COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BSP | R | 02/23/2024 | Field cancelled by contractor | MATTHEWA | MATTHEWA | | BSP | R | 8003933 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | R | 02/22/2024 | Need to complete foundation inspections. / Building final okay. | MATTHEWA | MATTHEWA | | B= | R | 8003332 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | P | 09/05/2023 | C106 luggage room frame okay pending other rough inspections. | ERAMIREZ | ERAMIREZ | | BFR | P | 7847191 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | P | 07/28/2023 | Please update and splice plans to reflect room between work room and laundry room to resist the passage of smoke per 509.4.2 of the IBC. Framing okay for new opening in work room c120 | ERAMIREZ | ERAMIREZ | | BFR | P | 7811686 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BSP | P | 07/26/2023 | Reviewed framing requirements for new opening in work room. | ERAMIREZ | ERAMIREZ | | BSP | P | 7809111 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | P | 05/30/2023 | Light gauge steel framing okay pending other rough inspections at C104A area by front desk. | ERAMIREZ | ERAMIREZ | | BFR | P | 7757702 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | P | 12/16/2022 | Frame okay at meeting room pending other rough inspections. / | ERAMIREZ | ERAMIREZ | | BFR | P | 7614123 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BIN | C | 08/30/2022 | | ERAMIREZ | ERAMIREZ | | BIN | C | 7501273 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | P | 08/04/2022 | Framing at front covered entry OK pending splice in progress / Viewed updated documents on site | ADAML | ADAML | | BFR | P | 7471580 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | P | 05/02/2022 | West bar area frame only okay with completed required inspections. | NATHAN | NATHAN | | BFR | P | 7359679 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFI | C | 03/03/2022 | Provide open hole. / R10 installed / | ERAMIREZ | ERAMIREZ | | BFI | C | 7289825 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFN | P | 03/02/2022 | Provide open hole. / Observed forms and rebar reinforcement per foundation design on file. / | ERAMIREZ | ERAMIREZ | | BFN | P | 7288003 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B16 | P | 03/01/2022 | On site consultation only / No inspections performed | ADAML | ADAML | | B16 | P | 7285664 |
EL PASO ELECTRIC, LLC. | E= | C | 02/15/2024 | | JOHNN | JOHNN | | E= | C | 7996734 |
EL PASO ELECTRIC, LLC. | E= | R | 02/14/2024 | 2 receps within 6' of sink need gfci/ rest is ok, | JOHNN | JOHNN | | E= | R | 7995452 |
EL PASO ELECTRIC, LLC. | E= | P | 09/14/2023 | need cb lockout for luggage rm heater/ verify and label heater disco in new vestibule/ need to schedule bar inspection for 1 call in morning, please add comment in inspection request/ | JOHNN | JOHNN | | E= | P | 7856958 |
EL PASO ELECTRIC, LLC. | ER | P | 09/05/2023 | walls,Rm C106, wall heater and switch. | JOHNN | JOHNN | | ER | P | 7846816 |
EL PASO ELECTRIC, LLC. | ER | P | 05/31/2023 | wall in lobby, | JOHNN | JOHNN | | ER | P | 7758236 |
EL PASO ELECTRIC, LLC. | ER | P | 12/16/2022 | J-box in ceiling will need to be accessible, cannot reach through plumbing access, j-box will need its own access /-------------- Meeting room wall demo - relocated switch | BRETC | BRETC | | ER | P | 7613452 |
EL PASO ELECTRIC, LLC. | ER | P | 08/29/2022 | new vestibule walls and lid, | JOHNN | JOHNN | | ER | P | 7499005 |
EL PASO ELECTRIC, LLC. | ER | P | 04/15/2022 | walls except south wall, need to add 3 gang switch box. | JOHNN | JOHNN | | ER | P | 7340281 |
