC. | ER | P | 02/03/2022 | FIRE ALARM INSPECTION: Ceiling rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7259541 |
ENCORE ELECTRIC, INC. | ER | P | 02/03/2022 | Ceiling rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7259464 |
ENCORE ELECTRIC, INC. | ER | P | 01/27/2022 | FIRE ALARM INSPECTION: See prints for areas inspected. | AARONR | AARONR | | ER | P | 7253177 |
ENCORE ELECTRIC, INC. | ER | P | 01/27/2022 | See prints for areas inspected. | AARONR | AARONR | | ER | P | 7253091 |
ENCORE ELECTRIC, INC. | ER | P | 01/18/2022 | FIRE ALARM INSPECTION: See prints for areas roughed. | AARONR | AARONR | | ER | P | 7242831 |
ENCORE ELECTRIC, INC. | ER | P | 01/18/2022 | See prints for areas roughed. | AARONR | AARONR | | ER | P | 7242610 |
ENCORE ELECTRIC, INC. | ER | P | 12/20/2021 | Wall rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7215802 |
ENCORE ELECTRIC, INC. | ER | P | 12/20/2021 | FIRE ALARM INSPECTION: Wall rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7215696 |
ENCORE ELECTRIC, INC. | ER | P | 11/17/2021 | | AARONR | AARONR | | ER | P | 7181112 |
ENCORE ELECTRIC, INC. | ER | P | 11/11/2021 | FIRE ALARM INSPECTION: Wall rough OK. See prints for areas inspected. | AARONR | AARONR | | ER | P | 7174736 |
ENCORE ELECTRIC, INC. | ER | P | 11/11/2021 | Wall rough OK. See prints for areas inspected. | AARONR | AARONR | | ER | P | 7174564 |
ENCORE ELECTRIC, INC. | ESL | P | 08/26/2021 | stub ups at loading dock | RANDY | RANDY | | ESL | P | 7086731 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 04/25/2022 | CORE AND SHELL COMPLETE / | LIDO | LIDO | | H= | C | 7351376 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | C | 03/01/2022 | TEST AND BALANCE REPORT RE RECEIVED. SEE IMAGES. | LIDO | LIDO | | H= | C | 7285443 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 02/28/2022 | A PARTIAL TEST AND BALANCE REPORT WAS SUBMITTED. THE ENTIRE TEST AND BALANCE REPORT WILL NEED TO BE SUBMITTED FOR REVIEW. | LIDO | LIDO | | H= | P | 7283919 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 02/17/2022 | DUCT SMOKE DETECTORS ARE MONITORED BY BAS ALARM SYSTEM ( 24/7) / GARDEN LEVEL PLAN PAGE MH 101 (BDA 80) : MED GAS ROOM # G-124 - EF-2 AND MOTORIZED DAMPER FOR LOUVER LV-2 INTERLOCK OK / EMERGENCY VENTILATION OFF (EVO) SWITCH. PER KEY NOTE #3 INSTALLED / 2ND FLOOR PLAN PAGE MH 120 (BDA 82) FINAL PENDING : AHU-17 OVER FLOW MONITORING DEVISE INSTALLED / FINAL PENDING : NEED TEST AND BALANCE REPORT /
| LIDO | LIDO | | H= | P | 7274827 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 02/15/2022 | ROOF PLANS PAGE MH 130 (BDA 83) FINAL OK : PERMANENT ACCESS LADDER CORRECTIONS MADE / GARDEN LEVEL PLAN PAGE MH 101 (BDA 80) FINAL PENDING : MED GAS ROOM # G-124 - NEED EF-2 AND MOTORIZED DAMPER FOR LOUVER LV-2 INTERLOCK VERIFIED / MISSING EMERGENCY VENTILATION OFF (EVO) SWITCH. SEE KEY NOTE #3. CONTRACTOR IS WANTING TO ELIMINATE THE CODE REQUIRED EMERGENCY VENTILATION OFF (EVO) SWITCH (see 2015 IMC code section 502.8.1.1.) PER CONSULT WITH SENIOR INSPECTOR, CONTRACTOR WILL NEED TO CONSULT WITH FIRE INSPECTOR AND ENGINEER TO ADDRESS / 1ST FLOOR PLAN PAGE MH 110 (BDA 81) FINAL OK ( remodel area supply, return flex duct, grills and registers ok / installed per splice dated 11/18/21)/ 2ND FLOOR PLAN PAGE MH 120 (BDA 82) FINAL PENDING : AHU-17 - MISSING OVER FLOW MONITORING DEVISE / NEED TEST AND BALANCE REPORT /
