JR WILDER CONSTRUCTION LLC | B= | C | 07/09/2024 | | ERIKK | ERIKK | | B= | C | 8140596 |
JR WILDER CONSTRUCTION LLC | B= | P | 07/02/2024 | Temp CO: extension ( Expires: 8/1/2024 12:00:00 AM) | JANE | JANE | | B= | P | 8135745 |
JR WILDER CONSTRUCTION LLC | BE | T | 07/01/2024 | PAID (REC#2081315): TCO | JANE | JANE | | BE | T | 8134432 |
JR WILDER CONSTRUCTION LLC | B= | P | 05/29/2024 | Temp CO: extension ( Expires: 6/28/2024 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 8099588 |
JR WILDER CONSTRUCTION LLC | B= | P | 04/15/2024 | Temp CO: extension ( Expires: 5/15/2024 12:00:00 AM) | JANE | JANE | | B= | P | 8053046 |
JR WILDER CONSTRUCTION LLC | B= | P | 03/07/2024 | Temp CO: Pending zoning and building finals ( Expires: 4/6/2024 12:00:00 AM) | RITA | RITA | | B= | P | 8017606 |
JR WILDER CONSTRUCTION LLC | B= | P | 01/30/2024 | Temp CO: tco extension ( Expires: 2/29/2024 12:00:00 AM) | JANE | JANE | | B= | P | 7981221 |
JR WILDER CONSTRUCTION LLC | B= | P | 12/15/2023 | Temp CO: extension ( Expires: 1/14/2024 12:00:00 AM) | JANE | JANE | | B= | P | 7946366 |
JR WILDER CONSTRUCTION LLC | B= | P | 11/15/2023 | Temp CO: pending final inspection ( Expires: 12/15/2023 12:00:00 AM) | JACKIEP | JACKIEP | | B= | P | 7919867 |
JR WILDER CONSTRUCTION LLC | B= | T | 10/20/2023 | PAID (REC#2008584) Temp CO: Extension pending required finals ( Expires: 11/19/2023 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 7895235 |
JR WILDER CONSTRUCTION LLC | B= | P | 06/14/2023 | Temp CO: needs zoning ( Expires: 7/14/2023 12:00:00 AM) | JANE | JANE | | B= | P | 7771646 |
JR WILDER CONSTRUCTION LLC | B= | P | 05/17/2023 | need to complete core and shell, need to complete all other required inspections, rest of final okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), HIGH COUNTRY PLUMBING LLC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7746632 |
JR WILDER CONSTRUCTION LLC | B= | P | 05/12/2023 | Need to complete core and shell permit - need to complete all other required inspections - need to complete hand rails, need to verify 2 layers type X under stage -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), DIAMOND MECHANICAL SYSTEMS, LLC Mechanical Final Inspection is not Completed yet, HIGH COUNTRY PLUMBING LLC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7743208 |
JR WILDER CONSTRUCTION LLC | BSP | P | 04/21/2023 | Engineer letter for foot, foundation and wall insulation / Ledger observation on file / | ERIKK | ERIKK | | BSP | P | 7723091 |
