EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 04/24/2024 | Hat channel on garages 103 and 301 ok / | ERIKK | ERIKK | | BFR | P | 8062955 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 04/12/2024 | building complete, still need column at gate | BOBF | BOBF | | BLA | P | 8051292 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 04/09/2024 | penetration protection above ceiling in 1st floor corridor across from garage unit 304 okay | BOBF | BOBF | | BFR | P | 8046761 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 04/08/2024 | drywall install at rated walls in main floor corridor per U305 and U356 okay, please note, still need to protect penetrations at outside wall above ceiling across from garage 304 | BOBF | BOBF | | BFR | P | 8045549 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 04/01/2024 | Gyp and gyp attachment in garages 316, 217 and 117 ok / | ERIKK | ERIKK | | BFR | P | 8038802 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/28/2024 | drywall install per U305 and L528 in garage units 215,315, 116 and 216 okay drywall install in lobby ceiling okay, lobby ceiling is now complete | BOBF | BOBF | | BFR | P | 8036186 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/27/2024 | Final layer of gyp and gyp attachment for both elevator shafts ok / | ERIKK | ERIKK | | BFR | P | 8034631 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | R | 03/26/2024 | request was for final layer drywall install at elevator shaft ceilings, Nor ready - Trip fee waived | BOBF | BOBF | | BFR | R | 8032955 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/25/2024 | hat channel install over 3rd layer of drywall at top of elevater shaft per I512 okay | BOBF | BOBF | | BFR | P | 8032024 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/22/2024 | Garage gyp and gyp attachment on units 215, 315 and 116 ok / 3rd layer gyp and gyp attachment on elevator shaft lid ok / Still need to inspect hat channel on elevator shaft lid / | ERIKK | ERIKK | | BFR | P | 8030625 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/21/2024 | 1st layer and start of 2nd layer drywall install per I512 at top of both elevator shafts okay | BOBF | BOBF | | BFR | P | 8028902 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/20/2024 | Drywall install per L528, and U305 in garage units 213, 114, 214, 314 and 315 okay, Hat chanel install on ceilings of garage unis 315, 116, 216, 316 and 117 okay, Grid X install per I512 in both elevator shafts okay | BOBF | BOBF | | BFR | P | 8027432 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/19/2024 | Drywall install at rated walls and ceilings per U305 and L528 in garages 113, 312, 212, 112, 211, 111, 109, 311 ok / Center lobby lower floor ceiling hat channel ok / | ERIKK | ERIKK | | BFR | P | 8026049 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/18/2024 | Hat channel install in garage units 313, 314, 114 and 115 okay | BOBF | BOBF | | BFR | P | 8024781 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | R | 03/13/2024 | request was for hat channel install in garages - garages 114, 314 and 115 not ready, garages 213, 113, and 214 okay | BOBF | BOBF | | BFR | R | 8022634 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/12/2024 | drywall install at rated ceilings in garage units 109, 209, 309, 110, 210 and 310 okay - reviewed requirements for hand rails in stairs | BOBF | BOBF | | BFR | P | 8021632 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/08/2024 | hat channel install in garage units 110, 210, 310, 111, 211, 112, 212, 312, 113 and 213 okay | BOBF | BOBF | | BFR | P | 8018657 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | R | 03/06/2024 | 110, 210and 310 hat channel not ready, 109, 209 and 309 hat channel install okay | BOBF | BOBF | | BFR | R | 8015738 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 03/04/2024 | drywall install at rated walls and ceilings per U305 and L528 in garages 101, 204, 106, 105, 205, 104 and 202 okay | BOBF | BOBF | | BFR | P | 8013112 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/29/2024 | Drywall install on walls and ceilings in garage units 303, 203, 103, 304, 306 and 208 per U 305 and L528 okay, dtywall install on walls only per U305 in garage unit okay, Hat channel install in garage units 101, 201 and 204 not ready | BOBF | BOBF | | BFR | P | 8009776 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/27/2024 | drywall install at rated walls and ceilings in main level lobby and 2nd floor common room per U 305, U341, U356 and L518 okay | BOBF | BOBF | | BFR | P | 8007231 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/26/2024 | Hat channel install in garage units 103, 304, 104, 205, 105, 306 and 106 okay | BOBF | BOBF | | BFR | P | 8005924 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 02/22/2024 | lath install at middle section outside lobby area on south side okay | BOBF | BOBF | | BLA | P | 8003031 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/22/2024 | 1st layer drywall install per Table 721,2,21 in garage units 206, 307, 207, 107, 308 and 108 okay | BOBF | BOBF | | BFR | P | 8003029 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/20/2024 | hat channel install on ceiling of lobby and 2nd floor common room okay | BOBF | BOBF | | BFR | P | 7999511 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 02/20/2024 | starting at west end unit 12 to center of building on south side of building okay | BOBF | BOBF | | BLA | P | 7999508 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/16/2024 | hat channel install in garage units 203, 306, 107, 207, 307, 208 and 308 okay | BOBF | BOBF | | BFR | P | 7997970 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/12/2024 | Unit 317 gyp screws ok / Garages 4, 6, 7 Hat channel ok / | ERIKK | ERIKK | | BFR | P | 7993757 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/07/2024 | Frame inspection on garages 2-50 ok / Gyp screws on 3rd floor center gym ceiling ok / 4th floor east corridor and common area gyp screws ok / | ERIKK | ERIKK | | BFR | P | 7989576 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 