SEPTON DEVELOPMENT GROUP, INC | B= | C | 11/03/2022 | Stamped engineer letter on file for structural steel | ADAML | ADAML | | B= | C | 7571110 |
SEPTON DEVELOPMENT GROUP, INC | B= | P | 11/02/2022 | Weld inspection report is missing a stamp -- Schedule a new Building Final when above items are complete. | ADAML | ADAML | | B= | P | 7569616 |
SEPTON DEVELOPMENT GROUP, INC | B= | P | 10/31/2022 | Provide 3rd party structural and weld letter. -- Schedule a new Building Final when above items are complete. | NATHAN | NATHAN | | B= | P | 7568236 |
SEPTON DEVELOPMENT GROUP, INC | BE | P | 09/15/2022 | | JACKIEP | JACKIEP | | BE | P | 7518645 |
SEPTON DEVELOPMENT GROUP, INC | BSP | P | 07/12/2021 | Discussed inspections needed, what special inspections are needed with observation letter to follow, | NATHAN | NATHAN | | BSP | P | 7032759 |
BIBLE ELECTRIC, INC. | E= | C | 10/13/2021 | 15A ice maker ok / 2 coolers outside deli walk-in cooler ok / | MIGUEL | MIGUEL | | E= | C | 7140214 |
BIBLE ELECTRIC, INC. | E= | P | 10/01/2021 | roof top skid for coolers---ok / | BRIAN | BRIAN | | E= | P | 7127945 |
BIBLE ELECTRIC, INC. | E= | P | 09/30/2021 | electronics, customer service, juice bar and grid, produce and deli walk-ins (LABEL DISCONNECTS, PANEL AND CIRCUITS ) coffin case coolers, ICE MACHINE NEEDS HOOKED UP AND DISCONNECT, 15a MAX /still need EP inspection and rack house C inspection / | MIGUEL | MIGUEL | | E= | P | 7126211 |
BIBLE ELECTRIC, INC. | ER | P | 09/30/2021 | walk-in deli cooler ok / | MIGUEL | MIGUEL | | ER | P | 7126197 |
BIBLE ELECTRIC, INC. | E= | R | 09/29/2021 | need electrician on site / | MIGUEL | MIGUEL | | E= | R | 7123822 |
BIBLE ELECTRIC, INC. | ER | P | 09/29/2021 | WALK-IN DELI COOLER REJECTED: change EMT fittings into all WP boxes w/ threaded KOs to NPT rated / need electrician on site / | MIGUEL | MIGUEL | | ER | P | 7123821 |
BIBLE ELECTRIC, INC. | ER | P | 09/24/2021 | ICE maker wall, 4 outlets / | MIGUEL | MIGUEL | | ER | P | 7118841 |
BIBLE ELECTRIC, INC. | ER | P | 08/12/2021 | chase in produce cooler w/ raceways ok / | MIGUEL | MIGUEL | | ER | P | 7069598 |
BIBLE ELECTRIC, INC. | ER | P | 08/04/2021 | Produce cooler and juice wall ok. / | LOGANP | LOGANP | | ER | P | 7060636 |
PERFORMANCE AIR COOLING, INC. | H= | C | 05/24/2022 | SPLICE ON FILE PER PREVIOUS NOTES (E-PLAN PG.#76). REFRIGERATION CONTRACTOR COMPLETE. | PAULO | PAULO | | H= | C | 7387611 |
PERFORMANCE AIR COOLING, INC. | HE | L | 05/23/2022 | Renewed online for Half Fee at May 23 2022 12:06PM (RECEIPT #: 1868935) | WEBSITE | WEBSITE | | HE | L | 7385563 |
TDR CONTRACTORS, INC. | H= | C | 04/12/2022 | ok. MECHANICAL CONTRACTOR COMPLETE. | PAULO | PAULO | | H= | C | 7335358 |
TDR CONTRACTORS, INC. | H= | P | 04/01/2022 | NEED SUPPORT FOR RECTANGULAR SUPPLY AIR DUCT PLENUM PER PLANS (DETAIL E-PLAN PG.#25/M1) (MAY ATTACH CLEAR PHOTOS TO PERMIT AND REACLL FOR INSPECTION). | PAULO | PAULO | | H= | P | 7323405 |
TDR CONTRACTORS, INC. | HD | C | 04/01/2022 | Note / All supply air ducting and diffusers ok. | PAULO | PAULO | | HD | C | 7323398 |
TDR CONTRACTORS, INC. | HE | L | 04/01/2022 | Renewed for No Fee at 4/1/2022 8:08:22 AM | BRITNEY | BRITNEY | | HE | L | 7322694 |
PERFORMANCE AIR COOLING, INC. | HRP | C | 11/01/2021 | FINAL PENDING-- ROOF TOP INSPECTION-- ENGINEER TO ADDRESS RCU-2 (PLANS CALL FOR NEW INSTALLATION/CONTRACTOR STATES IT IS GOING AWAY). Walk in Coolers-- all ok. | PAULO | PAULO | | HRP | C | 7161287 |
