EXECUTIVE CUSTOM CONSTRUCTION, INC. | B= | C | 02/15/2023 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 7662333 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | B= | P | 02/06/2023 | letter of compliance for C 402.5 on file, pending other required inspections, building okay. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | BOBF | BOBF | | B= | P | 7653496 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | B= | P | 01/24/2023 | need letter of compliance for C 402.5 and complete other required inspections, rest of building okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | BOBF | BOBF | | B= | P | 7642804 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/20/2022 | office framing and restroom framing with hardlids okay / drywall install at rated wall okay per w477 / Reviewed Accessible Elements / | BOBF | BOBF | | BFR | P | 7616004 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/29/2022 | hat channel framing on interior for rated wall per W477 okay | BOBF | BOBF | | BFR | P | 7594588 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 05/11/2022 | engineer letter for structural steel welding and bolting on file | LONNYS | LONNYS | | BFR | P | 7371043 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BIN | P | 04/18/2022 | Roof insulation at standing seam roof OK | DAKOTAB | DAKOTAB | | BIN | P | 7342606 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/16/2022 | Furring channel and exterior gypsum at 1hr rated wall OK per W477 -- Need to attach all MEP contractors | DAKOTAB | DAKOTAB | | BFR | P | 7272629 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFN | P | 01/21/2022 | Engineer letter for foundation on file | DAKOTAB | DAKOTAB | | BFN | P | 7245840 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFT | C | 01/21/2022 | Engineer letter for footing on file | DAKOTAB | DAKOTAB | | BFT | C | 7245838 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFT | P | 01/18/2022 | Open hole on file -- 2400 PSF | DAKOTAB | DAKOTAB | | BFT | P | 7240855 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFI | P | 01/07/2022 | R10 installed | LONNYS | LONNYS | | BFI | P | 7232077 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFN | P | 01/07/2022 | Authorized 3rd party engineer inspection with all observation paperwork to follow / | LONNYS | LONNYS | | BFN | P | 7232076 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFT | P | 01/07/2022 | Authorized 3rd party engineer inspection with all observation paperwork to follow / | LONNYS | LONNYS | | BFT | P | 7232064 |
BIBLE ELECTRIC, INC. | E= | C | 01/17/2023 | | BRET | BRET | | E= | C | 7636427 |
BIBLE ELECTRIC, INC. | E= | R | 01/13/2023 | gfci protect all receptacles in garage bay areas including 30 amp , install disconnect switches on all heaters , center screw cannot be sole support for receptacles in industrial covers 50 amp pre-wire | BRET | BRET | | E= | R | 7634522 |
BIBLE ELECTRIC, INC. | E= | R | 01/13/2023 | gfci protect all receptacles in garage bay areas including 30 amp , install disconnect switches on all heaters , center screw cannot be sole support for receptacles in industrial covers 50 amp pre-wire | BRET | BRET | | E= | R | 7634523 |
BIBLE ELECTRIC, INC. | ER | P | 12/01/2022 | ufer is non irreversible type | RANDY | RANDY | | ER | P | 7598086 |
BIBLE ELECTRIC, INC. | ER | P | 11/30/2022 | wall except section of wall from ufer rebar to metal column , ufer not made at time of inspection | BRET | BRET | | ER | P | 7595730 |
BIBLE ELECTRIC, INC. | ES | C | 09/22/2022 | Commercial Service: 200 amp 3/w 120/208v----made to disconnect | RANDY | RANDY | | ES | C | 7526470 |
BIBLE ELECTRIC, INC. | ES | R | 09/19/2022 | Commercial Service: I am not seeing the splice on the service and unsure why. Was it approved? | RANDY | RANDY | | ES | R | 7520875 |