JR WILDER CONSTRUCTION LLC | BFR | R | 06/16/2022 | still need to provide all foundation paperwork / splice in com check for addition / VIP room framing corrections OK pending other required inspections / stage/platform not built per plan - additional notes to follow after review of rated assemblies with plan reviewer / rest of interior light gauge steel framing OK pending other required inspections - reviewed accessible elements with site rep | LONNYS | LONNYS | | BFR | R | 7414091 |
JR WILDER CONSTRUCTION LLC | BIN | P | 05/13/2022 | complete BFR for VIP room / still need to splice in com check / observed R21 in exterior walls and R38 in ceiling / balance of core shell noted on permit N51089 | LONNYS | LONNYS | | BIN | P | 7375503 |
JR WILDER CONSTRUCTION LLC | BIN | R | 05/12/2022 | core shell portion of insulation noted on permit N51089 / no com check on file for addition - need to splice into approved plan and recall for inspection / provide designer letter for foundation insulation to complete BFI | LONNYS | LONNYS | | BIN | R | 7373508 |
JR WILDER CONSTRUCTION LLC | BFR | P | 04/13/2022 | FRAME INSPECTION FOR ADDITION ONLY / provide open hole, footing and foundation obs. to complete BFT and BFN / missing treated ledger - roof framing not per plan at HVAC - missing anchor bolt under north exterior window - tie in top plates to existing building - fire block incomplete at top plates - rest OK pending other required inspections | LONNYS | LONNYS | | BFR | P | 7337218 |
JR WILDER CONSTRUCTION LLC | BSP | P | 04/13/2022 | engineer letter for header on file / still need to inspect | LONNYS | LONNYS | | BSP | P | 7336120 |
ENCORE ELECTRIC, INC. | E= | C | 03/10/2023 | | RANDY | RANDY | | E= | C | 7684225 |
ENCORE ELECTRIC, INC. | E= | P | 02/23/2023 | need to check RTU 8-----firepit needs wired-----need panels labeled | RANDY | RANDY | | E= | P | 7669069 |
ENCORE ELECTRIC, INC. | EP | C | 12/16/2022 | panels and transformers, a, al1, al2 | BRET | BRET | | EP | C | 7614391 |
ENCORE ELECTRIC, INC. | ER | P | 10/25/2022 | drop ceilings ok | RANDY | RANDY | | ER | P | 7562118 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 10/18/2022 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 7553571 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 10/18/2022 | FIRE ALARM INSPECTION: | RANDY | RANDY | | ER | C | 7553566 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 10/18/2022 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 7553567 |
ENCORE ELECTRIC, INC. | ER | P | 05/18/2022 | front sign rough ok | RANDY | RANDY | | ER | P | 7380227 |
ENCORE ELECTRIC, INC. | ER | P | 05/12/2022 | suite 100 sign | RANDY | RANDY | | ER | P | 7374411 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 05/11/2022 | FIRE ALARM INSPECTION: FA walls ok | RANDY | RANDY | | ER | P | 7371468 |
