HENSEL PHELPS CONSTRUCTION CO | B= | C | 12/08/2023 | All finals completed, Above ceiling verified and work completed. | NATHAN | NATHAN | | B= | C | 7940170 |
HENSEL PHELPS CONSTRUCTION CO | BFR | C | 12/08/2023 | Splice approved. | NATHAN | NATHAN | | BFR | C | 7940161 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 07/20/2023 | mop closet in basement okay | BOBF | BOBF | | BFR | P | 7804128 |
HENSEL PHELPS CONSTRUCTION CO | BE | P | 04/21/2023 | | MATTHEWM | MATTHEWM | | BE | P | 7724190 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 08/22/2022 | 1ST AND 2ND LAYERS HORIZONTAL ASSEMBLY IN STAFF LOUNGE -- pending updated horizontal assembly listing observed 2 layers american 5/8" fastening 6" OC | LONNYS | LONNYS | | BSP | P | 7491347 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 08/19/2022 | 1st-3rd layer gyp attachment AG 204 OK per UL I506 / pending splice for updated listing at horizontal shaft assembly in break room - observed 1" GP shaft liner and framing | LONNYS | LONNYS | | BSP | P | 7489823 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 08/17/2022 | GYP ATTACHMENT AND FIRE STOP IN ISOLATION, PRE AND POST ISOLATION, STAFF LOUNGE // pending other required inspections / updated rated assemblies spliced / 2nd and 3rd layers of gyp attachment OK at horizontal assemblies per UL I506 / fire stop at all penetrations in vertical assembly in staff lounge OK listing reviewed on site | LONNYS | LONNYS | | BSP | P | 7486531 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 08/10/2022 | GYP ATTACHMENT AND FIRE STOP // pending other required inspections / still need updated plan spices for smoke barrier horizontal assembly continuity locations and updated UL listings / provide fire stop listing for multi penetration location and all opening over 4" / observed 1st layer of horizontal gyp attachment in staff lounge, pre and post 23, and clean/meds room // above ceiling firestop OK in isolation and PAT rooms | LONNYS | LONNYS | | BSP | P | 7478396 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 08/04/2022 | RATED WALL ASSEMBLY GYP ATTACHMENT INSPECTION // pending other required inspections and splices for horizontal assemblies / gyp attachment OK at soiled work room - clean/meds room - consult room / still need to inspect all penetrations and horizontal assemblies | LONNYS | LONNYS | | BSP | P | 7471673 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 07/08/2022 | Still need to inspect horizontal assembly framing at fire barrier -- Rest of interior light gauge frame OK pending other roughs -- Reviewed Accessible elements | DAKOTAB | DAKOTAB | | BFR | P | 7440329 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 07/01/2022 | above ceiling in staff lounge meeting with mech inspector to discuss penetrations and ducts | LONNYS | LONNYS | | BSP | P | 7433135 |
ENCORE ELECTRIC, INC. | E= | C | 08/22/2023 | | RANDY | RANDY | | E= | C | 7833005 |
ENCORE ELECTRIC, INC. | ER | P | 07/18/2023 | single wall with rough in for 2 devices | RANDY | RANDY | | ER | P | 7801190 |
ENCORE ELECTRIC, INC. | EE | L | 07/17/2023 | Renewed for No Fee at 7/17/2023 9:55:03 AM | DEAN | DEAN | | EE | L | 7799268 |
ENCORE ELECTRIC, INC. | E= | P | 10/06/2022 | PACU ok --------Compete changed to partial by Dean to allow another inspection for a splice that was approved after final for additional recept and light in closet | RANDY | RANDY | | E= | P | 7541559 |
ENCORE ELECTRIC, INC. | ER | P | 09/22/2022 | PACU drop ceilings ok | RANDY | RANDY | | ER | P | 7526050 |
ENCORE ELECTRIC, INC. | ER | P | 08/23/2022 | hard lids for ISO and Dirty room | RANDY | RANDY | | ER | P | 7492365 |
ENCORE ELECTRIC, INC. | ER | P | 08/18/2022 | 2 bathroom ceilings | RANDY | RANDY | | ER | P | 7487682 |
ENCORE ELECTRIC, INC. | ER | P | 08/15/2022 | lounge walls and nurse station underground | RANDY | RANDY | | ER | P | 7482345 |
ENCORE ELECTRIC, INC. | ER | P | 07/27/2022 | PACU- Garden level- Phase 3- HEADWALLS ONLY - Ok | BRETC | BRETC | | ER | P | 7461462 |
