HENSEL PHELPS CONSTRUCTION CO | B= | C | 02/10/2023 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 7658778 |
HENSEL PHELPS CONSTRUCTION CO | B= | P | 01/20/2023 | building final OK pending other required inspections. Additional Inspections Required (computer generated): External Agency Inspection FHZ= by FIREDEPT is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, MECHONE, INC. Mechanical Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7640629 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 11/16/2022 | final drywall install per I506 in Operating Rooms 9 and 10 okay | BOBF | BOBF | | BFR | P | 7585850 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 11/15/2022 | 1st and start of 2nd layer drywall install per I 506 on OR rooms 9 and 10 okay | BOBF | BOBF | | BFR | P | 7583855 |
HENSEL PHELPS CONSTRUCTION CO | BFR | R | 11/02/2022 | field cancelled per site rep Guy, no inspection required for closet grid | LONNYS | LONNYS | | BFR | R | 7569946 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 11/01/2022 | OP-9 AND OR-10 FIRE BARRIER GYP ATTACHMENT / attachment OK per UL U465 / above ceiling penetration smoke and fire stop OK both rooms | LONNYS | LONNYS | | BFR | P | 7568797 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 10/28/2022 | OR 10 soffit gyp attachment -- horizontal assembly 2nd and 3rd payers OK per UL I505 FIRE STOP AT ALL PENETRATIONS -- above ceiling fire stop OK both ORs all walls | LONNYS | LONNYS | | BFR | P | 7565762 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 10/27/2022 | first layer of gyp attachment at horizontal assembly OR- 10 OK per UL I505 | LONNYS | LONNYS | | BFR | P | 7564470 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 10/26/2022 | OR-10 fire barrier horizontal assembly framing -- pending splice for fire barrier continuity - framing OK per UL I505 pending other required inspections | LONNYS | LONNYS | | BFR | P | 7563023 |
HENSEL PHELPS CONSTRUCTION CO | BFR | R | 10/25/2022 | field cancelled per site rep Guy - no inspection performed | LONNYS | LONNYS | | BFR | R | 7561710 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 10/24/2022 | OR 10 - Observed soffit framing per V455 and penetrations per RFI provided on site. Splice plans to reflect as built condition. | ERAMIREZ | ERAMIREZ | | BFR | P | 7560097 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 10/03/2022 | pending splice for as built fire barrier horizontal continuity / framing corrections OK pending other required inspections | LONNYS | LONNYS | | BFR | P | 7537314 |
HENSEL PHELPS CONSTRUCTION CO | BFR | R | 09/29/2022 | ORTHO OR ROOM WALL // framing continuity incomplete for fire barrier EE of wall and at mech chase framing / approved plan does not show horizontal assembly at fire barrier / rest of frame OK pending other roughs | LONNYS | LONNYS | | BFR | R | 7534888 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 09/02/2022 | pending other required inspections / need to attach plumbing permit / will need to provide 3rd party welding, bolting and fire spray repair obs. by final / still need to inspect ortho OR room wall when ready / rest of interior light gauge steel framing OK | LONNYS | LONNYS | | BFR | P | 7505741 |
HENSEL PHELPS CONSTRUCTION CO | BE | P | 09/01/2022 | | MATTHEWM | MATTHEWM | | BE | P | 7503109 |
ENCORE ELECTRIC, INC. | E= | C | 02/09/2023 | | RANDY | RANDY | | E= | C | 7657861 |
ENCORE ELECTRIC, INC. | E= | P | 01/05/2023 | OR 9 and OR 10----final pending fire final | RANDY | RANDY | | E= | P | 7626465 |
ENCORE ELECTRIC, INC. | ER | P | 11/10/2022 | OR 9 and 10 above ceiling | RANDY | RANDY | | ER | P | 7578831 |
ENCORE ELECTRIC, INC. | ER | P | 10/03/2022 | OR 9 and 10 walls only | RANDY | RANDY | | ER | P | 7537448 |
MECHONE, INC. | H= | C | 02/08/2023 | ENGINEERS APPROVED TEST AND BALANCE REPORT SEE IMAGES. MECHANICAL FINAL--------------------COMPLETE | TREVORH | TREVORH | | H= | C | 7656317 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 12/15/2022 | HYDRONIC FINAL------------- COMPLETE , VAV HEATING WATER SUPPLY AND RETURN RAN PER PLAN, UNDER LINE PRESSURE, VERIFIED CONTROL VALVES AND PIPE LABELING | TREVORH | TREVORH | | H= | C | 7612127 |