| LIDO | LIDO | | H= | P | 7271299 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 02/14/2022 | HVAC CONTRACTOR HEAT FINAL/ GARDEN LEVEL PLAN PAGE MH 101 (BDA 80) FINAL PENDING : MED GAS ROOM # G-124 - NEED EF-2 AND MOTORIZED DAMPER FOR LOUVER LV-2 INTERLOCK VERIFIED / NEED TEST AND BALANCE REPORT / MISSING EMERGENCY VENTILATION OFF (EVO) SWITCH. SEE KEY NOTE #3. CONTRACTOR IS WANTING TO ELIMINATE THE CODE REQUIRED EMERGENCY VENTILATION OFF (EVO) SWITCH (see 2015 IMC code section 502.8.1.1.) PER CONSULT WITH SENIOR INSPECTOR, CONTRACTOR WILL NEED TO CONSULT WITH FIRE INSPECTOR AND ENGINEER TO ADDRESS / 1ST FLOOR PLAN PAGE MH 110 (BDA 81) FINAL OK / 2ND FLOOR PLAN PAGE MH 120 (BDA 82) FINAL PENDING : AHU-17 - MISSING OVER FLOW MONITORING DEVISE / ROOF PLANS PAGE MH 130 (BDA 83) FINAL PENDING : PERMANENT ACCESS LADDER IS LACKING THE MINIMUM 6" TOE SPACING AT THE ROOF AND ROOF HATCH ( see 2015 imc code section 306.5 (3) / fyi see (7) when correcting the toe spacing)/
| LIDO | LIDO | | H= | P | 7270313 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 02/14/2022 | GARDEN LEVEL PLAN PAGE MP 101 : HWS / HWR TO BARE FINN HEATING ELEMENT PER NOT 4 UNDER OPERATING PRESSURE. NO VISIBLE LEAKS. INSTALLED PER SPLICE DATED 2/8/22. BARE FINN HEATING ELEMENT INSTALL OK / GARDEN LEVEL FINAL OK / 1ST FLOOR PLAN PAGE MP110 FINAL OK/ 2ND FLOOR PLAN PAGE MP120 FINAL PENDING : MISSING AHU -17 OVERFLOW MONITORING DEVISE / | LIDO | LIDO | | H= | P | 7270301 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 02/11/2022 | GARDEN LEVEL PLAN PAGE MH 101 MED GAS ROOM #G124 : CONTRACTOR IS WANTING TO ELIMINATE THE CODE REQUIRED EMERGENCY VENTILATION OFF (EVO) SWITCH, KEY NOTE #3 (see 2015 IMC code section 502.8.1.1.)PER CONSULT WITH SENIOR INSPECTOR, CONTRACTOR WILL NEED TO CONSULT WITH FIRE INSPECTOR AND ENGINEER TO ADDRESS / | LIDO | LIDO | | H= | P | 7267194 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 02/09/2022 | GARDEN LEVEL PLAN PAGE MP 101 : NEED TO REVIEW WITH SENIOR THE EMERGENCY VENTILATION OFF (EVO) SWITCH, KEY NOTE #3 / NEED TO INSTALL HWS / HWR BARE FINN HEATING ELEMENT PER NOT 4 FROM SPLICE DATED 2/8/22 / G-1,2 AND 3 INSTALL OK / LABEL ALL EQUIPMENT / 1ST FLOOR PLAN PAGE MP110 FINAL PENDING : HEAT WATER AND CHILLED WATER PIPES ARE IN PROCESS OF BEING INSULATED AND LABELED / 2ND FLOOR PLAN PAGE MP120 : DISCUSSED OVER FLOOR MONITORING DEVISE FOR AHU-17 / HEAT WATER AND CHILLED WATER PIPES ARE IN PROCESS OF BEING INSULATED AND LABELED / | LIDO | LIDO | | H= | P | 7265125 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 02/09/2022 | HVAC CONTRACTOR HEAT FINAL/ GARDEN LEVEL PLAN PAGE MH 101 (BDA 80) FINAL PENDING : MED GAS ROOM # G-124 - NEED EF-2 AND MOTORIZED DAMPER FOR LOUVER LV-2 INTERLOCK VERIFIED / NEED TEST AND BALANCE REPORT / MISSING EMERGENCY VENTILATION OFF (EVO) SWITCH. SEE KEY NOTE #3 / 1ST FLOOR PLAN PAGE MH 110 (BDA 81) FINAL OK / 2ND FLOOR PLAN PAGE MH 120 (BDA 82) FINAL PENDING : AHU-17 - MISSING OVER FLOW MONITORING DEVISE / ROOF PLANS PAGE MH 130 (BDA 83) FINAL PENDING : PERMANENT ACCESS LADDER IS LACKING THE MINIMUM 6" TOE SPACING AT THE ROOF AND ROOF HATCH ( see 2015 imc code section 306.5 (3) / fyi see (7) when correcting the toe spacing) / ROOM # G126 - AC-1,2 AND 3 THERMOSTATS CONTROLS OK. SEE IMAGES / | LIDO | LIDO | | H= | P | 7264177 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 02/03/2022 | GARDEN LEVEL PLAN PAGE MP 101 FINAL PENDING : NEED INSTALL INSTRUCTIONS FOR UNIT HEATERS G-1,2 AND 3 / LABEL ALL EQUIPMENT /FINAL CONNECTION TO EQUIPMENT UNDER OPERATING PRESSURE. NO VISIBLE LEAKS / ALL HEAT WATER AND CHILLED WATER PIPES ARE INSULATED / 1ST FLOOR PLAN PAGE MP110 FINAL PENDING : LABEL ALL EQUIPMENT / NEED TO INSULATE AND LABEL HEAT WATER AND CHILLED WATER PIPES / FINAL CONNECTION TO EQUIPMENT UNDER OPERATING PRESSURE. NO VISIBLE LEAKS / 2ND FLOOR PLAN PAGE MP120 FINAL PENDING : 1ST FLOOR PLAN PAGE MP110 FINAL PENDING : LABEL ALL EQUIPMENT / NEED TO INSULATE AND LABEL HEAT WATER AND CHILLED WATER PIPES / FINAL CONNECTION TO EQUIPMENT UNDER OPERATING PRESSURE. NO VISIBLE LEAKS / | LIDO | LIDO | | H= | P | 7259223 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 02/03/2022 | HVAC CONTRACTOR HEAT FINAL/ GARDEN LEVEL PLAN PAGE MH 101 (BDA 80) FINAL PENDING : MED GAS ROOM # G-124 - NEED EF-2 AND MOTORIZED DAMPER FOR LOUVER LV-2 INTERLOCK VERIFIED / NEED TEST AND BALANCE REPORT / MISSING EMERGENCY VENTILATION OFF (EVO) SWITCH. SEE KEY NOTE #3 / ROOM # G126 - AC-1,2 AND 3 THERMOSTATS CONTROLS ARE OVER 48" ABOVE THE FLOOR. LOWER THERMOSTAT OR OK TO INSTALL A LOCK BOX / 1ST FLOOR PLAN PAGE MH 110 (BDA 81) FINAL OK / 2ND FLOOR PLAN PAGE MH 120 (BDA 82) FINAL PENDING : AHU-17 - MISSING OVER FLOW MONITORING DEVISE / ROOF PLANS PAGE MH 130 (BDA 83) FINAL PENDING : PERMANENT ACCESS LADDER IS LACKING THE MINIMUM 6" TOE SPACING AT THE ROOF AND ROOF HATCH ( see 2015 imc code section 306.5 (3) / fyi see (7) when correcting the toe spacing) /
| LIDO | LIDO | | H= | P | 7259203 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | C | 01/26/2022 | GARDEN LEVEL PLAN PAGE MH101 (BDA 80) : SUPPLY GRILL ROOM # G-126 OK / AC 1,2 AND 3 OK / 2ND FLOOR PLAN PAGE MH 120 (BDA 82) : EF-1 EXHAUST DUCT ROUGH OK / MECHANICAL ROOM - 1 DAMPER COMPLETE / AHU-17 SUPPLY DUCT ROUGH OK / ROOF PLAN PAGE MH 130 : PERMANENT ACCESS LADDER IS LACKING THE MINIMUM 6" TOE SPACING AT THE ROOF AND ROOF HATCH ( see 2015 imc code section 306.5 (3) / fyi see (7) when correcting the toe kick) EF-1 AND RIH-1 OK / | LIDO | LIDO | | HD | C | 7251569 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 01/20/2022 | 1ST FLOOR MP -110 (BDA85) : 150LB TEST FOR HEAT WATER SUPPLY / RETURN PIPING OK. INSTALLED PER PLAN. NEED FINAL CONNECTIONS TO EQUIPMENT./ 2ND FLOOR PLAN PAGE MP-120 (BDA 86) : 150LB TEST FOR CHILLED WATER SUPPLY / RETURN PIPING OK. INSTALLED PER PLAN. NEED FINAL CONNECTIONS TO EQUIPMENT./ 150LB TEST FOR HEAT WATER SUPPLY / RETURN PIPING OK. INSTALLED PER PLAN. NEED FINAL CONNECTIONS TO EQUIPMENT./
