INNOVATIVE CONSTRUCTION, INC. | B= | C | 12/21/2022 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 7617336 |
INNOVATIVE CONSTRUCTION, INC. | B= | P | 10/11/2022 | With completed required inspections B= okay. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NATHAN | NATHAN | | B= | P | 7547130 |
INNOVATIVE CONSTRUCTION, INC. | BSP | P | 05/19/2022 | Ceiling grid wires OK | ADAML | ADAML | | BSP | P | 7382632 |
INNOVATIVE CONSTRUCTION, INC. | BFR | P | 03/01/2022 | Attach mechanical and complete required inspections / Light gauge metal framing OK / Make sure you maintain 18" on pull side of door at Conference 144 / Contact inspector for any accessibility related questions | ADAML | ADAML | | BFR | P | 7286347 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 05/19/2022 | | LOGANP | LOGANP | | E= | C | 7383057 |
INTERMOUNTAIN POWER SERVICES INC | E= | P | 05/09/2022 | 4 - MC's off of grid wire around VAV | BRETC | BRETC | | E= | P | 7369250 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 05/02/2022 | Fire Alarm contractor to attach to permit / FA and Electric ceilings - Ok | BRETC | BRETC | | ER | P | 7358949 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 02/28/2022 | Fire alarm contractor to attach to permit / All walls only - Ok / panel back box - Ok, look at panel on final or ceiling | BRETC | BRETC | | ER | P | 7283824 |
INTERMOUNTAIN POWER SERVICES INC | ER | R | 11/05/2021 | Drawings need to match floor plans - Drawings show #114 is now 111 / Unit #104 is turning into #111 per contractor? Does not match / Need POC to show right unit | BRETC | BRETC | | ER | R | 7167067 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 10/06/2022 | | MATTM | MATTM | | H= | C | 7542669 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 05/24/2022 | TEST AND BALANCE REPORT DOES NOT SHOW REQUIRED VENTILATION / | MATTM | MATTM | | H= | P | 7386587 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 05/20/2022 | FINAL PENDING - Provide test and balance report. OTHER CORRECTIONS MADE. | MARKB | MARKB | | H= | P | 7384362 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 05/16/2022 | MISSING FLEX AND DIFFUSER IN OFFICE 141 / OK TO ATTACH PICTURE AND TEST AND BALANCE REPORT TO NEXT INSPECTION / THERMOSTATS ARE IN PRE-EXISTING LOCATION / | MATTM | MATTM | | HD | P | 7377733 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 05/09/2022 | DUCT DESIGN PER PLANS / STILL NEED TO SEE THERMOSTATS, FLEX AND G.R.D.'s / PROVIDE TEST AND BALANCE REPORT / | MATTM | MATTM | | HD | P | 7369214 |
INNOVATIVE CONSTRUCTION, INC. | XMS | T | 02/15/2022 | PAID (REC#1843806): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 7270569 |
INNOVATIVE CONSTRUCTION, INC. | XBS | P | 02/10/2022 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Reduce scope of work | MICHAELA | MICHAELA | | XBS | P | 7266044 |