PERFORMANCE AIR COOLING, INC. | HRP | P | 10/21/2021 | ROOF TOP INSPECTION-- ENGINEER TO ADDRESS RCU-2 (PLANS CALL FOR NEW INSTALLATION/CONTRACTOR STATES IT IS GOING AWAY), ISOLATE AND PROTECT LIQUID LINE TO MTC-3, COMPLETE INSULATION ON SUCTION LINES BELOW MTC-3 AND SEAL UP BOTTOM OF MTC-3 UNIT.INSTALLATION MANUAL FOR MTC-3. INSIDE WALK IN COOLERS AND CASES-- INSULATE SUCTION LINE ON HORIZONTAL BETWEEN CASE #4 &5, CONDENSATE DRAIN FOR WEST SIDE WALK IN PRODUCE COOLER TO HAVE AN AIR GAP PER PLANS, 2" CONDENSATE DRAINS TO HAVE A 1" AIR GAP TO FLOOR DRAIN/RECEPTACLE. | PAULO | PAULO | | HRP | P | 7150402 |
PERFORMANCE AIR COOLING, INC. | HRP | P | 10/19/2021 | INSPECTION FOR INSIDE LINE SETS AND CONDENSATE DRAINS. CONTRACTOR TO ADDRESS THE FOLLOWING-- SEAL ALL LINE SET PENETRATIONS TO WALK IN COOLERS PER PLANS, SUPPORT ALL LINE SETS EVERY 6' PER PLANS, INSULATE SUCTION LINE ON HORIZONTAL BETWEEN CASE #4 &5, CONDENSATE DRAIN FOR WEST SIDE WALK IN PRODUCE COOLER TO HAVE AN AIR GAP PER PLANS. (NO ROOF TOP INSPECTION TODAY) | PAULO | PAULO | | HRP | P | 7147176 |
PERFORMANCE AIR COOLING, INC. | HRP | P | 10/18/2021 | CONTRACTOR TO ADDRESS THE FOLLOWING-- (ADDED NOTES- 10/19/21- STILL NEED ROOF TOP INSPECTION/WILL NEED A RE-INSPECTION FOR ALL KEY NOTES ON R-PLANS AS COULD NOT GET PLANS UPLOADED FOR PROPER INSPECTION). NEED TO INSULATE FURTHEST SUCTION LINE COMPLETE TO FAN COIL IN EAST WALK IN COOLER, INSULATE 3RD VERTICAL RISER ON HORIZONTAL SECTION, CONDENSATE DRAIN TERMINATION AT P-TRAP NEEDS AIR GAP PER PLANS (COMPUTER WILL NOT UPLOAD PLANS AND MAY UPDATE NOTES IF NEEDED) (MAY ATTACH CLEAR PHOTOS TO PERMIT AND RECALL FOR INSPECTION AFTER ADDED NOTES). | PAULO | PAULO | | HRP | P | 7145172 |
PERFORMANCE AIR COOLING, INC. | HRP | P | 07/26/2021 | OBSERVED A 350 PSI PRESSURE TEST AT THE BACK OF BUILDING OVER EXISTING COOLERS ON 3", 2.5", 11/4" & 1" PIPING. Still need to complete piping and insulation. | MARKB | MARKB | | HRP | P | 7049410 |
COS PLUMBING LLC | P= | C | 10/06/2021 | 2 SINKS 1 ICE MAKER | ANTHONYT | ANTHONYT | | P= | C | 7132025 |
COS PLUMBING LLC | PTO | C | 10/05/2021 | Corrections complete, AAV's accepted by mechanical engineer | FRANKM | FRANKM | | PTO | C | 7129966 |
COS PLUMBING LLC | PTO | P | 09/30/2021 | Corrections completed from 9-27-21 visit / need letter from engineer approving the use of AAV's Note : AAV @ floor drains (2)
| FRANKM | FRANKM | | PTO | P | 7125240 |
COS PLUMBING LLC | PTO | P | 09/27/2021 | Insulate domestic hot water / remove "dead leg" (abandoned) sections of both hot & cold water / support vertical DWV @ 10' (ok to upload photos of corrections @ next inspection request) | FRANKM | FRANKM | | PTO | P | 7120427 |
COS PLUMBING LLC | PB | C | 08/24/2021 | OK on floor sink DWV @ grids 10 & E.5 | FRANKM | FRANKM | | PB | C | 7082816 |
COS PLUMBING LLC | PTO | P | 08/05/2021 | DWV & H2O to hand sink @ grids 7.5 x B.5 | FRANKM | FRANKM | | PTO | P | 7062698 |
COS PLUMBING LLC | PTO | R | 08/04/2021 | No access or escort , tried contacting contractor w/ out success , re-schedule . | FRANKM | FRANKM | | PTO | R | 7061029 |
COS PLUMBING LLC | PB | P | 08/04/2021 | Corrections complete from 7-28-21 visit , see photos | FRANKM | FRANKM | | PB | P | 7059719 |
COS PLUMBING LLC | PB | P | 07/29/2021 | Corrections complete from 7-15-21 visit , see photos | FRANKM | FRANKM | | PB | P | 7053528 |
COS PLUMBING LLC | PB | P | 07/28/2021 | Closet wrap required @ risers w/ out drains / complete bedding around piping (upload correction pics @ next inspection request) / Still require correction pics from 7-15-21 PB inspection OK on underground DWV between grids E.5 & E.7 and between 7.2 & 8.5 / OK on 2" f.d. @ grid 8.2 x E.4 | FRANKM | FRANKM | | PB | P | 7051756 |
COS PLUMBING LLC | PB | P | 07/15/2021 | Closet wrap required @ risers w/ out drains / remove rocks in pipe bedding (upload correction photographs at next inspection request) OK on underground DWV rough @ grids B.2 X 8.5 (3" F.S.) OK on underground DWV rough along grid B.2 between 7 & 9 | FRANKM | FRANKM | | PB | P | 7037882 |