ENCORE ELECTRIC, INC. | ER | P | 05/10/2022 | walls ok----riser room walls not built yet | RANDY | RANDY | | ER | P | 7370068 |
ENCORE ELECTRIC, INC. | E= | P | 04/06/2022 | All upper hard lid ceilings only - Ok | BRETC | BRETC | | E= | P | 7327860 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 04/06/2022 | FIRE ALARM INSPECTION: All upper hard lid ceilings only - Ok | BRETC | BRETC | | ER | P | 7327858 |
ENCORE ELECTRIC, INC. | ER | R | 03/29/2022 | Fire Alarm contractor needs to attach to permit / Ceiling hard lid rough ok, FA not complete ---------do not close ceiling-------------- / | BRETC | BRETC | | ER | R | 7318935 |
ENCORE ELECTRIC, INC. | EUG | R | 03/25/2022 | contractor called in inspection n wrong permit number | BRET | BRET | | EUG | R | 7314662 |
HIGH COUNTRY PLUMBING LLC | H= | C | 05/19/2023 | CORRECTIONS MADE GAS FINAL------------------COMPLETE | TREVORH | TREVORH | | H= | C | 7750001 |
HIGH COUNTRY PLUMBING LLC | H= | P | 05/18/2023 | PER CONTRACTOR VIA PHONE CALL , SET FOR TOMORROW. | TREVORH | TREVORH | | H= | P | 7748606 |
HIGH COUNTRY PLUMBING LLC | H= | P | 05/18/2023 | A COPY OF THE 2 PSIG APPROVAL LETTER SEE IMAGES. | TREVORH | TREVORH | | H= | P | 7747741 |
DIAMOND MECHANICAL SYSTEMS, LLC | H= | C | 05/15/2023 | CORRECTIONS MADE SEE IMAGES MECHANICAL FINAL-----------------------COMPLETE | TREVORH | TREVORH | | H= | C | 7744775 |
DIAMOND MECHANICAL SYSTEMS, LLC | H= | P | 05/08/2023 | 3-1/2'' CLEARANCE OF RTU ABOVE BUILT UP ROOFING IS OK., WILL STILL NEED ACCESS LADDER FOR HIGH ROOF. | TREVORH | TREVORH | | H= | P | 7737874 |
HIGH COUNTRY PLUMBING LLC | H= | P | 05/03/2023 | AT NEXT INSPECTION REQUEST WILL VERIFY GAS CONNECTIONS AT ALL COOKING EQUIPMENT. NEED TO SEE THE LETTER FROM THE GAS PURVEYOR APPROVING THE 2 PSIG SYSTEM. NEED TO SEE ACCESS TO THE ANSUL VALVE , NEED TO SEE WEATHER PROOF VENT LIMITER ON THE REGULATOR FOR RTU-8 ALSO NEED GAS PIPIE SUPPORTED AT ROOF. | TREVORH | TREVORH | | H= | P | 7734643 |
DIAMOND MECHANICAL SYSTEMS, LLC | H= | P | 05/03/2023 | GUARD RAILING FOR RTU-8 DOES NOT MEET THE HEIGHT SHOWN ON THE BUILDING PLAN SPLICE DATED 4-20-23, QUESTIONING MINIMUM HEIGHT FROM TOP OF ROOF TO BOTTOM OF RTU WILL CONSULT BUILDING AND UP DATE NOTES IN THE A.M. | TREVORH | TREVORH | | H= | P | 7734634 |
DIAMOND MECHANICAL SYSTEMS, LLC | H= | P | 05/02/2023 | CANCELED BY CONTRACTOR NO ROOF ACCESS TO LOWER ROOF TO VERIFY RTU-8 | TREVORH | TREVORH | | H= | P | 7733558 |
DIAMOND MECHANICAL SYSTEMS, LLC | H= | R | 05/01/2023 | THE ENGINEERS GREASE DUCT APPROVAL LETTER HAS ALREADY BEEN UPLOADED | TREVORH | TREVORH | | H= | R | 7731171 |
