GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 03/10/2023 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 7683597 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 02/09/2023 | pending completion of other required inspections, building okay. Additional Inspections Required (computer generated): U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7658380 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 12/09/2022 | PARTIAL / WALL FRAME (1hr fire barrier) / observed wall framing between kitchen and waste storage rooms only - see approved splice dated 29AUG22 / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7606508 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 07/13/2022 | Dining area OK ONLY / Complete other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), FIRE ALARM: ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, ENCORE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, U.S.ENGINEERING CONSTRUCTION, LLC Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 7444534 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/14/2022 | PARTIAL / WALL FRAME / observed light gauge wall framing in lobby 1209 / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7410307 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/09/2022 | GYP INSPECTION / 2HR FIRE BARRIER / observed face layer 5/8" gyp at exterior side of mech. room walls | BRIANB | BRIANB | | BSP | P | 7405481 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/07/2022 | GYP PENETRATIONS / observed above grid gyp penetrations garage side in 2hr fire barrier / still need to inspect gyp penetrations in 2hr fire barrier mechanical room side | BRIANB | BRIANB | | BSP | P | 7401996 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/06/2022 | observed hard lid in-fill framing along 2hr fire barrier in garage / need to inspect above grid gyp penetrations in 2hr fire barrier | BRIANB | BRIANB | | BFR | P | 7400160 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/27/2022 | 2nd and 3rd layer of gypsum at 2hr fire barrier in mech room OK | DAKOTAB | DAKOTAB | | BSP | P | 7392049 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/25/2022 | GYP INSPECTION / 2HR FIRE BARRIER / observed base layer 5/8" gyp at exterior side of mechanical room | BRIANB | BRIANB | | BSP | P | 7388553 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | R | 05/16/2022 | inspection cancelled per call with superintendent | BRIANB | BRIANB | | BIN | R | 7377814 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/12/2022 | Training with Brian B / Reviewed elements of I-2 construction / Reviewed fire barriers, fire partitions, penetration protection, stenciling, fire joints, egress, etc. | CHRISTINEH | CHRISTINEH | | BSP | P | 7374531 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/12/2022 | SOFFIT FRAME / DINING & LOUNGE AREA / observed soffit framing at areas noted / pending other rough inspections ------
GYP INSPECTION / INSIDE VESTIBULE / observed (2) layers gyp at interior side of vestibule at 2hr fire barrier and 2hr smoke barrier | BRIANB | BRIANB | | BFR | P | 7374464 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/05/2022 | drywall install at inside of mech room on east, west and east half of north wall per U 489 okay | BOBF | BOBF | | BSP | P | 7365693 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/21/2022 | PARTIAL / WALL FRAME - MECHANICAL G008 / observed wall framing in room noted / discussed details for V489 fire barrier assembly with site reps / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7347964 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/19/2022 | PARTIAL / WALL FRAMING / DINNING G005 - LOUNGE G006 / observed wall framing at areas noted - pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7343833 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/13/2022 | PARTIAL / WALL FRAME - 1" GYP / 2HR FIRE - SMOKE BARRIER / VESTIBULE G007 - ATRIUM / V455 - V489 / observed wall framing and 1" gyp panels at vestibule - atrium common walls for 2hr fire - smoke barriers / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 7337483 |
