EXECUTIVE CUSTOM CONSTRUCTION, INC. | B= | C | 02/08/2022 | Items from previous inspection corrected | DAKOTAB | DAKOTAB | | B= | C | 7262951 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 02/08/2022 | State electrical and plumbing inspection observation on file | DAKOTAB | DAKOTAB | | BSP | P | 7262454 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | B= | P | 02/04/2022 | Missing 48" landing at bottom of south stairs from press box -- Need state electrical and plumbing certificates -- Pending other finals -- Schedule a new Building Final when above items are complete. | DAKOTAB | DAKOTAB | | B= | P | 7260420 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | C | 11/29/2021 | Stucco lath OK | DAKOTAB | DAKOTAB | | BLA | C | 7190354 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BIN | P | 11/16/2021 | Thermal insulation OK -- ES report for Spray foam insulation and ignition barrier received | DAKOTAB | DAKOTAB | | BIN | P | 7178980 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/02/2021 | Interior light gauge framing OK pending other roughs -- Still need to inspect stairs once installed -- Reviewed Accessible Elements -- Discussed insulation inspections and inspections, Will need ES report for spray foam and thermal barrier | DAKOTAB | DAKOTAB | | BFR | P | 7162476 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/26/2021 | Roof joist framing, structural fascia, and clip attachment OK | DAKOTAB | DAKOTAB | | BFR | P | 7155143 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/25/2021 | Need to have at least a partial on MEP rough inspections prior to interior frame inspection -- Reviewed upper level framing and roof framing per splices -- Reviewed clear floor space at drinking fountains pending splice | DAKOTAB | DAKOTAB | | BFR | P | 7153247 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 10/18/2021 | Open hole on file -- 2400 PSF | DAKOTAB | DAKOTAB | | BSP | P | 7144265 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/15/2021 | Heavy gauge steel floor frame OK -- Will still need to inspect light gauge frame once MEPs have been installed | DAKOTAB | DAKOTAB | | BFR | P | 7144007 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFN | C | 09/28/2021 | Engineer letter for foundation on file -- Eufer noted | DAKOTAB | DAKOTAB | | BFN | C | 7122173 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFT | P | 09/28/2021 | Engineer letter for footing received -- Still need open hole | DAKOTAB | DAKOTAB | | BFT | P | 7122168 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFI | C | 08/23/2021 | Need all foundation engineering observations and open hole -- R-10 insulation OK | DAKOTAB | DAKOTAB | | BFI | C | 7081921 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFN | P | 08/23/2021 | Authorized 3rd party engineer inspection with all observation paperwork to follow | DAKOTAB | DAKOTAB | | BFN | P | 7081920 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFT | P | 08/23/2021 | Authorized 3rd party engineer inspection with all observation paperwork to follow | DAKOTAB | DAKOTAB | | BFT | P | 7081876 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | C | 01/21/2022 | MECHANICAL FINAL COMPLETE | TREVORH | TREVORH | | H= | C | 7245813 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | P | 01/20/2022 | MECHANICAL FINAL PENDING---------TEST AND BALANCE ALREADY IN IMAGES. | TREVORH | TREVORH | | H= | P | 7245449 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | P | 01/13/2022 | TEST AND BALANCE REPORT UPLOADED WILL REVIEW AND COMPARE WHEN PLAN SPLICE IS APPROVED, WILL STILL NEED ON SITE INSPECTION TO VIEW DUCTING INSTALLED OVER SOFFITS PER PREVIOUS INSPECTION. | TREVORH | TREVORH | | H= | P | 7237855 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HD | P | 12/30/2021 | STILL NEED REVISED/APPROVED PLANS, NO ON SITE INSPECTION TODAY | NANCY | NANCY | | HD | P | 7224585 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HV | C | 12/03/2021 | FURNACE VENTING OK. CHECK CONNECTIONS TO EQUIPMENT AND TERMINATIONS AT FINAL. | DUSTINS | DUSTINS | | HV | C | 7197034 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HD | P | 12/01/2021 | CONTRACTOR WORKING FROM SET OF PLANS NOT STAMPED BY PPRBD. NEED REVISED/APPROVED PLANS. INSPECTED SUPPLY AIR FOR F-1 ON UPPER LEVEL AND IN CONCESSIONS WITH CONTRACTOR PLANS DUE TO SOFFITS BEING BUILT. COVER AT OWN RISK UNTIL PLANS HAVE BEEN APPROVED. | DUSTINS | DUSTINS | | HD | P | 7193629 |
FRONTIER MECHANICAL SYSTEMS INC | HSP | P | 11/29/2021 | GAS IS INSPECTED BY STATE ON SCHOOLS. NO INSPECTIONS WILL BE DONE BY PPRBD FOR GAS. CONTRACTOR TO REMOVE GAS PIPING FROM SCOPE OF WORK. | DUSTINS | DUSTINS | | HSP | P | 7190783 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HRP | C | 11/29/2021 | 300 LB TEST OK ON LINE SET FOR F-1. | DUSTINS | DUSTINS | | HRP | C | 7190781 |
NIELSEN MECHANICAL CONTRACTORS, LLC | XMS | T | 01/18/2022 | PAID (REC#1837001): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised duct layout, relocated CU | JUSTINC | JUSTINC | | XMS | T | 7241059 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | XBS | T | 09/28/2021 | PAID (REC#1814810): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Structural revisions | MICHAELA | MICHAELA | | XBS | T | 7122270 |