DIAMOND MECHANICAL SYSTEMS, LLC | H= | P | 04/28/2023 | TEST AND BALANCE REPORT RECEIVED SEE IMAGES .(SUITE 100 ) MECHANICAL FINAL PENDING------------------------NEED ACCESS TO ROOF TO LOWER ROOF TO VERIFY RTU-8 . BUILDING PLAN SPLICE APPROVING GUARD RAILING AT RTU-8. RTU-8 INSPECTION. HINGE KIT AND 1500 DEG GASKET FOR KEF.
| TREVORH | TREVORH | | H= | P | 7729900 |
HIGH COUNTRY PLUMBING LLC | H= | P | 04/21/2023 | AT NEXT INSPECTION REQUEST WILL VERIFY GAS CONNECTIONS AT ALL COOKING EQUIPMENT. NEED TO SEE THE LETTER FROM THE GAS PURVEYOR APPROVING THE 2 PSIG SYSTEM. NEED TO SEE ACCESS TO THE ANSUL VALVE | TREVORH | TREVORH | | H= | P | 7724091 |
HIGH COUNTRY PLUMBING LLC | HO | C | 04/21/2023 | 10 LB TEST OK FOR UNDERGROUND TO FIRE PIT TUBE HEATER REMOVED ON PLAN SPLICE. | TREVORH | TREVORH | | HO | C | 7724079 |
DIAMOND MECHANICAL SYSTEMS, LLC | H= | P | 04/20/2023 | (SUITE 100 ) HOOD INTERLOCKS TEST OK. LETTER FROM ENGINEER APPROVING THE MANUFACTURED GREASE DUCT CLEARANCE, SEE IMAGES. MECHANICAL FINAL PENDING----------------------- NEED ACCESS TO ROOF TO LOWER ROOF. BUILDING PLAN SPLICE APPROVING GUARD RAILING AT RTU-8. RTU-8 INSPECTION. HINGE KIT AND 1500 DEG GASKET FOR KEF. TEST AND BALANCE REPORT. | TREVORH | TREVORH | | H= | P | 7721875 |
HIGH COUNTRY PLUMBING LLC | HO | P | 04/07/2023 | NEED FORMER GAS CONTRACTOR TO REMOVE HIMSELF FROM PERMIT.(UNDERGROUND TO FIRE PIT) LOW TEST, PIPING PER PLAN. AT FINAL WILL NEED TO SEE STRIP BACK ON THE TRACK PIPE REPAIRED AT BOTH ENDS USING THE MANUFACTURES REQUIRED METHOD. | TREVORH | TREVORH | | HO | P | 7710489 |
HIGH COUNTRY PLUMBING LLC | HI | P | 04/05/2023 | NEED NMECH VOIDED FROM PERMIT / STILL NEED "HO" INSPECTION CALLED IN FOR UNDERGROUND GAS PIPE TO FIREPLACE. GAS PIPE PER PLAN, JUST NEEDS A 10 LB TEST / | MATTM | MATTM | | HI | P | 7707934 |
DIAMOND MECHANICAL SYSTEMS, LLC | H= | P | 03/23/2023 | (SUITE 100 ) HOOD INTERLOCKS TEST OK. MECHANICAL FINAL PENDING-----------------------LETTER FROM ENGINEER APPROVING GREASE DUCT CLEARANCES, NEED ACCESS TO ROOF. BUILDING PLAN SPLICE APPROVING GUARD RAILING AT RTU-8. RTU-8 INSPECTION. HINGE KIT AND 1500 DEG GASKET FOR KEF. TEST AND BALANCE REPORT. | TREVORH | TREVORH | | H= | P | 7696651 |
DIAMOND MECHANICAL SYSTEMS, LLC | H= | P | 03/06/2023 | NEED TO SEE GUARDS INSTALLED AT RTU-8 THIS WILL NEED TO BE SPLICED IN TO BUILDING FOR APPROVAL ALONG WITH ACCESS TO THE HIGH ROOF AT SUITE 100. NEED TO SEE INTERLOCK TEST FOR BOTH KITCHEN HOODS AT NEXT INSPECTION REQUEST. STILL NEED THE ENGINEERS APPROVAL LETTER FOR ALLOWING THE MANUFACTURES GREASE DUCT TO BE IN CONTACT WITH DRYWALL AS CLEARANCE LISTED ON THE TAG REQUIRES 3/4'' STILL NEED TO GET ON THE ROOF ABOVE THE VIP ROOM AND THE HIGH ROOF TO VERIFY CONDENSATE DRAINS AND WATER LEVEL MONITORING. | TREVORH | TREVORH | | H= | P | 7677978 |
