GOEBEL CONSTRUCTION, INC | B= | C | 07/14/2022 | Changed to B= / Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file / | TRENTP | TRENTP | | B= | C | 7445613 |
GOEBEL CONSTRUCTION, INC | B= | P | 07/13/2022 | Need to provide air leakage test results / Finished basement, rear deck, AC -- Schedule a new Building Final when above items are complete. | TRENTP | TRENTP | | B= | P | 7444755 |
GOEBEL CONSTRUCTION, INC | BSP | P | 07/13/2022 | Duplicate blown in insulation certificate on file | TRENTP | TRENTP | | BSP | P | 7443847 |
GOEBEL CONSTRUCTION, INC | BLA | C | 05/10/2022 | | TRENTP | TRENTP | | BLA | C | 7370210 |
GOEBEL CONSTRUCTION, INC | BSP | R | 05/05/2022 | Paperwork for mechanical inspector to be uploaded to mechanical inspection | TRENTP | TRENTP | | BSP | R | 7364648 |
GOEBEL CONSTRUCTION, INC | BIN | C | 04/15/2022 | Installers certificate for blown in insulation on file | TRENTP | TRENTP | | BIN | C | 7339555 |
GOEBEL CONSTRUCTION, INC | BIN | P | 04/14/2022 | Need to provide installers certificate for blown in insulation, observed 5 1/2 inches in walls / Will inspect attic insulation at final, need air leakage test results by final | TRENTP | TRENTP | | BIN | P | 7338671 |
GOEBEL CONSTRUCTION, INC | BFR | C | 04/14/2022 | Items corrected | TRENTP | TRENTP | | BFR | C | 7338658 |
GOEBEL CONSTRUCTION, INC | BFR | R | 04/11/2022 | Portal detail calls for 2 inch by 2 inch by 3/16 inch thick washers / Noted stamped letter for other changes | PAULP | PAULP | | BFR | R | 7333590 |
GOEBEL CONSTRUCTION, INC | BFR | P | 04/11/2022 | Stamped letters for deck and headers on file | PAULP | PAULP | | BFR | P | 7332816 |
GOEBEL CONSTRUCTION, INC | BFR | R | 04/08/2022 | 1. Need to upload engineer letter for post caps and change of deck joists electronically / 2. Still missing 2x2 inch washers at narrow braced wall anchor bolts / 3. Missing blocking at garage door brackets / 4. Missing ladder framing under both front dormers per note in plans / 5. Need to tie top plate to header in bedroom 3 / 6. Missing king studs at basement sliding glass door, need clarification for header installed above top plate / 7. Need to tie both top plates to headers at guest bedroom window and door / Finished basement, rear deck | TRENTP | TRENTP | | BFR | R | 7332085 |
GOEBEL CONSTRUCTION, INC | BSP | L | 03/28/2022 | Cancelled by contractor (Marvin) | TRENTP | TRENTP | | BSP | L | 7315969 |
GOEBEL CONSTRUCTION, INC | BSP | R | 03/21/2022 | Unable to identify anchor bolts and plate washers at narrow braced walls / Missing interior strap at southern most narrow brace wall opening / Deck post caps bent out of compliance and not installed per manufactures specs / Plans call for deck joists to be 2x12s and 2x10s, BCI 6000s installed / Post caps for deck cover installed upside down / Deck cover lid and nothern popout roof okay | TRENTP | TRENTP | | BSP | R | 7308624 |
GOEBEL CONSTRUCTION, INC | BSP | P | 03/21/2022 | Structural plan pages on file / Pending field inspection of requested items | TRENTP | TRENTP | | BSP | P | 7307842 |