ENCORE ELECTRIC, INC. | ER | P | 07/14/2022 | PACU walls FA | RANDY | RANDY | | ER | P | 7445875 |
ENCORE ELECTRIC, INC. | ER | P | 07/13/2022 | PACU area minus headwalls and breakroom | RANDY | RANDY | | ER | P | 7445233 |
MECHONE, INC. | H= | C | 11/06/2023 | ENGINEERS LETTER APPROVING THE TEST AND BALANCE REPORT SEE IMAGES. | TREVORH | TREVORH | | H= | C | 7909272 |
MECHONE, INC. | HD | C | 07/18/2023 | DUCTING RAN PER PLAN SPLICE, EXHAUST RAN TO NEW MOP SINK ROOM AG 18 E AND THE RE CONNECTED EXHAUST DUCTING FOR REST ROOM AG 198 OK, TEST AND BALANCE REPORT TO INCLUDE ALL EXHAUST WHEN READY. | TREVORH | TREVORH | | HD | C | 7801235 |
MECHONE, INC. | H= | P | 02/09/2023 | PRELIMINARY TEST AND BALANCE REPORT RECEIVED. MECHANICAL FINAL---------------- PENDING COMPLETE. pending splice | TREVORH | TREVORH | | H= | P | 7657558 |
MECHONE, INC. | HD | P | 10/26/2022 | MECHANICAL FINAL PENDING----------------TEST AND BALANCE REPORT EXHAUST FAN COMPLETE, THERMOSTATS COMPLETE. | TREVORH | TREVORH | | HD | P | 7562889 |
MECHONE, INC. | H= | P | 09/23/2022 | (PHASE 3 B) ALL FLEX AND REGISTERS COMPLETE, WILL NEED TO SEE THERMOSTATS INSTALLED OK TO ATTACH PICTURE. AT NEXT INSPECTION REQUEST WILL NEED ACCESS TO ROOF FOR WORK INCLUDED IN THIS PHASE, NEED TO SEE TEST AND BALANCE REPORT AT FINAL. | TREVORH | TREVORH | | H= | P | 7527815 |
MECHONE, INC. | HD | P | 07/27/2022 | SUPPLY SERVING REST ROOM NEAREST THE ISOLATION TLT IS SHOWN BEING FED BY THE 12 X 12 EXHAUST DUCT , CONTRACTOR HAS TAKEN THE AIR FROM THE NEAREST VAV (ENGINEER TO ADDRESS) M2.01 (BDA 333) SUPPLY TRUNK LINES AND LATERAL RUN OUTS OK, OK TO WRAP / EXHAUST DUCTING OK / STILL NEED TO SEE COMPLETED DUCT AT SOILED WORK ROOM AND ADJACENT REST ROOM, NEED TO SEE 8 X8 RETURN AIR TIE IN AT STAFF LOUNGE | TREVORH | TREVORH | | HD | P | 7461040 |
MECHONE, INC. | HD | P | 07/26/2022 | REQUIRED NOTE UPDATE ,WILL UPDATE IN THE A.M. DUE TO LACK OF INTERNET SIGNAL. | TREVORH | TREVORH | | HD | P | 7459746 |
MECHONE, INC. | HD | P | 07/08/2022 | PHASE 3 / M2.01 (BDA 333) SUPPLY TRUNK LINES AND LATERAL RUN OUTS OK, OK TO WRAP / EXHAUST DUCTING OK / | WHITNEYH | WHITNEYH | | HD | P | 7439592 |
MECHONE, INC. | HD | P | 07/01/2022 | EXISTING SUPPLY AND RETURN MAIN TRUNK LINES ABOVE NEW RATED WALL/CEILING AT PRE AND POST 21 AND 22 OKAY . | NANCY | NANCY | | HD | P | 7433269 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 08/08/2023 | | TAYLOR | TAYLOR | | P= | C | 7820579 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 07/19/2023 | mop sink complete, revised plans ok. | TAYLOR | TAYLOR | | PTO | C | 7802557 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 07/13/2023 | INSPECTION FOR ONE MOP SINK / VENT -- NEED PLANS TO REFLECT NEW SINK | LEE | LEE | | PB | C | 7796694 |
OLSON PLUMBING & HEATING COMPANY | PE | L | 07/12/2023 | Renewed for No Fee at 7/12/2023 4:07:47 PM | JOEL | JOEL | | PE | L | 7796431 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 11/11/2022 | Joel changed to partial to allow for splice and inspection for added mop sink | LEE | LEE | | P= | P | 7580309 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 11/10/2022 | NEED PERMIT DETAIL FIXTURE COUNT REVISED - SUBTRACT SHOWERS / TUBS, ADD TOILETS ETC -- ALL OTHER OK | LEE | LEE | | P= | P | 7580027 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/31/2022 | ROOM # AG - 207 - DWV AND H20 OK -- CONSULTATION ON DBL COMPARTMENT SINK WITH LIFT ATTACHED (PHASE -1 PERMIT ) | LEE | LEE | | PTO | P | 7567640 |