DIAMOND MECHANICAL SYSTEMS, LLC | HRP | P | 01/31/2023 | CONTRACTOR TO ADD WALK IN COOLER TO THE SCOPE OF WORK, SELF CONTAINED WALK IN COOLER AND CONDENSATE DRAIN OK. | TREVORH | TREVORH | | HRP | P | 7649753 |
DIAMOND MECHANICAL SYSTEMS, LLC | HD | P | 11/01/2022 | MANHATTAN STILL NEED THE ENGINEERS SOLUTION ON GREASE DUCT IN CONTACT WITH COMBUSTIBLES, WILL NEED AN EXTENSION LADDER AT NEXT INSPECTION REQUEST TO VERIFY ADDED RTU-8 . MAKE UP AIR DUCTING OK, REST ROOM EXHAUST DUCTING ABOVE HARD LIDS OK, SUPPLY FLEX AND REGISTERS IN THE BACK OF HOUSE OK. STILL HAVE NOT SEEN AN EQUIPMENT ACCESS PLAN YET | TREVORH | TREVORH | | HD | P | 7568918 |
DIAMOND MECHANICAL SYSTEMS, LLC | HD | P | 10/25/2022 | MANHATTAN STILL NEED THE ENGINEERS SOLUTION ON GREASE DUCT IN CONTACT WITH COMBUSTIBLES, MAKE UP AIR DUCTING OK, REST ROOM EXHAUST DUCTING ABOVE HARD LIDS OK, SUPPLY FLEX AND REGISTERS IN THE BACK OF HOUSE OK. STILL HAVE NOT SEEN AN EQUIPMENT ACCESS PLAN YET | TREVORH | TREVORH | | HD | P | 7562025 |
HIGH COUNTRY PLUMBING LLC | HI | P | 10/18/2022 | WILL NEED PREVIOUS GAS CONTRACTOR VOIDED FROM PERMIT, BY FINAL WILL NEED TO SEE THE LETTER FROM THE GAS PURVEYOR APPROVING THE 2 PSIG SYSTEM , WILL NEED TO SEE ACCESS TO REGULATORS AND ANSUL VALVE . CONTRACTOR WILL NEED TO VERIFY IF ONE OR TWO WATER HEATERS ARE BEING INSTALLED, STILL NEED AN HO INSPECTION FOR THE UNDERGROUND TO FIRE PIT WHEN READY. 10 LB TEST OK, GAS PIPING SIZE AND ROUTING PER PLAN SPLICE DATED 7-15-22 OK, WILL VERIFY CONNECTIONS TO ALL EQUIPMENT AT FINAL. | TREVORH | TREVORH | | HI | P | 7553699 |
DIAMOND MECHANICAL SYSTEMS, LLC | HD | P | 07/20/2022 | (MECHANICAL ROUGH) ROOF TOP UNITS AND KITCHEN EXHAUST FAN ARE WITH IN 10' OF THE EDGE OF THE ROOF REFER TO THE 2015 IMC 306.5 & 304.11 FOR THE MAJORITY OF THE ROOF TOP EQUIPMENT, INSPECTOR TO VERIFY HEIGHT OF LOWER ROOF, THE REQUIRED LADDERS AND GUARD RAIL SYSTEM WILL NEED TO BE SHOWN ON PLANS AND APPROVED BY BUILDING, GREASE DUCT REQUIRES 3/4'' CLEARANCE TO COMBUSTIBLES GREASE DUCT TOUCHING DRYWALL WHERE IT EXISTS THE ROOF ENGINEER TO ADDRESS, GREASE DUCT TO HOOD IS BACK GRADED AWAY FROM HOOD, EF-1 AND DUCTING OK, RTU-1 AND 8 EXPOSED SUPPLY AND RETURN OK, SIDE WALL DIFFUSERS NOT INSTALLED AT THIS TIME. | TREVORH | TREVORH | | HD | P | 7453357 |
DIAMOND MECHANICAL SYSTEMS, LLC | HD | P | 07/14/2022 | CONTRACTOR CANCELLED DUE TO THE ISSUANCE OF A STOP WORK ORDER | TREVORH | TREVORH | | HD | P | 7446463 |
