GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 03/02/2023 | | BRIANB | BRIANB | | B= | C | 7674565 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 08/18/2022 | pending other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | BRIANB | BRIANB | | B= | P | 7487703 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/07/2022 | missing all restroom signage / missing all grab bars restrooms 2118 and 2129 / need to complete final inspection for dock addition - core and shell permit and other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), FIRE ALARM: ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet, U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 7402421 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/18/2022 | GYP PENETRATIONS / ABOVE GRID / 2ND FLR / observed above grid gyp penetrations 2nd floor | BRIANB | BRIANB | | BSP | P | 7380415 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/05/2022 | above ceiling 1st floor storage and conference rooms with adjacent corridor okay | BOBF | BOBF | | BSP | P | 7365678 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/14/2022 | FRAME - HARD LIDS / 2ND FLR / observed hard lid framing 2nd floor / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7339166 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/17/2022 | 1st floor -- Remainder of light gauge framed soffits through out 1st floor OK
2nd floor -- Wall Frame -- Need to firecaulk all penetrations at floor through out -- Rest of wall frame on 2nd floor OK | DAKOTAB | DAKOTAB | | BFR | P | 7305868 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/14/2022 | observed corrections from BFR inspection 8MAR22 / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7300647 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/10/2022 | Gypsum attachment at interior and exterior of Storage rooms 17055, 17035, 17015 OK | DAKOTAB | DAKOTAB | | BSP | P | 7297423 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2022 | Light gauge soffit frame at hallway 1700 and sm conference room 1702 OK | DAKOTAB | DAKOTAB | | BFR | P | 7297421 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/08/2022 | FRAME / 1ST FLR / missing fire stop at all plumbing penetrations through floor / observed wall framing at 1st floor / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7294193 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/28/2022 | PARTIAL / TOP OF WALL ONLY / 2ND FLR / observed top of wall framing for non-rated walls at 2nd floor / pending other rough inspections ----
PARTIAL / 1" GYP & MTL FRAME / 1ST FLR / STORAGE 1703-1S / observed 1" American gyp panels and mtl framing per proposed V455 assembly onsite - approved design requires U419 assembly w/ USG gyp for 1hr fire barriers - still need to inspect all penetrations / updated 8MAR22 - see approved plan splice for revised fire rated assemblies - changed inspection to partial | BRIANB | BRIANB | | BFR | P | 7284505 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/18/2022 | PARTIAL / WALL FRAME - TOP OF WALL ONLY / 1ST FLR - AREA111 / wall framing incomplete around column in storage 1703S / observed top of wall framing at areas noted / discussed details for fire barrier U419 assembly with site rep / need to attach electrical and pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7276353 |
ENCORE ELECTRIC, INC. | E= | C | 08/11/2022 | FIRE ALARM INSPECTION: | AARONR | AARONR | | E= | C | 7479906 |
ENCORE ELECTRIC, INC. | E= | C | 08/11/2022 | | AARONR | AARONR | | E= | C | 7479900 |
ENCORE ELECTRIC, INC. | E= | C | 06/27/2022 | | AARONR | AARONR | | E= | C | 7426960 |
ENCORE ELECTRIC, INC. | E= | P | 06/14/2022 | Need GFCI breaker for water fountains. --- Need to secure boxes in tables in conference room. | AARONR | AARONR | | E= | P | 7411392 |
ENCORE ELECTRIC, INC. | ER | P | 05/19/2022 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 7382190 |
ENCORE ELECTRIC, INC. | ER | P | 05/19/2022 | 2nd floor drop ceilings-----talked about TR outlets for final | RANDY | RANDY | | ER | P | 7382189 |