BIBLE ELECTRIC, INC. | ES | R | 08/24/2022 | service doesn't match plans need to have load to release meter | BRET | BRET | | ES | R | 7493866 |
BIBLE ELECTRIC, INC. | ESL | C | 04/13/2022 | | BRET | BRET | | ESL | C | 7336489 |
BIBLE ELECTRIC, INC. | ESL | R | 04/12/2022 | not ready min 18' of cover from top of slab in garage parking area | BRET | BRET | | ESL | R | 7334759 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 01/18/2023 | GAS FINAL----------------------------COMPLETE | TREVORH | TREVORH | | H= | C | 7638298 |
FRONTIER MECHANICAL SYSTEMS INC | H= | P | 01/05/2023 | FINAL PENDING CONTRACTOR REQUESTING FINAL INSPECTION / ALL GAS CONNECTIONS COMPLETE TO APPLIANCES< MEDIUM PRESSURE APPROVAL ON FILE< REGULATORS AND STENCILING IN PLACE / | WHITNEYH | WHITNEYH | | H= | P | 7626129 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | C | 01/05/2023 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES / APPROVED PLAN SPLICE ON FILE REFLECTING ADDED ELECTRIC WALL HEATER IN JANITOR ALCOVE AND REVISED EXHAUST DUCTING FOR EF-1 AND EF-2 / ELECTRIC WALL HEATERS TO BE INSPECTED BY ELECTRICAL INSPECTOR / MECHANICAL FINAL COMPLETE / | WHITNEYH | WHITNEYH | | H= | C | 7626076 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HC | C | 12/28/2022 | RELEASE 2 LB METER | WHITNEYH | WHITNEYH | | HC | C | 7621714 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HC | C | 12/28/2022 | RELEASE 2 LB METER | WHITNEYH | WHITNEYH | | HC | C | 7621715 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HV | C | 12/28/2022 | Horizontal venting of unit heaters completed as per page 18 of manufacturers installation instructions / Vent installation for all four units ok / Still need revised approved plans as per inspection notes 12/21/22 / | WHITNEYH | WHITNEYH | | HV | C | 7621464 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | P | 12/21/2022 | NEED REVISED APPROVED PLANS REFLECTING ADDED ELECTRIC UNIT HEATER IN JANITORS CLOSET WITH UPDATED EQUIPMENT SCHEDULE, SPLICE TO INCLUDE EXHAUST DUCTING FOR EF-1 AND EF-2 AS 6 INCH DUCTS HAVE BEEN WYED TOGETHER TERMINATING IN 10 INCH AT ROOF-TOP / HORIZONTALLY VENTED UNIT HEATERS ARE REQUIRED BY MANUFACTURER TO UTILIZE LISTED CATEGORY III VENT MATERIALS- SEE PAGE 14 OF MANUFACTURERS INSTALLATION MANUAL / --APPROVED SPLICE ON FILE FOR ADDED STORAGE ROOMS AND REMOVAL OF EXHAUST AND INTAKE LOUVERS - | WHITNEYH | WHITNEYH | | H= | P | 7618627 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | P | 12/21/2022 | Dayton unit heater installation manual received, see images / Mechanical splice on file / On-site inspection scheduled / | WHITNEYH | WHITNEYH | | H= | P | 7617480 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HSP | P | 12/02/2022 | INSPECTOR NOTED DURING GAS INSPECTION: 3 OFFICES HAVE BEEN FRAMED ON SOUTH EAST SIDE OF STORAGE, THESE ARE NOT ON PLANS / HOW ARE THE OFFICES BEING CONDITIONED? / QUESTIONING WHAT IS GOING ON WITH INTAKE AND EXHAUST LOUVERS DUE TO ADDED OFFICES / NEED REVISED APPROVED PLANS TO ADDRESS LISTED ITEMS IN ADDITION TO ITEMS NOTED FROM INSPECTION 11/16 / | WHITNEYH | WHITNEYH | | HSP | P | 7599071 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 12/02/2022 | MEDIUM PRESSURE GAS SYSTEM PER PLANS / WILL NEED 2 LB APPROVAL LETTER FROM GAS PURVEYOR BY FINAL / MEDIUM PRESSURE STENCILING AND REGULATORS INSTALLED / GAS SYSTEM INSTALLED AS PER PLANS / | WHITNEYH | WHITNEYH | | HI | C | 7599048 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HD | R | 11/16/2022 | NEED REVISED APPROVED PLANS REFLECTING BUILDING DESIGN CHANGES / PER PROJECT MANAGER OFFICES WILL BE ADDED INSIDE THIS FACILITY, PLANS DO NOT REFLECT ANY OFFICES, FRAMING AND BATHROOM LOCATION ALTERED FROM APPROVED PLAN SET / BATHROOM EXHAUST DUCTING REFLECTS 6 INCH DEDICATED RUNS FOR EACH FAN, EXHAUST DUCTING JOINED TOGETHER INTO 10 INCH DIAMETER DUCT TO ROOF PENETRATION / UNIT HEATERS ON APPROVED