ENCORE ELECTRIC, INC. | E= | C | 12/12/2022 | FIRE ALARM INSPECTION: | AARONR | AARONR | | E= | C | 7608562 |
ENCORE ELECTRIC, INC. | E= | C | 12/12/2022 | | AARONR | AARONR | | E= | C | 7608557 |
ENCORE ELECTRIC, INC. | E= | R | 07/15/2022 | E= OK ----- LUNCH RM AREA OK ---- STILL NEED TO SEE PHYSICAN LOUNGE ---- | GREGM | GREGM | | E= | R | 7447841 |
ENCORE ELECTRIC, INC. | E= | R | 07/08/2022 | Lunch room area OK. --- See prints for areas inspected. | AARONR | AARONR | | E= | R | 7440360 |
ENCORE ELECTRIC, INC. | ER | P | 07/08/2022 | Junction boxes in parking garage are OK. | AARONR | AARONR | | ER | P | 7440357 |
ENCORE ELECTRIC, INC. | ER | P | 06/28/2022 | FIRE ALARM INSPECTION: Ceiling rough OK. See prints for areas inspected. | AARONR | AARONR | | ER | P | 7428766 |
ENCORE ELECTRIC, INC. | ER | P | 06/28/2022 | Ceiling rough OK. See prints for areas inspected. | AARONR | AARONR | | ER | P | 7428763 |
ENCORE ELECTRIC, INC. | ER | P | 06/07/2022 | Hard lids OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7402918 |
ENCORE ELECTRIC, INC. | ER | P | 05/23/2022 | FIRE ALARM INSPECTION: Hard lid rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7386196 |
ENCORE ELECTRIC, INC. | ER | P | 05/23/2022 | Hard lid rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7386190 |
ENCORE ELECTRIC, INC. | ER | P | 04/28/2022 | FIRE ALARM INSPECTION: Wall rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7356739 |
ENCORE ELECTRIC, INC. | ER | P | 04/28/2022 | Wall rough OK. --- See prints for areas inspected. | AARONR | AARONR | | ER | P | 7356737 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | C | 03/10/2023 | ENGINEER STAMPED LETTER APPROVING TEST AND BALANCE REPORT RECEIVED. SEE IMAGES / MECHANICAL FINAL OK / | LIDO | LIDO | | H= | C | 7683596 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 02/27/2023 | TEST AND BALANCE REPORT IS NOT COMPLETE AND DOES NOT INCLUDE ALL SCOPE OF WORK READINGS FOR THIS PERMIT/ CONTRACTOR TO PLEASE CONFIRM REPORT IS COMPLETE BEFORE SUBMITTING REPORT FOR REVIEW / | LIDO | LIDO | | H= | P | 7670693 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 01/17/2023 | PLAN SPLICE DATED 10/28/22 : FIRE SMOKE DAMPER COMPLETE/ ROOF OK / FINAL PENDING: NEED TEST AND BALANCE REPORT /
| LIDO | LIDO | | H= | P | 7636163 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 12/09/2022 | PLAN SPLICE DATED 10/28/22 / PLANS SHOW FIRE SMOKE DAMPER TO BE INSTALLED FOR TRANSFER AIR FROM ROOM TO CORRIDOR. INSTALL PER PLAN. CORRIDOR TRANSFER AIR FIRE SMOKE DAM,PER FRAME OK / EXHAUST AIR FIRE DAMPER FRAME AND DAMPER INSTALL COMPLETE. DUCT INSTALL OK / NEED ROOF AND MISSING GRILL IN INCIDENTAL USE ROOM / | LIDO | LIDO | | H= | P | 7606946 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 12/09/2022 | FINAL PENDING: STILL NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7606348 |