ENCORE ELECTRIC, INC. | ER | P | 05/05/2022 | FIRE ALARM INSPECTION: Above ceiling rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7366070 |
ENCORE ELECTRIC, INC. | ER | P | 05/05/2022 | Above ceiling rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7365973 |
ENCORE ELECTRIC, INC. | ER | P | 04/21/2022 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 7347911 |
ENCORE ELECTRIC, INC. | ER | P | 04/21/2022 | hardlid in board room 2403 ok----marked on plans | RANDY | RANDY | | ER | P | 7347910 |
ENCORE ELECTRIC, INC. | ER | P | 04/14/2022 | Hard lid rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7339411 |
ENCORE ELECTRIC, INC. | ER | P | 04/05/2022 | FIRE ALARM INSPECTION: Soffit rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7326819 |
ENCORE ELECTRIC, INC. | ER | P | 04/05/2022 | Soffit rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7326814 |
ENCORE ELECTRIC, INC. | ER | P | 03/28/2022 | Hard lids OK. --- Check print for areas inspected. | AARONR | AARONR | | ER | P | 7317143 |
ENCORE ELECTRIC, INC. | ER | P | 03/21/2022 | FIRE ALARM INSPECTION: Wall rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7309310 |
ENCORE ELECTRIC, INC. | ER | P | 03/21/2022 | Wall rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7309238 |
ENCORE ELECTRIC, INC. | ER | P | 03/08/2022 | Wall rough OK. See prints for areas inspected. | AARONR | AARONR | | ER | P | 7294609 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | C | 07/21/2022 | Stamped engineer letter received approving TAB report. See images. MECHANICAL CONTRACTOR FINAL OK. | LIDO | LIDO | | H= | C | 7454180 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 07/11/2022 | TEST AND BALANCE REPORT REVIEW / 1ST FLOOR PLAN SPLICE PAGE MH-111 (BDA 104) DATED 3/24/22 : MISSING ALL RETURN AIR READINGS / ROOM #1701 - SUPPLY SLOT 1,2,3,4,5 AND 6 ARE NOT PER THE DESIGN CFM'S AND ARE OUTSIDE THE ALLOWED 10% +/- / HALL # 1700 - MISSING 1 SUPPLY REGISTER READING / ROOM # 1703S - SUPPLY REGISTER 2 IS NOT PER THE DESIGN CFM'S AND IS OUTSIDE THE ALLOWED 10% +/- ./ ROOM # 1704 - MISSING EXHAUST AIR READINGS / 2ND FLOOR PLAN SPLICE MH-121 (BDA 90) DATED 11/11/21 : MISSING ALL RETURN AIR READINGS / ROOM # 2400 - MISSING SUPPLY AIR READINGS / NEED REVISED TEST AND BALANCE REPORT OR ENGINEER OF RECORD TO APPROVE THE READING / | LIDO | LIDO | | H= | P | 7440935 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 07/11/2022 | CONTINUATION OF NOTES FOR TEST AND BALANCE REPORT REVIEW / 2ND FLOOR PLAN SPLICE MH-121 (BDA 90) DATED 11/11/21 : ALSO MISSING SUPPLY AIR READINGS FOR ROOM #2118 AND 2129 / | LIDO | LIDO | | H= | P | 7442069 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 07/06/2022 | TEST AND BALANCE REPORT IS BEING REVIEWED/ | LIDO | LIDO | | H= | P | 7435869 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 06/28/2022 | THERMOSTAT FOR EH-2-3 INSTALLED. SEE IMAGES./ HVAC CONTRACTOR FINAL PENDING : NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7428667 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 06/14/2022 | HAD PHONE CONVERSATION WITH CONTRACTOR (J.H) ABOUT THE FOLLOWING / MECHANICAL FINAL PENDING : 2ND FLOOR MH121 / MP121- INSTALL THERMOSTAT FOR EH-2-3 ON WALL PER PLAN./ NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7410079 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 06/10/2022 | HYDRONIC (HWS/HWR) CONTRACTOR FINAL OK / | LIDO | LIDO | | H= | C | 7407416 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 05/17/2022 | 2ND FLOOR MH121 : SUPPLY, RETURN, FLEX DUCT, GRILLS AND REGISTERS OK . MECHANICAL FINAL PENDING : 2ND FLOOR MH121 - INSTALL THERMOSTAT FOR EH-2-3 ON WALL PER PLAN./ NEED TEST AND BALANCE REPORT /
