HENSEL PHELPS CONSTRUCTION CO | B= | C | 09/12/2022 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 7512908 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 08/24/2022 | . Additional Inspections Required (computer generated): External Agency Inspection FHZ= by FIREDEPT is not Completed yet. | LONNYS | LONNYS | | B= | P | 7494547 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 06/24/2022 | STAFF LOUNGE VERTICAL SHAFT LINER AND SMOKE BARRIER WALL GYP ATTACHMENT EXTERIOR SIDE / observed Georgia Pacific shaft liner and framing - need to splice in UL for as built condition for smoke barrier continuity from horizontal to vertical assembly - provide fire stop detail for all through penetrations / gyp attachment at exterior side of lounge OK per UL U465 - still need to inspect penetration when ready | LONNYS | LONNYS | | BSP | P | 7424180 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 06/21/2022 | GYP ATTACHMENT AND ABOVE CEILING FIRESTOP INSPECTION AG-3 CORRIDOR HORIZONTAL AREA AND STERILE STORAGE LID // pending splice of correct listing as american gyp is not per listing UL I506 or provide EJ / observed 2nd and 3rd layer gyp fastening 6" OC to 6" light gauge steel framing 16" OC / above ceiling fire stop OK | LONNYS | LONNYS | | BSP | P | 7419609 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 06/17/2022 | GYP ATTACHMENT INSPECTION AG-3 CORRIDOR HORIZONTAL AREA AND STERILE STORAGE LID // need to splice in correct listing as american gyp is not per listing UL I506 or provide EJ / 1st layer fastening observed 6" OC to 6" light gauge steel framing 16" OC | LONNYS | LONNYS | | BSP | P | 7416335 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 06/14/2022 | MISC. FRAMING FOR PHASE 2 // need to attach mech permit / pending other required inspections / need to splice in rated horizontal assembly for smoke barrier continuity locations - observed 6" metal stud horizontal framing in sterile storage room and hall adjacent to woman's locker / interior light gauge wall framing OK at scope wash clean room and AG-3 hall at sterile storage | LONNYS | LONNYS | | BFR | P | 7410922 |
ENCORE ELECTRIC, INC. | E= | C | 07/15/2022 | | RANDY | RANDY | | E= | C | 7447900 |
ENCORE ELECTRIC, INC. | E= | P | 07/14/2022 | see notes | RANDY | RANDY | | E= | P | 7445950 |
ENCORE ELECTRIC, INC. | ER | P | 07/14/2022 | fields cancelled | RANDY | RANDY | | ER | P | 7445949 |
ENCORE ELECTRIC, INC. | ER | P | 06/10/2022 | 2 rooms in area 1 A ok | RANDY | RANDY | | ER | P | 7407991 |
MECHONE, INC. | H= | C | 08/24/2022 | TEST AND BALANCE REPORT RECEIVED PHASE 2 MECHANICAL FINAL--------- COMPLETE. | TREVORH | TREVORH | | H= | C | 7493555 |
MECHONE, INC. | HD | P | 08/15/2022 | PHASE 2 / M 2.01 AND M2.02 (BDA 340-341) PLAN SPLICE DATED 6-22-22 /AT STAFF LOUNGE NEED 8 X 8 RETURN AIR SHOWN ON PLANS PENIETRATING RATED WALL AT NEW LOCATION DENOTED BY M27 THE WALL IS NO LONGER RATED AT THE ORIGINAL LOCATION/ NEW 64 X 26 ELBOW INSTALLED IN OR FOR RTU 301 OK , OK TO WRAP/ WILL NEED TO INSPECT DAMPER FRAMING AND ANNULAR SPACING WHEN NEW FIRE SMOKE DAMPER IS INSTALLED FOR RTU-301/ SUPPLY AND RETURN DUCT COMPLETE / REGISTERS AND DIFFUSERS INSTALLED / | TREVORH | TREVORH | | HD | P | 7482721 |
MECHONE, INC. | HD | P | 07/08/2022 | PHASE 2 / M 2.01 AND M2.02 (BDA 340-341) / SUPPLY AND RETURN DUCT COMPLETE / REGISTERS AND DIFFUSERS INSTALLED / | WHITNEYH | WHITNEYH | | HD | P | 7439578 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 08/23/2022 | | LEE | LEE | | P= | C | 7492296 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 08/23/2022 | | LEE | LEE | | PTO | C | 7492287 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/12/2022 | AREA 1-B - ROOM AG-300 SCOPE WASH BACK-FLOW OK ((( NEED TEMPERING VALVE ADDED TO P0.02 ISO ))) | LEE | LEE | | PTO | P | 7442578 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/01/2022 | FOR 3" FLOOR SINK SCOPE WASH ROOM - AG300 OK | LEE | LEE | | PB | P | 7395214 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 08/09/2022 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 10 revisions: Adjusted sheet P0.02, P2.04 and P2.04P2. | SHANEN | SHANEN | | XPS | P | 7475938 |
MECHONE, INC. | XMS | P | 08/09/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | P | 7475797 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 08/09/2022 | PAID (REC#1890375): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Ceiling details. | SHELLEY | SHELLEY | | XBS | T | 7475646 |
ENCORE ELECTRIC, INC. | XES | P | 06/22/2022 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power plans. | BERTHA | BERTHA | | XES | P | 7421171 |
HENSEL PHELPS CONSTRUCTION CO | XMS | P | 06/22/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Exhaust revised | JUSTINC | JUSTINC | | XMS | P | 7420666 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 06/22/2022 | PAID (REC#1878065): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 9 revisions: Adjusted sheet PD1.01, PD2.01, PD2.03, P1.01, P2.01 and P2.03, | SHANEN | SHANEN | | XPS | T | 7420318 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 06/22/2022 | PAID (REC#1877226): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised smoke barrier @ room AG308a | LBENNETT | LBENNETT | | XBS | T | 7419960 |
ENCORE ELECTRIC, INC. | XES | P | 06/15/2022 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power plan, revised panel schedule. | BERTHA | BERTHA | | XES | P | 7411935 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 06/14/2022 | PAID (REC#1875699): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Layout revisions | LBENNETT | LBENNETT | | XBS | T | 7410165 |