GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 07/06/2021 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 7024864 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/30/2021 | building final OK pending H=. Additional Inspections Required (computer generated): COLORADO MECHANICAL SYSTEMS Mechanical Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7021317 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/04/2021 | Interior light gauge frame at Xray OK pending other roughs -- Reviewed Accessible Elements | DAKOTAB | DAKOTAB | | BFR | P | 6991051 |
RIVIERA ELECTRIC, LLC | E= | C | 06/25/2021 | | RANDY | RANDY | | E= | C | 7015939 |
MERIDIAN FIRE AND SECURITY LLC | E= | C | 06/24/2021 | FIRE ALARM INSPECTION: Added 2 visual strobes in west X-Ray rooms / | ROB | ROB | | E= | C | 7018041 |
MERIDIAN FIRE AND SECURITY LLC | ER | C | 06/24/2021 | FIRE ALARM INSPECTION: Added 2 visual strobes in west X-Ray rooms / | ROB | ROB | | ER | C | 7018042 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 06/18/2021 | FIRE ALARM INSPECTION: walls ok | RANDY | RANDY | | ER | P | 7007287 |
RIVIERA ELECTRIC, LLC | ER | P | 06/07/2021 | Wall rough OK. | AARONR | AARONR | | ER | P | 6992874 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | C | 07/06/2021 | STAMPED RFI FROM ENGINEER REGARDING RELOCATED SUPPLY AIR TO CONTROL ROOM FROM XRAY ROOM RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 7024863 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 07/02/2021 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. RFI FROM ENGINEER REGARDING RELOCATED SUPPLY AIR TO CONTROL ROOM FROM XRAY ROOM ALSO RECEIVED, THIS RFI NEEDS TO BE STAMPED BY ENGINEER FOR APPROVAL. | DUSTINS | DUSTINS | | H= | P | 7023499 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | L | 06/29/2021 | CANCELLED AT CALL AHEAD BY OTIS WITH CMS. MECHANICAL FINAL IS PENDING: ENGINEER ADDRESSING NEW 12" SUPPLY FROM EXISTING VAV STILL INSTALLED IN CONTROL ROOM AND SHOULD BE INSTALLED IN XRAY ROOM PER PLAN OR INSTALL PER PLAN. PROVIDE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | L | 7019596 |
COLORADO MECHANICAL SYSTEMS, LLC | H= | P | 06/25/2021 | NEW 12" SUPPLY FROM EXISTING VAV IS STILL INSTALLED IN CONTROL ROOM AND SHOULD BE INSTALLED IN XRAY ROOM PER PLAN, ENGINEER TO ADDRESS. ALL FLEX AND DIFFUSERS INSTALLED. THERMOSTAT INSTALLED. PROVIDE TEST AND BALANCE REPORT FOR FINAL. | DUSTINS | DUSTINS | | H= | P | 7016564 |
COLORADO MECHANICAL SYSTEMS, LLC | HD | P | 06/16/2021 | NEW 12" SUPPLY FROM EXISTING VAV IS INSTALLED IN CONTROL ROOM AND SHOULD BE INSTALLED IN XRAY ROOM PER PLAN. SEAL MEDIUM PRESSURE SUPPLY AIR DUCT FOR VAV-3A, THE REST OF MEDIUM/LOW PRESSURE SUPPLY AIR MAIN TRUNKS AND LATERALS FOR VAV-3A OK, OK TO WRAP. FLEX INSTALLED, NO DIFFUSERS. | DUSTINS | DUSTINS | | HD | P | 7004637 |
COLORADO MECHANICAL SYSTEMS, LLC | P= | C | 06/17/2021 | | JOSEPHD | JOSEPHD | | P= | C | 7005710 |
COLORADO MECHANICAL SYSTEMS, LLC | PTO | C | 06/17/2021 | | JOSEPHD | JOSEPHD | | PTO | C | 7005708 |
COLORADO MECHANICAL SYSTEMS, LLC | PTO | P | 06/04/2021 | in wall ok, need to see over head completed, | JOSEPHD | JOSEPHD | | PTO | P | 6990896 |
COLORADO MECHANICAL SYSTEMS, LLC | PB | C | 05/28/2021 | | JOSEPHD | JOSEPHD | | PB | C | 6985020 |