DIAMOND MECHANICAL SYSTEMS, LLC | HD | P | 05/25/2022 | NEED A REFRIGERATION CONTRACTOR ATTACHED TO THE PERMIT FOR THE WALK IN COOLER,COULD NOT VERIFY DUCTING RAN ABOVE HARD LIDS DUE TO THE DRYWALL BEING INSTALLED NO REGISTER OPENINGS FRAMED OUT , WILL NEED DRYWALL REMOVED OR PROVIDE MEANS TO INSPECT DUCT WORK. (DUCT ROUGH) RTU-2 SUPPLY AND RETURN , ROUND LATERAL RUN OUTS RAN PER PLAN, OK, OK TO WRAP. AT NEXT INSPECTION WILL NEED TO VERIFY EXHAUST DUCTING WHEN READY, NO ROOF TODAY, NO EXPOSED DUCTING INSTALLED YET. | TREVORH | TREVORH | | HD | P | 7389644 |
NMECH LLC | HI | P | 05/24/2022 | 10 LB TEST OK FOR 3/4'' LINE SHOWN ON PLANS FEEDING FUTURE OUTDOOR FIRE PIT , OK TO CONCEAL PIPE, NO OTHER GAS INSPECTED AT THIS TIME, WILL NEED TO SEE THE LETTER FROM THE GAS PURVEYOR APPROVING THE 2 PSIG SYSTEM, WILL NEED TO SEE MEDIUM PRESSURE STENCILING ON ALL EXPOSED PIPING, AND REGULATORS INPLACE WHEN READY. | TREVORH | TREVORH | | HI | P | 7387633 |
DIAMOND MECHANICAL SYSTEMS, LLC | HD | P | 05/24/2022 | (HOOD WALL) METAL STUD WALL ALL COMBUSTIBLE MATERIAL HAS BEEN REMOVED.OK, OK FOR HOOD | TREVORH | TREVORH | | HD | P | 7387612 |
SOCO PLUMBING | P= | C | 05/08/2023 | | LEE | LEE | | P= | C | 7738584 |
SOCO PLUMBING | PAV | C | 04/21/2023 | | LEE | LEE | | PAV | C | 7723836 |
SOCO PLUMBING | P= | P | 04/21/2023 | LACKS CORE / SHELL -- OTHER OK | LEE | LEE | | P= | P | 7723834 |
SOCO PLUMBING | P= | P | 04/19/2023 | NEED PAV -- OTHER OK -- REMINDER - WATER ENTRY ITEMS STILL INCOMPLETE -- WRAP ON WATER SERVICE, R.P DRAIN, FLOOR DRAIN ASSEMBLY MISSING | LEE | LEE | | P= | P | 7721031 |
SOCO PLUMBING | PAV | P | 04/19/2023 | NEED TO COMPLETE SUPPORT ON W/H VENTS -- REST OK | LEE | LEE | | PAV | P | 7721030 |
SOCO PLUMBING | P= | P | 03/21/2023 | HAND SINK MISSING AT BAR ( GOT DELETED AND APPROVED PER G.C WITH HEALTH DEPT ) -- NEED WATER TO ROOF SPLICE -- OTHER CORRECTIONS MADE | LEE | LEE | | P= | P | 7694039 |
SOCO PLUMBING | P= | P | 02/17/2023 | LIST TO INCLUDE BUT NOT LIMITED TOO -- (KITCHEN) --- W/H VENTS COVERED UP AND LACKS TEST ON EXHAUST PIPING X-2 -- NEED AIR GAPS ON T&P'S -- SUPPORT EXPANSION TANK AND PROVIDE LISTING / INSTALLATION INSTRUCTIONS FOR "TIAN-TAI" THERMAL EXPANSION TANK -- PREP SINK NOT PLUMBED BY BEVERAGE COUNTER -- DISPOSAL MISSING AT DISH WASH AREA PER PLANS -- NEED ALL FLOOR SINK STRAINERS INSTALLED -- INSTALL 3/4 GRATES FOR INDIRECT WASTE WHERE NEEDED -- SUPPORT INDIRECT DRAINS AT FLOOR SINK FOR ICE MACHINE AND MAINTAIN PROPER AIR GAPS -- (RESTROOM) --- CRITICAL LEVEL AT URINAL 1" SHORT-- (BAR AREA) --- NEED I/2" SUPPLY TO DISHWASHER (CAN'T DOWN-SIZE TO 3/8") -- COMPLETE SUPPORT ON ALL INDIRECT WASTE TO INCLUDE AIR GAPS AT FLOOR SINKS -- HAND SINKS CAN'T BE PIPED INDIRECT PER CODE -- NEED ALL THREE AAV'S EXPOSED AND ACCESSIBLE WITH PROPER COVERS -- WAIVED FEE FOR PUNCH LIST ---- NOTE: TANK TOILETS APPROVED PER SPLICE -- (((( DOMESTIC COLD NOT INSULATED PER PLANS PROVIDE ENGINEER APPROVAL )))) (((( WATER TO ROOF NOT ON PLANS (NEED SPLICE) AS PREVIOUSLY NOTED )))) ALSO NEED TO VERIFY TENNANT SUB METER PER PLANS | LEE | LEE | | P= | P | 7664761 |