| LIDO | LIDO | | HWP | P | 7245217 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/19/2022 | 2ND FLOOR PLAN PAGE MH 120 (BDA 82) MECHANICAL ROOM - RAF-1 MANUFACTURER COOK INSTALLED. EQUIPMENT SCHEDULE SHOWS GEENHECK. NEED REVISED AND APPROVED EQUIPMENT SCHEDULE OR ENGINEER APPROVED SUBMITTAL. FAN, FRESH AIR DUCT ROUGH AND DUCT TIE INS EQUIPMENT OK / FRESH AIR PLENUM AND LOUVER OK / 1ST FLOOR PLAN PAGE MH 110 ( BDA 81) : 3 SHAFT DAMPER COMPLETE / GARDEN LEVEL PLAN PAGE MH101 (BDA 80 ) : SUPPLY, RETURN GRILLS AND REGISTERS OK / MED GAS ROOM - HIGH LOW EXHAUST INTAKE INSTALL HEIGHTS AND GRILLS OK / | LIDO | LIDO | | HD | P | 7244008 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/18/2022 | GARDEN LEVEL PLAN PAGE MH-101 (BDA 80) : MED GAS ROOM # G-124 - EF-2 - MANUFACTURER COOK INSTALLED. EQUIPMENT SCHEDULE SHOWS GEENHECK. NEED REVISED AND APPROVED EQUIPMENT SCHEDULE OR ENGINEER APPROVED SUBMITTAL./ 1 DAMPER COMPLETE / 2ND FLOOR PLAN PAGE MH-120 ( BDA 82) : 5 -DAMPERS COMPLETE / PARTIAL SUPPLY, RETURN AND RELIEF DUCT ROUGH OK. OK TO INSULATE./ | LIDO | LIDO | | HD | P | 7242131 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/05/2022 | 1ST FLOOR PLAN PAGE MH110 : 1 SHAFT DAMPER FRAME OK / (E) TB-1-40 / (E) TB-1-83 - SUPPLY DUCT ROUGH OK. OK TO INSULATE. RETURN AIR DUCT ROUGH IN THE SAME AREA OK. OK TO INSULATE / | LIDO | LIDO | | HD | P | 7229170 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 01/03/2022 | 2ND FLOOR PLAN PAGE MH-120 (BDA82) : 1 DAMPER FRAME OK / | LIDO | LIDO | | HD | P | 7227003 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 12/14/2021 | GARDEN LEVEL PLAN PAGE MH101 ( BDA 80) : MED GAS ROOM - NEED TO REVIEW KEY NOTE 2 AND CODE REQUIREMENTS FOR LOW EXHAUST INLET HEIGHT OFF FLOOR. REST OF EXHAUST DUCT, DROP AND HIGH EXHAUST INLET OK / 4 DAMPERS COMPLETE / EXPOSED SUPPLY DUCT AND TAPS OK / | LIDO | LIDO | | HD | P | 7208834 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 12/07/2021 | GARDEN LEVEL PLAN PAGE MP 101 : NEED REVISED PLANS FOR ALTERNATE HEAT WATER / CHILLED WATER PIPE ROUTING ON GARDEN LEVEL / HEAT WATER / CHILLED WATER RISER DRAINS ON GARDEN LEVEL INSTALLED / 150 LB TESTS FOR HWS / HWR OK . HEAT WATER SUPPLY AND RETURN PIPING TO ALL GARDEN LEVEL EQUIPMENT INSTALLED PER PLAN . OK TO INSULATE /
| LIDO | LIDO | | HWP | P | 7200550 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/23/2021 | 1ST FLOOR PLAN PAGE MH 110 ( BDA 81) : 1 - SHAFT DAMPER FRAME OK. SEE IMAGES / | LIDO | LIDO | | HD | P | 7187680 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/22/2021 | GARDEN LEVEL PLAN PAGE MH101 ( BDA 80) : 3 - VAV'S OK / PARTIAL SUPPLY, RETURN DUCT ROUGH OK. OK TO INSULATE / 1ST FLOOR PLAN PAGE MH 110 ( BDA 81) : 1 - SHAFT DAMPER FRAME OK / | LIDO | LIDO | | HD | P | 7186068 |
U.S. ENGINEERING CONSTRUCTION, LLC | HSP | P | 11/19/2021 | Garden level plan page MH101 ( BDA 80) . Stamped engineer letter showing fire damper framing above a double door meets the intent for supportive construction received. See images. | LIDO | LIDO | | HSP | P | 7183184 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/18/2021 | GARDEN LEVEL PLAN PAGE MH-101 ( BDA 80) - 1 DAMPER FRAME ABOVE DOUBLE DOOR OK ( see stamped engineer letter, in images showing damper frame above double door meets the manufacturer intent for supportive construction) / 1ST FLOOR PLAN PAGE MH-110 ( BDA 81) - 1 SHAFT