U.S. ENGINEERING CONSTRUCTION, LLC | H= | P | 09/22/2022 | FINAL PENDING: NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | H= | P | 7526645 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | C | 06/30/2022 | GARDEN LEVEL PLAN PAGE MH-102 HEAT FINAL : STILL NEED THERMOSTAT IN ELEVATOR LOBBY / MAU-1 MECHANICAL ROOM FINAL OK / ROOM # G005, G006 FINAL OK / 1ST FLOOR PLAN PAGE MH-112 HEAT FINAL : PENDING VERIFICATION OF KEY NOTE 4 / 2ND FLOOR PLAN PAGE MH-122 HEAT FINAL : PENDING VERIFICATION OF KEY NOTE 2 / 4TH FLOOR PLAN PAGE MH 142 HEAT FINAL OK / NEED TEST AND BALANCE REPORT / | LIDO | LIDO | | HD | C | 7432211 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/21/2022 | 4TH FLOOR PLAN PAGE MH-142 : DUCT ROUGH COMPLETE. OK TO INSULATE / 1- DAMPER COMPLETE / | LIDO | LIDO | | HD | P | 7419496 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/14/2022 | 1ST FLOOR PLAN PAGE MH 102 (BDA 33) : DAMPER FSD-G35 AND FSD-G36 COMPLETE. SEE IMAGES / | LIDO | LIDO | | HD | P | 7409868 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/13/2022 | PLAN PAGE MH102 (BDA 33) : MAU-1 AND DUCT ROUGH COMPLETE / MAU-1 DUCT PENETRATION THROUGH CONCRETE FLOOR IS PER 3M ENGINEER JUDGMENT LETTER / DETAIL. SEE IMAGES FOR EJ LETTER / DETAIL ./ | LIDO | LIDO | | HD | P | 7409506 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/07/2022 | 1ST FLOOR PLAN SPLICE MH -112 DATED 5/23/22 : 5 MOTORIZE DAMPERS INSTALLED OK / GARDEN LEVEL PLAN SPLICE MH -102 DATED 5/23/22 : 3 MOTORIZE DAMPERS INSTALLED OK / | LIDO | LIDO | | HD | P | 7402471 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/05/2022 | 1ST FLOOR PLAN PAGE MH 102 : DAMPER FSD-G35 - DAMPER FRAME AND DAMPER BREAKAWAY CONNECTIONS ON EACH SIDE OF DAMPER OK (still need retaining angles)/ DAMPER FSD-G36 - DAMPER BREAKAWAY CONNECTION ON EACH SIDE OF WALL OK (still need retaining angles) / | LIDO | LIDO | | HD | P | 7399708 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 06/01/2022 | 1ST FLOOR PLAN PAGE MH 102 : DAMPER FSD-G35 - DAMPER FRAME AND DAMPER BREAKAWAY CONNECTIONS ON EACH SIDE OF DAMPER OK / DAMPER FSD-G36 - DAMPER FRAME OK / | LIDO | LIDO | | HD | P | 7396276 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 05/26/2022 | GARDEN LEVEL PLAN PAGE MH102 / MH112 MAU-1 DUCT 3M615+ (ventilation air duct) FIRE BARRIER WRAP AND FIRE BARRIER WRAP PENETRATIONS THROUGH FIRE BARRIERS : 3M ENGINEER JUDGMENT LETTER FOR WALL PENETRATIONS DEFINE THE WALLS BEING PENETRATED AS FIRE PARTITIONS. THE WALLS ARE FIRE BARRIERS. 3M ENGINEER TO ADDRESS / ALSO LETTER SHOWS TO INSTALL IN ACCORDANCE WITH INTERTECH DESIGN /3MU/DI120-01 ON BOTH SIDES OF THE ASSEMBLY. CP25WB+ 3M SEALANT WAS USED BUT DOES NOT SHOW AS AN APPROVED SEALANT FROM THE INTERTECH DESIGN. REPLACE WITH THE APPROVED SEALANT OR 3M ENGINEER TO ADDRESS / ENTIRE FIRE BARRIER WRAP INSTALL - PER MANUFACTURER DUCT (S) GREATER THAN 48" WIDE ARE REQUIRED TO BE PINED ON THE BOTTOM AND THE SIDES (ducts are 48" x36") / FIRE BARRIER WRAP INSTALL ON THE MECHANICAL ROOM AND DINING SIDE - STAINLESS STEEL BANDS ARE SPACED MORE THAN THE MAXIMUM 10.5" ALLOWED AND MORE THAN 1.5" FROM THE END EDGE OF THE WRAP / | LIDO | LIDO | | HD | P | 7390818 |
U.S. ENGINEERING CONSTRUCTION, LLC | HSP | P | 05/12/2022 | 3M ENGINEER JUDGMENT LETTER FOR 48"X36" DUCT PENETRATION THROUGH CONCRETE FLOOR RECEIVED. SEE IMAGES / | LIDO | LIDO | | HSP | P | 7374564 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 05/12/2022 | GARDEN LEVEL MH-102 : 4 DAMPERS COMPLETE / | LIDO | LIDO | | HD | P | 7374370 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 05/11/2022 | CONSULT ON 3M JUDGMENT LETTER FOR FIRE BARRIER WRAP PENETRATION THROUGH RATED WALL /