SOCO PLUMBING | PTO | P | 05/12/2022 | REVISED # 2 -- NEED W/H VENTS -- WATER TO ROOF -- WATER TO PREP SINK -- LETTER / SPLICE FOR TOILETS -- REST OK | LEE | LEE | | PTO | P | 7374413 |
SOCO PLUMBING | PTO | P | 05/11/2022 | REVISED LIST -- LACKS SCREW PROTECTION SEVERAL SPOTS -- LACKING PEX SUPPORT SEVERAL AREAS -- WATER PIPING TO CLOSE TO EXTERIOR PORTION OF WALL X-2 -- QUESTION 1-1/2" URINAL STUB OUT -- CLOSET FLANGES MISSING ANCHORS -- NEED DOMESTIC WATER INSULATED -- STILL NEED WATER TO ROOF AND WATER TO PREP SINK ( ISLAND SINK ) -- NEED LETTER / SPLICE | LEE | LEE | | PTO | P | 7372544 |
SOCO PLUMBING | PTO | P | 05/10/2022 | BAR AREA -- NEED TO COMPLETE VERTICAL PEX SUPPORT -- NAIL / SCREW PROTECTION INCOMPLETE -- FREEZE PROTECTION EXTERIOR WALLS -- NEED TO PIPE HAND SINK DIRECT CONNECT -- RESTROOMS -- NEED PEX SUPPORT, SCREW / NAIL PROTECTION -- NEED FLANGES / ANCHORS -- KITCHEN -- WATER TO ROOF MISSING -- NEED ISLAND SINK WATER COMPLETED -- NEED PEX SUPPORT / FREEZE PROTECTION COMPLETED -- PVC NEEDS MID STORY GUIDES -- NEED VTR -- NAIL / SCREW PROTECTION INCOMPLETE -- NEED W/H VENTS INSTALLED AND TESTED -- INSTALL SUB METER LOOP -- (((( NEED ENGINEERS LETTER TO DELETE FLUSH VALVE TOILETS )))) -- FOR FINAL AAV AT BAR X-3 ONE BEHIND BEER COOLER | LEE | LEE | | PTO | P | 7370968 |
SOCO PLUMBING | XPS | P | 04/28/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Clouded revisions only: Adjusted sheet P1. | SHANEN | SHANEN | | XPS | P | 7729908 |
JR WILDER CONSTRUCTION LLC | XBS | T | 04/20/2023 | PAID (REC#1948831): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Add guard detail for roof top mechanical. | JUSTINL | JUSTINL | | XBS | T | 7722878 |
HIGH COUNTRY PLUMBING LLC | XMS | T | 10/18/2022 | PAID (REC#1911214): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Approved: new splice revised gas. | TCRIPPEN | TCRIPPEN | | XMS | T | 7553359 |
SOCO PLUMBING | XPS | P | 07/15/2022 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Clouded revisions only: Adjusted sheet P0 and P1. | SHANEN | SHANEN | | XPS | P | 7447532 |
ENCORE ELECTRIC, INC. | XES | T | 07/15/2022 | PAID (REC#1897146): PLAN SPLICE FEE: $50 by: DANIELG for Electrical: As built. | DANIELG | DANIELG | | XES | T | 7447480 |
JR WILDER CONSTRUCTION LLC | XBS | T | 05/20/2022 | PAID (REC#1874800): PLAN SPLICE FEE: $50 by: GITA for Construction: reduced VIP lounge size and added multiple counters | GITA | GITA | | XBS | T | 7383742 |