DAMPER FRAME OK / 2ND FLOOR PLAN PAGE MH120 ( BDA 82) - 2 SHAFT DAMPER FRAMES OK / | LIDO | LIDO | | HD | P | 7182700 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/15/2021 | 2ND FLOOR PLAN PAGE MH120 ( BDA 82) : 1 - SHAFT DAMPER FRAME OK / | LIDO | LIDO | | HD | P | 7177311 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 11/10/2021 | 3" HEAT WATER SUPPLY AND RETURN / 3" CHILLED WATER SUPPLY AND RETURN INSTALLED IN SHAFT : NEED REVISED PLANS FOR ALTERNATE PIPE ROUTING ON GARDEN LEVEL / MISSING RISER DRAINS ON GARDEN LEVEL. SEE NOTE 3 / INSTALL FROM GARDEN LEVEL UP TO 2ND FLOOR OK / 4 - 150 LB TESTS OK ( TEST VIEWED ON 2ND FLOOR) / HWS / HWR / CHWS/ CHWR PIPING TIED INTO EXISTING PIPE OK .
| LIDO | LIDO | | HWP | P | 7172783 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/02/2021 | ON SITE MEETING WITH MECHANICAL CONTRACTOR (Jeremy H)TO DISCUSS MED GAS ROOM : EXHAUST TERMINATION TO COMPLY WITH 2015 IMC CODE SECTION 501.3.1 (2). ALSO SEE CODE SECTION 502.8.1.1 / NO SEQUENCE OF OPERATION SHOWN ON THE APPROVED MECHANICAL PLANS FOR THE MED GAS EXHAUST FAN (EF-2), ENGINEER TO ADDRESS CODE SECTION 502.8.1.1 (3).
| LIDO | LIDO | | HD | P | 7163343 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 11/02/2021 | GARDEN LEVEL PLAN PAGE MH 101 ( BDA 80) : MED GAS ROOM - 1 - INTAKE AIR FIRE / SMOKE DAMPER FRAME OK | LIDO | LIDO | | HD | P | 7163070 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 10/27/2021 | GARDEN LEVEL PLAN PAGE MH101 (BDA 80) : 3 DAMPER FRAMES OK/ SHAFT SUPPLY AND RETURN DAMPER FLOOR BETWEEN GARDEN LEVEL AND 1ST FLOOR - ANGLES AND BREAKAWAY CONNECTIONS ON 1ST FLOOR OK/ 1ST FLOOR MH110 (BDA 81) : 3 SHAFT DAMPER BREAK AWAY CONNECTIONS IN SHAFT ONLY OK. / SUPPLY, RETURN AND EXHAUST SHAFT DUCT ROUGH OK. OK TO INSULATE / 2ND FLOOR PLAN PAGE MH120 ( BDA 82) : 3 SHAFT DAMPER BREAK AWAY CONNECTIONS IN SHAFT ONLY OK. / SUPPLY, RETURN AND EXHAUST SHAFT DUCT ROUGH OK. OK TO INSULATE / 2 DAMPER FRAMES OK / | LIDO | LIDO | | HD | P | 7156929 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 03/25/2022 | | LEE | LEE | | P= | C | 7314361 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 02/10/2022 | P= ENTRY TO UPLOAD SEISMIC BRACING REQUIREMENTS FROM JOB SUBMITTAL | LEE | LEE | | P= | P | 7265697 |
OLSON PLUMBING & HEATING COMPANY | PRD | C | 02/09/2022 | | LEE | LEE | | PRD | C | 7264629 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 02/09/2022 | RESEARCHING ASI'S FOR RESTROOMS DELETED FROM THIS PERMIT -- REST OK | LEE | LEE | | P= | P | 7264624 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 02/03/2022 | FOR HOT & COLD HOSE BIBB GARDEN LEVEL | LEE | LEE | | P= | P | 7258835 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 01/12/2022 | FOR TENANT FINISH HOSE BIBB 2ND FLOOR MECH ROOM OK IN WALL ONLY ( NO T.I. PLANS YET ) | LEE | LEE | | PTO | P | 7236696 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 12/07/2021 | GARDEN LEVEL H20 OVERHEAD ONLY TO HOSE STATION OK -- ((( NEED PLANS REVISED TO SHOW WH-1 DELETED AT MED GAS AREA ))) | LEE | LEE | | PTO | P | 7199912 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 12/02/2021 | STILL NEED RESTRAINTS AND HANGERS COMPLETED -- REST OK | LEE | LEE | | PRD | P | 7195430 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/15/2021 | PHASE ONE SECONDARY DRAINS LEAKING AT 6" 90 GROUND FLOOR AND DRAIN ASSEMBLY 3RD FLOOR -- ALSO MED GAS ROOF PRIMARY DRAIN LEAKING | LEE | LEE | | PRD | P | 7176777 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 11/12/2021 | PHASE 1 GARDEN LEVEL DWV UP TO FIRST FLOOR OK | LEE | LEE | | PTO | P | 7175718 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 11/12/2021 | PRIMARY DRAINS PHASE 1 TESTS COMPLETE MINUS MED GAS ROOM -- NEED ALL OVERFLOW TESTS -- NEED RESTRAINTS AND UNDER-DECK CLAMPS ON ALL | LEE | LEE | | PRD | P | 7175712 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 08/18/2021 | | LEE | LEE | | PB | C | 7076981 |
OLSON PLUMBING & HEATING COMPANY | PRD | P | 08/18/2021 | TWO 4" RISERS ON 6" UNDERGROUND MAIN OK | LEE | LEE | | PRD | P | 7076972 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/29/2021 | GREASE INTERCEPTOR TIE IN FROM EXISTING C/I TO NEW PVC IS COMPLETE | LEE | LEE | | PB | P | 7018852 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/24/2021 | GREASE WASTE FROM EDGE OF NEW FOUNDATION TO TIE IN OK | LEE | LEE | | PB | P | 7014576 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 02/08/2022 | PAID (REC#1842206): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Added finn tubes to piping plan | JUSTINC | JUSTINC | | XMS | T | 7262738 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 12/15/2021 | PAID (REC#1829939): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Hilti EJ - revised assemblies | MICHAELA | MICHAELA | | XBS | T | 7209196 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 11/19/2021 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: 2nd floor layout revisions | JUSTINC | JUSTINC | | XMS | P | 7184442 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 11/19/2021 | PAID (REC#1826634): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 71 revisions: Adjusted sheet P110. | SHANEN | SHANEN | | XPS | T | 7184115 |
ENCORE ELECTRIC, INC. | XES | T | 11/19/2021 | PAID (REC#1826311): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Telemetry room revision | SHELBY | SHELBY | | XES | T | 7183325 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 11/18/2021 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: 1st floor layout revisions | JUSTINC | JUSTINC | | XMS | P | 7181683 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 11/17/2021 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised garden level piping | JUSTINC | JUSTINC | | XMS | P | 7180021 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 11/16/2021 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 58 revisions: Adjusted sheet P111 and P121. | SHANEN | SHANEN | | XPS | P | 7178693 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 11/03/2021 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 45 revisions: adjusted sheet P111 and P121. | SHANEN | SHANEN | | XPS | P | 7163967 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 10/07/2021 | PAID (REC#1813268): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 45 revisions: adjusted sheet P111 and P121. | SHANEN | SHANEN | | XPS | T | 7133666 |