| LIDO | LIDO | | H= | P | 7379505 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | C | 05/11/2022 | 1ST FLOOR PLAN PAGE MH111 : FINAL OK / | LIDO | LIDO | | HD | C | 7372355 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/28/2022 | 1st FLOOR PLAN PAGE MH111 : PLAN SPLICE FOR VAV -RD-1-3 MOVED FROM HALLWAY # 1700 TO ROOM 1703 / VAV -RD-1-2 MOVED FROM HALLWAY #1700 TO ROOM # 1705 IS ON FILE / ALL SUPPLY, RETURN, EXHAUST FLEX DUCT, GRILLS AND REGISTERS OK / | LIDO | LIDO | | HD | P | 7356305 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 04/25/2022 | 2ND FLOOR FINAL HEAT WATER SUPPLY AND RETURN CONNECTION TO ALL VAV'S ON THIS FLOOR : HYDRONIC PIPING UNDER OPERATING PRESSURE, NO VISIBLE LEAKS. ALL CONNECTIONS OK / | LIDO | LIDO | | HWP | C | 7351370 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 04/06/2022 | 1ST FLOOR FINAL HEAT WATER SUPPLY AND RETURN CONNECTION TO ALL VAV'S ON THIS FLOOR : HYDRONIC PIPING UNDER OPERATING PRESSURE, NO VISIBLE LEAKS. ALL CONNECTIONS OK / | LIDO | LIDO | | HWP | P | 7329106 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/22/2022 | 2ND FLOOR PLAN PAGE MH121 (BDA90) : SUPPLY, RETURN AND EXHAUST DUCT ROUGH COMPLETE. OK TO INSULATE /
| LIDO | LIDO | | HD | P | 7310682 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/21/2022 | 2ND FLOOR PLAN PAGE MH 121 (BDA48) : ALL VAV'S AND LOW PRESSURE DUCT ROUGH OK. OK TO INSULATE DUCT / RETURN AIR DUCT ROUGH COMPLETE. OK TO INSULATE / | LIDO | LIDO | | HD | P | 7309182 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/11/2022 | 1st FLOOR PLAN PAGE MH111 ( BDA47) : ONE FIRE DAMPER IS MISSING THE ACCESS DOOR / MISSING SUPPLY AIR TO ROOM # 1701S / SUPPLY AND RETURN DUCT ROUGH OK. OK TO WRAP./ | LIDO | LIDO | | HD | P | 7299146 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 03/10/2022 | 1st FLOOR PLAN PAGE MH111 ( BDA47) : VAV -RD-1-3 MOVED FROM HALLWAY # 1700 TO ROOM 1703 / VAV -RD-1-2 MOVED FROM HALLWAY #1700 TO ROOM # 1705.. NEED REVISED AND APPROVED PLANS FOR NEW VAV LOCATIONS / PARTIAL SUPPLY, RETURN AND EXHAUST DUCT ROUGH OK. OK TO WRAP / 5- VAV INSTALLED OK / | LIDO | LIDO | | HD | P | 7297322 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 02/18/2022 | 1ST FLOOR PLAN PAGE MH112 ( BDA 47) : 3 DAMPER FRAMES OK / | LIDO | LIDO | | HD | P | 7276361 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 07/06/2022 | | JOSEPHD | JOSEPHD | | P= | C | 7436574 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 07/06/2022 | | JOSEPHD | JOSEPHD | | PTO | C | 7436564 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 06/03/2022 | engineer letter for aav in images, | JOSEPHD | JOSEPHD | | P= | P | 7397983 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 05/25/2022 | need to see ice maker drain installed, need engineer letter for aav @ lav, other corrections made | JOSEPHD | JOSEPHD | | P= | P | 7389105 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 05/23/2022 | lacking knee protection at lav 2402, lacking 5' clearance for toilet at 2118, lacking knee protection at 1706,1704, need to see ice maker at 2409, rest ok | JOSEPHD | JOSEPHD | | P= | P | 7385680 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/24/2022 | over head water lines in hallway 1700 ok | JOSEPHD | JOSEPHD | | PTO | P | 7313781 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/21/2022 | over head water pipe in hall way 2410 ok, insulation ok | JOSEPHD | JOSEPHD | | PTO | P | 7308773 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/16/2022 | water in walls and over head in rooms, 2402,2409,2118,2129 ok, need to see insulation | JOSEPHD | JOSEPHD | | PTO | P | 7303174 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/10/2022 | COURTESY INSPECTION UNDERGROUND FOR A SINK, PERMIT NOT SECURED YET -- ONE PB FOR SINK OK | LEE | LEE | | PTO | P | 7296884 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/09/2022 | 1ST FLOOR RESTROOM # 1704 H20 IN WALLS AND CEILING OF RESTROOM ONLY OK PENDING ((( NEED PLNS TO REFLECT 1-1/2" TO WATER CLOSETS, PLANS SHOW 2" ))) -- RESTROOM # 1706 H20 IN WALLS AND CEILING OF RESTROOM ONLY OK -- EWC-1 IN HALL H20 IN WALL ALSO OK | LEE | LEE | | PTO | P | 7295678 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/03/2022 | ALL DWV COMPLETE MINUS ICE MAKER FIXTURE DRAIN 2ND FLOOR -- ((( NEED REVISIONS FOR BREAK ROOM SINK DELETED AND AAV AT RESTROOM LAV ))) | LEE | LEE | | PTO | P | 7289442 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/28/2022 | 1ST FLOOR 3" VENT STACK UP TO 2ND FLOOR OK -- NEED 2ND FLOOR PIPING TO VTR COMPLETED AND TESTED -- D/F DWV INCOMPLETE ON 1ST FLOOR ( MISSING SAN-TEE ) | LEE | LEE | | PTO | P | 7283838 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/17/2022 | RESTROOM 2ND FLOOR -- # 2402 DWV ONLY UNDER-FLOOR AND VENT STACK FROM 1ST TO 2ND OK -- TWO RESTROOMS THAT WERE ON CORE AND SHELL PLANS DWV ONLY UNDER-FLOOR OK -- ((( NEED ENGINEER TO APPROVE AAV AT LAV SAME RESTROOM ))) | LEE | LEE | | PTO | P | 7274230 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/15/2022 | waste and vent stacks column 33 - H.1 1st floor stubbed to 2nd floor ok. | DANR | DANR | | PTO | P | 7270702 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 03/25/2022 | PAID (REC#1856727): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Head of wall detail | SHELLEY | SHELLEY | | XBS | T | 7315006 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 03/24/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout and GRD revisions | JUSTINC | JUSTINC | | XMS | P | 7312901 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 03/09/2022 | PAID (REC#1849428): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 83 revisions: Adjusted sheet PP111 and PP121. | SHANEN | SHANEN | | XPS | T | 7296211 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 03/09/2022 | PAID (REC#1849244): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revisions to listings and assemblies | SHELLEY | SHELLEY | | XBS | T | 7295504 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 03/04/2022 | PAID (REC#1848716): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Added alternate listings for rated assemblies; added firestopping systems | LBENNETT | LBENNETT | | XBS | T | 7291540 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 02/08/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised schedule | JUSTINC | JUSTINC | | XMS | P | 7262693 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 02/08/2022 | PAID (REC#1842855): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 78 revisions: Adjusted sheet PL111. | SHANEN | SHANEN | | XPS | T | 7262649 |
U.S. ENGINEERING CONSTRUCTION, LLC | XMS | T | 11/11/2021 | PAID (REC#1833382): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions. | JUSTINC | JUSTINC | | XMS | T | 7173853 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XES | P | 11/03/2021 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Minor lighting, power and systems revisions. | BERTHA | BERTHA | | XES | P | 7164813 |
U.S. ENGINEERING CONSTRUCTION, LLC | XMS | P | 11/03/2021 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised exhaust | JUSTINC | JUSTINC | | XMS | P | 7164669 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XPS | T | 11/03/2021 | PAID (REC#1823753): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 45 revisions: Adjusted sheet PL111, PL121 and PP121. | SHANEN | SHANEN | | XPS | T | 7164666 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 11/03/2021 | PAID (REC#1823755): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revisions to kitchenette room 2409 and creation of IT room 2411 | LBENNETT | LBENNETT | | XBS | T | 7164511 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XES | P | 11/02/2021 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added bathroom scope. | BERTHA | BERTHA | | XES | P | 7162223 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XMS | P | 11/02/2021 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised layout and scope | JUSTINC | JUSTINC | | XMS | P | 7162094 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XPS | T | 09/13/2021 | PAID (REC#1823756): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 59 revisions: Adjusted sheet PL111, PL121, PP111 and PP121. | SHANEN | SHANEN | | XPS | T | 7104694 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 09/13/2021 | PAID (REC#1823757): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Addded scope: toilet rooms 2118 & 2129 | LBENNETT | LBENNETT | | XBS | T | 7104278 |