CONSTRUCTION CONSULTING SOLUTIONS, INC. | B= | C | 08/24/2023 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 7836391 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | B= | P | 06/22/2023 | building final OK pending zoning. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | LONNYS | LONNYS | | B= | P | 7779104 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BFR | C | 06/22/2023 | storage unit framing OK | LONNYS | LONNYS | | BFR | C | 7779103 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BE | P | 01/10/2023 | | JACKIEP | JACKIEP | | BE | P | 7630897 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | BE | L | 08/19/2022 | Renewed online for Half Fee at Aug 19 2022 9:18AM (RECEIPT #: 1892871) | WEBSITE | WEBSITE | | BE | L | 7488607 |
ENCORE ELECTRIC, INC. | E= | C | 03/16/2023 | Corrections made / Rest of pics sent to phone - Ok | BRETC | BRETC | | E= | C | 7688935 |
ENCORE ELECTRIC, INC. | E= | P | 03/13/2023 | All 3 RTU's (40 amp brk's with 45 amp fused at disconnect) will need Plastic bushing on GRC nipple, strap flex, Pull hot color factory blue, cannot re-identify white conductor, need liquidtite inside RTU chase, cannot free air THHN / Label on top of transformer - Do Not Stack, need to bond water in serving area of transformer / -------------------Panel LP1A and transformer - Ok | BRETC | BRETC | | E= | P | 7685367 |
ADVANTAGE HEATING AND COOLING | H= | C | 03/21/2023 | CORRECTIONS MADE | MARKB | MARKB | | H= | C | 7694028 |
ALLRIGHT PLUMBING & HEATING | H= | C | 03/13/2023 | REGULATORS AND LABELS COMPLETE. | MARKB | MARKB | | H= | C | 7685766 |
ALLRIGHT PLUMBING & HEATING | HC | C | 03/13/2023 | ADDING 3 RTU'S TO METER PER PLAN | MARKB | MARKB | | HC | C | 7685764 |
ALLRIGHT PLUMBING & HEATING | HI | C | 03/13/2023 | --EXISTING 2 PSI SERVICE FOR BUILDING 10 PSI PRESSURE TEST AND PIPING PER PLAN. | MARKB | MARKB | | HI | C | 7685763 |
ADVANTAGE HEATING AND COOLING | HD | P | 03/07/2023 | 2ND FLOOR: FOR FINAL - Need gas and electrical contractors attached to permit. RTU'S over 2000 cfm require smoke duct detectors. New RTU'S lack condensate traps and secondary protection. THERMOSTATS, EXHAUST FAN AND DUCT DROPS ARE COMPLETE | MARKB | MARKB | | HD | P | 7680708 |
ALLRIGHT PLUMBING & HEATING | P= | C | 01/17/2023 | letter for pvc in images | JOSEPHD | JOSEPHD | | P= | C | 7635561 |
ALLRIGHT PLUMBING & HEATING | PTO | C | 01/17/2023 | | JOSEPHD | JOSEPHD | | PTO | C | 7635559 |
ALLRIGHT PLUMBING & HEATING | PTO | P | 10/05/2022 | need engineer letter for pvc, rest ok, water heater ok note: at final need to see dwv reconnected can upload image | JOSEPHD | JOSEPHD | | PTO | P | 7540005 |
ADVANTAGE HEATING AND COOLING | XMS | T | 03/02/2023 | PAID (REC#1936871) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised to show exhaust, existing RTU's and gas | JUSTINC | JUSTINC | | XMS | T | 7675457 |
CONSTRUCTION CONSULTING SOLUTIONS, INC. | XES | T | 03/01/2023 | PAID (REC#1936872) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise one line and panel schedule. | SHELBY | SHELBY | | XES | T | 7674116 |
ADVANTAGE HEATING AND COOLING | XMS | T | 01/23/2023 | PAID (REC#1936871) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised layout, schedules, gas | JUSTINC | JUSTINC | | XMS | T | 7641579 |