PLAN SET ARE REZNOR 105K BTU UNITS, DAYTON UNITS INSTALLED (UNABLE TO VERIFY BTU LISTING AS NO ACCESS COULD BE PROVIDED / NEED I NSTALLATION INSTRUCTIONS FOR UNIT HEATERS TO VERIFY VENT INSTALLATION / NO EXHAUST OR INTAKE LOUVERS INSTALLED / STOPPED INSPECTION / | WHITNEYH | WHITNEYH | | HD | R | 7585679 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 01/20/2023 | ok | TREBORB | TREBORB | | P= | C | 7640539 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 01/18/2023 | no hot water / need high/low drinking fountain or a drinking fountain with bottle filler and AMM from plan review / rest ok | TREBORB | TREBORB | | P= | P | 7638134 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 01/18/2023 | ok | TREBORB | TREBORB | | PTO | C | 7638133 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 01/18/2023 | ok | TREBORB | TREBORB | | PB | C | 7638126 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/02/2022 | NEED PLAN SPLICE FOR ALL PLUMBING LAYOUT CHANGES AND FIXTURE CHANGES / REST OK | TREBORB | TREBORB | | PTO | P | 7598899 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 04/29/2022 | Need plan splice for new plumbing layout, and lift station. Rest ok. | TREBORB | TREBORB | | PB | P | 7358214 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 04/26/2022 | SEWER STUB IN ONLY: GAUGE NOT HOLDING; LIFT STATION IS NOT ON PLANS; WILL NEED TO SEE CIVIL/PLUMBING PLANS SPLICED AND VTR FOR LIFT STATION; PLEASE POST ADDRESS ON JOB SITES | TREBORB | TREBORB | | PB | P | 7352720 |
BIBLE ELECTRIC, INC. | XES | P | 01/04/2023 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: Delta 4 revision. Added EWH to janitor's closet. | DANIELG | DANIELG | | XES | P | 7624727 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | T | 01/04/2023 | PAID (REC#1925867): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Added electric heat | JUSTINC | JUSTINC | | XMS | T | 7624672 |
BIBLE ELECTRIC, INC. | XES | P | 12/15/2022 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: Delta 3. Revised one-line, panel schedules, and floor plan. | DANIELG | DANIELG | | XES | P | 7612715 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | P | 12/15/2022 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 2 revisions: Adjusted sheet P0.1 and P1.1. | SHANEN | SHANEN | | XPS | P | 7612708 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | P | 12/15/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised backgrounds, layout, and ventilation | JUSTINC | JUSTINC | | XMS | P | 7612622 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | P | 12/05/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout and backgrounds revised | JUSTINC | JUSTINC | | XMS | P | 7599786 |
BIBLE ELECTRIC, INC. | XES | P | 11/29/2022 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: Delta 3. As built. | DANIELG | DANIELG | | XES | P | 7595354 |
BIBLE ELECTRIC, INC. | XES | T | 09/15/2022 | PAID (REC#1899779): PLAN SPLICE FEE: $50 by: DANIELG for Electrical: Delta revision 3. As built. | DANIELG | DANIELG | | XES | T | 7517325 |
BIBLE ELECTRIC, INC. | XES | P | 08/12/2022 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised for background changes. | BERTHA | BERTHA | | XES | P | 7481878 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | XBS | T | 08/11/2022 | PAID (REC#1892747): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised floor plan, occupancies, occupant load. | SHELLEY | SHELLEY | | XBS | T | 7479533 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | XES | T | 12/28/2021 | PAID (REC#1833925): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revised one line | SHELBY | SHELBY | | XES | T | 7222573 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | XMS | P | 12/28/2021 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised gas to (1) meter | JUSTINC | JUSTINC | | XMS | P | 7222482 |