OLSON PLUMBING & HEATING COMPANY | P= | P | 10/14/2022 | rooms 202,203,203a,204,205,205b,198 ok (phase 3) | JOSEPHD | JOSEPHD | | P= | P | 7550926 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/21/2022 | DWV AND H20 COMPLETE IN PREVIOUS INSPECTED AREAS - AG 206, 202, 204, 203, 205 -- STILL NEED FLANGES IN RESTROOMS 198, 203, STAFF RESTROOM | LEE | LEE | | PTO | P | 7455305 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/15/2022 | ((( AG-207 DWV ONLY ( COMPLETION ON ANOTHER PHASE ))) -- AG-206 OK -- AG-202 &204 DWV AND H20 IN WALL ONLY -- 198 & 203 RESTROOMS DWV WALL ONLY H20 OK -- AG-203 DWV & H20 OK -- AG-205 STAFF SINK AND RESTROOM OK -- NEED CLOSET FLANGES, SCREW PROTECTION AND INSULATION | LEE | LEE | | PTO | P | 7447801 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/30/2022 | RESTROOMS AG-198 , 203A AND 205B OK -- SINKS AG-205, 203 AND HALLWAY SINK OK | LEE | LEE | | PB | P | 7431092 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/23/2022 | PHASE 3 -- SINKS IN AG-206, HALLWAY SINK AND W/C / LAV AG-207 OK | LEE | LEE | | PB | P | 7422175 |
OLSON PLUMBING & HEATING COMPANY | PB | P | 06/21/2022 | sinks in AG191 and AG189 tested and sized per plan, need plans to reflect new location of 2" drain from floor above | JOSEPHD | JOSEPHD | | PB | P | 7419119 |
MECHONE, INC. | XMS | T | 12/29/2022 | PAID (REC#1923541): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revised | JUSTINC | JUSTINC | | XMS | T | 7621948 |
ENCORE ELECTRIC, INC. | XES | T | 12/21/2022 | PAID (REC#1928871): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised Alcove AG-18e - power and lighting. | BERTHA | BERTHA | | XES | T | 7618696 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 12/21/2022 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 14 revisions: Adjusted sheet P1.01, P2.01 and P2.03. | SHANEN | SHANEN | | XPS | P | 7618167 |
MECHONE, INC. | XMS | P | 12/21/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | P | 7617911 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 12/21/2022 | PAID (REC#1922468): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised card reader/auto opener in Room AG201 and shelving in AG-18e. | SHELLEY | SHELLEY | | XBS | T | 7617851 |
ENCORE ELECTRIC, INC. | XES | P | 12/20/2022 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added junction box. | BERTHA | BERTHA | | XES | P | 7616585 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 12/12/2022 | PAID (REC#1920545): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Minor floor plan revisions, finishes | SHELLEY | SHELLEY | | XBS | T | 7607497 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 12/08/2022 | PAID (REC#1937501): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Clouded revisions only: Adjusted sheet P1.01, P2.01 and P2.03. | SHANEN | SHANEN | | XPS | T | 7604750 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 10/04/2022 | PAID (REC#1904712): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised floor plan and details. | SHELLEY | SHELLEY | | XBS | T | 7539261 |
ENCORE ELECTRIC, INC. | XES | P | 09/17/2022 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Lighting revisions | SHELBY | SHELBY | | XES | P | 7520652 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 09/15/2022 | PAID (REC#1906991): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Clouded revisions only: Adjusted sheet P3.01. | SHANEN | SHANEN | | XPS | T | 7518638 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 08/05/2022 | PAID (REC#1889642): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Updated equipment | SHELLEY | SHELLEY | | XBS | T | 7473055 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 06/08/2022 | PAID (REC#1875699): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Minor layout revisions | LBENNETT | LBENNETT | | XBS | T | 7404359 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 05/27/2022 | PAID (REC#1872894): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Rated soffit @ staff lounge/toilet, layout revisions | LBENNETT | LBENNETT | | XBS | T | 7392930 |
ENCORE ELECTRIC, INC. | XES | P | 05/23/2022 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | P | 7386234 |
HENSEL PHELPS CONSTRUCTION CO | XPS | T | 05/23/2022 | PAID (REC#1872894): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 8 revisions: Adjusted sheet PD2.03 and P2.03. | SHANEN | SHANEN | | XPS | T | 7385153 |
HENSEL PHELPS CONSTRUCTION CO | XMS | P | 05/20/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 7384705 |