GOEBEL CONSTRUCTION, INC | BSP | P | 03/01/2022 | Updated truss packet on file | TRENTP | TRENTP | | BSP | P | 7285169 |
GOEBEL CONSTRUCTION, INC | BFN | C | 02/28/2022 | Changed to BFN / Engineer observation of exterior piers on file | TRENTP | TRENTP | | BFN | C | 7283575 |
GOEBEL CONSTRUCTION, INC | BFN | P | 02/08/2022 | Duplicate footing/foundation observation provided / Per engineers observation letter for footing/foundation, exterior pads/piers were not observed, will need to provide observation or request inspection / No inspection performed per request comment | TRENTP | TRENTP | | BFN | P | 7262510 |
GOEBEL CONSTRUCTION, INC | BFI | C | 01/31/2022 | R10 installed | TRENTP | TRENTP | | BFI | C | 7255398 |
GOEBEL CONSTRUCTION, INC | BFD | C | 01/31/2022 | Drain is usable to daylight at west side, dampproofing okay / Drain ok / Contractor to backfill per requirements of Soils Report / Note: Need to complete BFN | TRENTP | TRENTP | | BFD | C | 7255394 |
GOEBEL CONSTRUCTION, INC | BFI | P | 01/31/2022 | Upload of duplicate paperwork / Pending field inspection | TRENTP | TRENTP | | BFI | P | 7254764 |
GOEBEL CONSTRUCTION, INC | BFD | P | 01/31/2022 | Soils report and open hole uploaded / Pending field inspection | TRENTP | TRENTP | | BFD | P | 7254756 |
GOEBEL CONSTRUCTION, INC | BFN | P | 01/31/2022 | Per engineers observation letter for footing/foundation, exterior pads/piers were not observed, will need to provide observation or request inspection / Engineer letter for foundation on file -- Eufer noted / Foundation design on file (Bearing Capacity Verified) / | TRENTP | TRENTP | | BFN | P | 7254745 |
GOEBEL CONSTRUCTION, INC | BFT | C | 01/31/2022 | open hole on file -- 4000 PSF -- usable -- 10% / footing and foundation observation on file - ufer noted / foundation design on file (bearing capacity verified) / | TRENTP | TRENTP | | BFT | C | 7254729 |
GOEBEL CONSTRUCTION, INC | BFT | P | 10/18/2021 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 7144646 |
GOEBEL CONSTRUCTION, INC | BFN | P | 10/18/2021 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 7144645 |
A N' M ELECTRIC | E= | C | 07/12/2022 | 30 amp a/c GFCI protection of A/C unit not required due to variance granted by the State Electrical Board 9/29/2021. / | TOMC | TOMC | | E= | C | 7442590 |
A N' M ELECTRIC | EP | C | 04/05/2022 | main sub panel and 2nd sub-panel in mech room | TOMC | TOMC | | EP | C | 7326676 |
A N' M ELECTRIC | ES | C | 04/05/2022 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | TOMC | TOMC | | ES | C | 7326634 |
A N' M ELECTRIC | ER | C | 04/05/2022 | 1 - 4/0 AL , 1 - # 2 AL , 2 - # 6 AL , 2 - # 8 AL , 2 - # 10 , no mcc , no central vac finished basement , panels in lower mech room | TOMC | TOMC | | ER | C | 7326626 |
A N' M ELECTRIC | EUG | C | 03/28/2022 | EUG OK ----- 4/0 4/0 2/0 ------ | GREGM | GREGM | | EUG | C | 7316576 |
CUSTOM CLIMATE CONTROL | H= | C | 07/06/2022 | Whole House Ventilation being achieved with exhaust fan located in master bathroom / Whole House Ventilation Switch located in master bathroom / NOTE / A/C COMPLETE / NO OUTSIDE AIR TO FURNACE RETURN / FINISHED BASEMENT / LOUVER DOOR INTO MECHANICAL ROOM / DIRECT VENT FURNACE / | ANGELW | ANGELW | | H= | C | 7436406 |