MECHONE, INC. | HD | P | 11/01/2022 | (PHASE 5 SMALL 2 B ) DUCT ROUGH: REST ROOM EXHAUST AND SUPPLY NEAREST TO AG-206 OK, OK TO WRAP. SUPPLY DUCT FROM TB-134 OK, OK TO WRAP. VAV-TB-135 FOR FUTURE SHUTDOWN FOR PHASE 2C OK, OK TO WRAP. REGISTERS AND THERMOSTATS PER PLAN | TREVORH | TREVORH | | HD | P | 7568764 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 10/27/2022 | PHASE 5 HYDRONICS PLAN SHEET M3.01 (BDA 96) OR VAV PIPING UNDER LINE PRESSURE OK, OK TO INSULATE , FLOWSETS OK. | TREVORH | TREVORH | | HWP | P | 7564456 |
MECHONE, INC. | HD | P | 10/26/2022 | (DUCT ROUGH) TB-06 AND RAV-07 COMPLETE , AT NEXT INSPECTION REQUEST WILL VERIFY ACCESS , FLEX AND REGISTER INSTALL, THERMOSTAT INSTALL.. TEST AND BALANCE BY FINAL. | TREVORH | TREVORH | | HD | P | 7562897 |
MECHONE, INC. | HD | P | 10/03/2022 | reviewed pictures for fire smoke damper via flash drive provided by contractor, install is correct some pictures loaded see images. | TREVORH | TREVORH | | HD | P | 7537135 |
MECHONE, INC. | HD | P | 09/30/2022 | PHASE 5 (PLAN SHEET M2.02 BDA PAGE 92) PER CONTRACTOR THERE WILL BE A FORTHCOMING PLAN SPLICE SHOWING THE RELOCATION OF RAV 0-3 AND DUCT MOVED FROM CORRIDOR TO INSIDE THE OR, ALSO SHOWN WILL BE THE REMOVAL OF FIRE DAMPERS IN THE DEVIDING WALL BETWEEN OR ROOMS AS WALL IS TO CHANGE RATINGS, SUPPLY AND RETURN DUCT ROUGH : OPERATING ROOM #9 AND 10 AT NEXT INSPECTION REQUEST WILL NEED TO VERIFY DUCT AND RAV -0-7 CURRENTLY NOT INSTALLED, WILL VERIFY PICTURES OF FIRE SMOKE DAMPER FRAMING AND INSTALLED DURING A SCHEDULED OR SHUT DOWN. SUPPLY AND ROUND LATERAL RUN OUTS WITH IN OR'S OK, OK TO WRAP. | TREVORH | TREVORH | | HD | P | 7536129 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 12/15/2022 | | LEE | LEE | | P= | C | 7612696 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 12/15/2022 | | LEE | LEE | | PTO | C | 7612695 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 10/27/2022 | OVERHEAD H20 AND VENTS OK -- PHOTOS OF TIE-INS REQUESTED | LEE | LEE | | PTO | P | 7565042 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 09/15/2022 | WALLS ONLY FOR TWO DBL SINK ROUGH'S -- UNDERSLAB EXISTING | LEE | LEE | | PTO | P | 7518665 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 12/12/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Minor layout revisions | JUSTINC | JUSTINC | | XMS | P | 7607558 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 12/12/2022 | PAID (REC#1920545): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Wall clarifications and finishes | SHELLEY | SHELLEY | | XBS | T | 7607504 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 12/08/2022 | PAID (REC#1921004): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Clouded revisions only: Adjusted sheet P0.02 and P2.03. | SHANEN | SHANEN | | XPS | T | 7604684 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 10/28/2022 | PAID (REC#1910986): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: OR wall revisions, rated ceiling detail, and pacu. | SHELLEY | SHELLEY | | XBS | T | 7566688 |
ENCORE ELECTRIC, INC. | XES | P | 09/06/2022 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: Delta revision 17. As built. | DANIELG | DANIELG | | XES | P | 7507272 |
MECHONE, INC. | XMS | P | 09/06/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 7506952 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 09/06/2022 | PAID (REC#1897424): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Clean core and equipment storage | SHELLEY | SHELLEY | | XBS | T | 7506902 |
ENCORE ELECTRIC, INC. | XES | P | 08/17/2022 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: As built. | DANIELG | DANIELG | | XES | P | 7486609 |
MECHONE, INC. | XMS | P | 08/17/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: OR Revised | JUSTINC | JUSTINC | | XMS | P | 7485690 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 08/16/2022 | PAID (REC#1893257): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: OR revisions. | SHELLEY | SHELLEY | | XBS | T | 7485110 |