| LIDO | LIDO | | HD | P | 7372368 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 05/09/2022 | GARDEN LEVEL PLAN PAGE MH102 / MH112 MAU-1 DUCT ROUGH OK. OK TO INSTALL FIRE BARRIER WRAP / 4TH FLOOR MH141 : 1 SHAFT FIRE SMOKE DAMPER FRAME OK / | LIDO | LIDO | | HD | P | 7368877 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/27/2022 | GARDEN LEVEL PLAN PAGE MH 102 - 4 DAMPER FRAMES OK / | LIDO | LIDO | | HD | P | 7354448 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/26/2022 | ADDITIONAL IN THE FIELD MEETING PERTAINING TO MAU -1 DUCT INSTALL AND 3M 615+ FIRE BARRIER WRAP INSTALL REQUIREMENTS. 1 LAYER FIRE BARRIER WRAP INSTALL METHOD WILL SUFFICE. THE PENETRATIONS THROUGH THE TWO FIRE BARRIERS AND PENETRATION THROUGH THE FLOOR CEILING ASSEMBLY WILL NEED TO BE DONE PER THE MANUFACTURER APPROVED FIRE STOP DETAIL. SEE INSTALL INSTRUCTIONS / | LIDO | LIDO | | HD | P | 7352269 |
U.S. ENGINEERING CONSTRUCTION, LLC | HD | P | 04/18/2022 | DUCT ROUGH : (E) VAV 1B-G-26, 27 AND 28 - NEED FIRE DAMPER FRAME INSPECTION AND DAMPER INSTALL INSPECTION. LOW PRESSURE DUCT ROUGH OK. OK TO INSULATE ./ | LIDO | LIDO | | HD | P | 7342391 |
U.S. ENGINEERING CONSTRUCTION, LLC | HSP | P | 04/07/2022 | MET WITH PROJECT DESIGN TEAM TO GO OVER MANUFACTURER REQUIREMENTS FOR 3M 615+ FIRE BARRIER WRAP / | LIDO | LIDO | | HSP | P | 7330648 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 07/13/2022 | | JOSEPHD | JOSEPHD | | P= | C | 7445003 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 07/13/2022 | splice for aav done | JOSEPHD | JOSEPHD | | PTO | C | 7444993 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/03/2022 | need engineer letter for aav at sink, rest of in-wall ok, check water pipe insulation at final | JOSEPHD | JOSEPHD | | PTO | P | 7361119 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 04/19/2022 | | JOSEPHD | JOSEPHD | | PB | C | 7343831 |
OLSON PLUMBING & HEATING COMPANY | P16 | P | 04/13/2022 | Consult on 2" drain line move underground / need pictures after tie in. | DANR | DANR | | P16 | P | 7336978 |
U.S. ENGINEERING CONSTRUCTION, LLC | XMS | T | 12/05/2022 | PAID (REC#1918560): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised layout as noted | JUSTINC | JUSTINC | | XMS | T | 7599795 |
ENCORE ELECTRIC, INC. | XES | T | 09/14/2022 | PAID (REC#1904947): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add Hazarous waste storage and Kitchen storage to plan set. | SHELBY | SHELBY | | XES | T | 7517112 |
U.S. ENGINEERING CONSTRUCTION, LLC | XMS | P | 08/29/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised Hazardous exhaust | JUSTINC | JUSTINC | | XMS | P | 7498864 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 08/29/2022 | PAID (REC#1902404): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Kitchen and hazardous storage. | SHELLEY | SHELLEY | | XBS | T | 7498617 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 06/14/2022 | PAID (REC#1875502): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Floor plan revision | SHELLEY | SHELLEY | | XBS | T | 7411036 |
U.S. ENGINEERING CONSTRUCTION, LLC | XMS | P | 05/23/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Duct wrap note revisions | JUSTINC | JUSTINC | | XMS | P | 7385966 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 05/23/2022 | PAID (REC#1874309): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 98 revisions: Adjusted sheet P102. | SHANEN | SHANEN | | XPS | T | 7385943 |
ENCORE ELECTRIC, INC. | XES | T | 05/04/2022 | PAID (REC#1866754): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise lighting on sheet EL101 | SHELBY | SHELBY | | XES | T | 7363969 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | XBS | T | 04/13/2022 | PAID (REC#1858225): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised listed assembly | SHELLEY | SHELLEY | | XBS | T | 7336049 |
U.S. ENGINEERING CONSTRUCTION, LLC | XMS | T | 04/06/2022 | PAID (REC#1856656): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised for EF replacement | JUSTINC | JUSTINC | | XMS | T | 7329062 |