KENT SHEET METAL, INC | H= | C | 01/19/2024 | MECHANICAL FINAL COMPLETE | BRANDONL | BRANDONL | | H= | C | 7972183 |
KENT SHEET METAL, INC | H= | P | 01/16/2024 | ***UPDATED ON 1/19/24 BY BL.*** AFTER REVIEW WITH PREVIOUS INSPECTOR, FINAL PENDING: CONTRACTOR TO UPDATE SCOPE OF WORK TO REFLECT 2 COMMERCIAL DUCTS AND 2 UNIT HEATERS/ DRYER EXHAUST DUCT OK/ EXHAUST FAN PRE-EXISTING | BRANDONL | BRANDONL | | H= | P | 7968229 |
DAVIS GAS SHOP INC | H= | C | 01/12/2024 | GAS FINAL COMPLETE | BRANDONL | BRANDONL | | H= | C | 7967553 |
DAVIS GAS SHOP INC | HC | C | 01/12/2024 | ADDING 165 MBH TO THE EXISTING METER FOR NEW DRYER/ INSIDE TIE | BRANDONL | BRANDONL | | HC | C | 7967546 |
DAVIS GAS SHOP INC | HI | C | 01/12/2024 | GAS INSTALLED PER PLAN, TIFFED ALL NEW CONNECTIONS DOWN TO NEW DRYER (165MBH) | BRANDONL | BRANDONL | | HI | C | 7967543 |
KENT SHEET METAL, INC | HD | P | 01/12/2024 | WILL REVIEW WITH PREVIOUS INSPECTOR AND UPDATE NOTES | BRANDONL | BRANDONL | | HD | P | 7967531 |
KENT SHEET METAL, INC | HD | P | 07/25/2023 | NOTE ADDED 7/28/23: EXHAUST FAN AND DUCT INSTALLED PER PLAN OK TO COVER. FURTHER RESEARCH REQUIRED FOR EXHAUST FAN IN KITCHEN. --CONTRACTOR NEED TO CORRECT PERMIT SCOPE: Should be 2 commercial ducts and 1 exhaust fan. --NEED GAS PIPING FOR DRYER SHOWN ON PLANS AND CONTRACTOR ATTACHED TO PERMIT. Need dryer install instructions for inspection - has 14' of pipe and 2 90's installed. | MARKB | MARKB | | HD | P | 7807808 |
KENT SHEET METAL, INC | HE | P | 02/02/2023 | | ASHLEYL | ASHLEYL | | HE | P | 7651452 |
DRUMMOND PLUMBING LLC | P= | C | 08/09/2023 | Note: Washer Box & H20 OK On Splice | TRAVISR | TRAVISR | | P= | C | 7822051 |
DRUMMOND PLUMBING LLC | PE | P | 02/14/2023 | | AMYP | AMYP | | PE | P | 7661054 |
DRUMMOND PLUMBING LLC | PRD | C | 04/08/2022 | Note: / 3" Roof Drain South Of Lobby Entrance OK | TRAVISR | TRAVISR | | PRD | C | 7331339 |
DRUMMOND PLUMBING LLC | PTO | C | 04/08/2022 | Note: Plans Need To Be Revised As Previously Mentioned / AAV @ Bar Sink | TRAVISR | TRAVISR | | PTO | C | 7331333 |
DRUMMOND PLUMBING LLC | PB | P | 03/24/2022 | ((( NEED PLANS REVISED TO SHOW 3" BRANCH AFTER TIE-IN AND POINT OF CONNECTION IN BAR AREA INSTEAD OF RESTROOM ))) -- NOTE: AT PTO CHECK FOR EOL 2" C/O AT HAND SINK | LEE | LEE | | PB | P | 7314135 |
DRUMMOND PLUMBING LLC | PB | P | 03/22/2022 | Consultation with contractor | CODYP | CODYP | | PB | P | 7309958 |
EL PASO ELECTRIC, LLC. | XES | P | 12/27/2023 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: As built changes. | DANIELG | DANIELG | | XES | P | 7954049 |
KENT SHEET METAL, INC | XMS | T | 12/27/2023 | PAID (REC#2019736) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Added gas line | DALEH | DALEH | | XMS | T | 7954000 |
EL PASO ELECTRIC, LLC. | XES | P | 08/19/2022 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised for washer and dryer. | BERTHA | BERTHA | | XES | P | 7488565 |
DRUMMOND PLUMBING LLC | XPS | P | 08/19/2022 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 2 revisions: Adjusted sheet P1.0 and P2.0. | SHANEN | SHANEN | | XPS | P | 7488304 |
KENT SHEET METAL, INC | XMS | P | 08/18/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised to add washer and commercial dryer to scope | JUSTINC | JUSTINC | | XMS | P | 7488171 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | XBS | T | 08/18/2022 | PAID (REC#1895363) PLAN SPLICE FEE: $50 by: DANM for Construction: Revise entry awning and adjust existing laundry room | DANM | DANM | | XBS | T | 7488162 |