DAVIS GAS SHOP INC | HC | C | 04/06/2022 | RELEASE METER FOR MEDIUM PRESSURE GAS SYSTEM | ANGELW | ANGELW | | HC | C | 7328352 |
DAVIS GAS SHOP INC | HI | C | 04/06/2022 | APPROVAL LETTER REQUIRED FROM BLACK HILL ENERGY FOR MEDIUM PRESSURE GAS SYSTEM BY FINAL / 10 LB TEST OK / 3/4 INCH MAIN / 1 FURNACE / 1 WATER HEATER / 1 RANGE / 1 MAIN LEVEL FIREPLACE / 1 BASEMENT FIREPLACE / 1 BBQ | ANGELW | ANGELW | | HI | C | 7328327 |
CUSTOM CLIMATE CONTROL | HRR | C | 04/05/2022 | EQUIPMENT CHANGE FORM REQUIRED BY FINAL FOR INDOOR COIL / WATER HEATER VENT PRESSURE TEST OK / | ANGELW | ANGELW | | HRR | C | 7325922 |
CUSTOM CLIMATE CONTROL | HRR | P | 04/01/2022 | REQUIRED BY FINAL: Equipment Change Form for indoor coil / Please see images for coil installed at HRR / CONTRACTOR TO ADDRESS THE FOLLOWING: Water Heater Vent requires a 5 lb pressure test / Whole House Ventilation being achieved with exhaust fan located in master bathroom / Verify Whole House Ventilation Switch location at final / NOTE / A/C ROUGH LINESET AND COIL / NO OUTSIDE AIR TO FURNACE RETURN / FINISHED BASEMENT / DIRECT VENT FURNACE / | ANGELW | ANGELW | | HRR | P | 7323532 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 03/30/2022 | MAIN LEVEL FIREPLACE CLEARANCES TO COMBUSTIBLES AND VENT TERMINATION OK / NON COMBUSTIBLE MATERIAL INSTALLED / BASEMENT FIREPLACE CLEARANCES TO COMBUSTIBLES AND VENT TERMINATION OK / | ANGELW | ANGELW | | HV | C | 7319944 |
PACIFIC PLUMBING, INCORPORATED | P= | C | 07/07/2022 | | LEE | LEE | | P= | C | 7437775 |
PACIFIC PLUMBING, INCORPORATED | P= | P | 06/15/2022 | PARTIAL FOR POTABLE WATER CERT. | LEE | LEE | | P= | P | 7411699 |
HOMEOWNER | PWO | C | 04/08/2022 | NOTE: AT FINAL NEED NON-POT WATER SIGNAGE ON YARD HYDRANT AND BACKFLOW INSPECTED AT MECH. ROOM | LEE | LEE | | PWO | C | 7331657 |
PACIFIC PLUMBING, INCORPORATED | PTO | C | 04/01/2022 | WATER HEATER VENT TEST / INSTALL OK | LEE | LEE | | PTO | C | 7322957 |
HOMEOWNER | PWO | P | 04/01/2022 | YARD HYDRANT SUPPLY AND H20 SERVICE OK FROM FOUNDATION OUT TO 10' FROM EXISTING WELL HEAD -- NEED TIE-IN CONNECTIONS ON BOTH | LEE | LEE | | PWO | P | 7322954 |
PACIFIC PLUMBING, INCORPORATED | PTO | P | 03/29/2022 | WHEN WILL WATER SERVICE BE INSTALLED ?? -- REST OK -- THREE VTR -- AAV @ LEFT MASTER ( NO CWV THERE ) -- VEG SINK -- BAR SINK -- BSMT. DBL LAVS ( IN CLOSET WALL ) -- TUB TEMPERING VALVE IN VANITY | LEE | LEE | | PTO | P | 7317721 |
PACIFIC PLUMBING, INCORPORATED | PB | C | 02/09/2022 | note: no water in at time of PB inspection, will need pwo for water, check for double cleanout at back of house at pto, cwv @ basement lav not on outside wall | JOSEPHD | JOSEPHD | | PB | C | 7264558 |
GOEBEL CONSTRUCTION, INC | XBS | T | 03/25/2022 | PAID (REC#1853539): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised windows and door, increased wall plate height. | SHELLEY | SHELLEY | | XBS | T | 7314416 |