02/02/2024 | LEVEL 3 - UNIT DRYWALL 316, 317 // Unit 317 need mechanical closet wall and ceiling completed in laundry room, / 316 okay. | NATHAN | NATHAN | | BFR | P | 7985916 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/30/2024 | Units 312-315 gyp screws ok / 4th floor west corridor gyp screws ok / 4th floor conference room and 3rd floor gyp hat channel inspections ok / | ERIKK | ERIKK | | BFR | P | 7981843 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/26/2024 | 2nd floor conference room frame ok / 3rd floor gym frame ok / 4th floor conference room frame ok / Units 309-311 gyp screws ok / Unit 317 Hat channel ok / | ERIKK | ERIKK | | BFR | P | 7979269 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/23/2024 | Units 214-217 Gyp screws ok / Units 314-316 Hat channel ok / | ERIKK | ERIKK | | BFR | P | 7974913 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/19/2024 | Unit 212 and 213 gyp screws ok / | ERIKK | ERIKK | | BFR | P | 7972676 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 01/17/2024 | HAT CHANNEL / 4TH FLR UNITS 309 - 310 - 311 - 312 - 313 / P522 / observed hat channel at lid in units noted / pending other rough inspections | BRIANB | BRIANB | | BSP | P | 7970153 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/16/2024 | Unit 311 hat channel ok / Unit 211 gyp screws ok / | ERIKK | ERIKK | | BFR | P | 7968703 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/12/2024 | Unit 209-210 gyp scews ok / Unit 215-217 hat channel ok / | ERIKK | ERIKK | | BFR | P | 7967377 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/10/2024 | Unit 209 - 214 Hat channel inspection ok / 3rd floor east side corridor gyp screws ok / Garage floor west corridor frame inspection on north wall ok / | ERIKK | ERIKK | | BFR | P | 7964356 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/08/2024 | 4th floor units 309 - 317 frame inspection - Unit 309 FC at penetrations / Unit 312 FC at penetrations / Unit 313 FC penetrations / Unit 314 FC at penetrations / Rest of frame ok /
Unit 114 - 117 gyp screws ok on units / | ERIKK | ERIKK | | BFR | P | 7962250 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 01/04/2024 | 2nd floor corridor gyp screws ok / Units 111-113 gyp screws ok / | ERIKK | ERIKK | | BFR | P | 7960015 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 01/03/2024 | South side lath ok up to middle of building / | ERIKK | ERIKK | | BLA | P | 7958645 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/29/2023 | Hat channel inspection on units 113 - 117 ok /
Gyp screws on 3rd and 4th floor corridor to unit common wall ok /
Unit 110 and 109 gyp screws ok / | ERIKK | ERIKK | | BFR | P | 7956446 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/27/2023 | 3rd floor west end units frame inspection ok / 2nd floor west end Hat channel units 109-112 ok / | ERIKK | ERIKK | | BFR | P | 7954222 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 12/27/2023 | South side of building on west half lath ok / | ERIKK | ERIKK | | BLA | P | 7954221 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/20/2023 | Above ceiling framing at units 109 - 114 west side of second floor ok / 2nd floor west side corridor framing ok / | ERIKK | ERIKK | | BFR | P | 7950725 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 12/18/2023 | Lath of on south west end, 6 garages up to first bump out ok / | ERIKK | ERIKK | | BLA | P | 7947733 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/15/2023 | 4th floor - Units 306 - 308 gyp screws ok /
Frame inspection of exterior walls only on 2nd floor units 109 - 177 / Unit 115 - F/C at gas pipes incomplete / Other units exterior walls ok /
| ERIKK | ERIKK | | BFR | P | 7946409 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | R | 12/12/2023 | Not ready for 2nd floor frame inspection on units / | ERIKK | ERIKK | | BFR | R | 7942767 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/11/2023 | 4th floor units 301-305 gyp screws ok / | ERIKK | ERIKK | | BFR | P | 7941397 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 12/07/2023 | North west end of west exterior door tower lath ok / | ERIKK | ERIKK | | BLA | P | 7938883 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 12/04/2023 | 4th FLOOR Frame and firestop 401-408 401, 2 abandoned holes at bathroom / 402 back to back boxes at entry / 403, 404, / 405 elevator call box over 16 sq in / 406, 407, / 408 abandoned hole at corridor sprinkler pipe, fire block the top gap of the double walls all units. | NATHAN | NATHAN | | BFR | P | 7934722 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/29/2023 | 3rd floor unit 208 gyp screws ok / 1st floor exterior north side corridor frame ok on east wing / 2nd floor east wing corridor gyp screws ok / | ERIKK | ERIKK | | BFR | P | 7930264 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/28/2023 | LEVEL 3 -- SOUTH WING -- Gypsum attachment in units 202,203,204,205,206,and 207 OK
LEVEL 4 -- SOUTH WING -- Wall frame and penetrations at corridor exterior wall OK | DAKOTAB | DAKOTAB | | BFR | P | 7929429 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/22/2023 | drywall install on rated walls and ceilings in unit 202 okay, framing and penetration protection on exterior 3rf floor corridor wall okay | BOBF | BOBF | | BFR | P | 7926971 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 11/21/2023 | lath on east side okay | BOBF | BOBF | | BLA | P | 7925302 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/21/2023 | drywall install in unit 203 okay except bathrooms not ready / unit 208 hat channel and insulation okay | BOBF | BOBF | | BFR | P | 7925301 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/20/2023 | drywall install at rated ceilings and walls in units 105 and 108 okay, insulation and hat channel in unit 207 okay | BOBF | BOBF | | BFR | P | 7923565 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/17/2023 | drywall install in unit 104 okay, 2nd floor exterior corridor wall framing and penetration protection from unit 101 to 108 okay, hat channel and insulation in units 205 and 206 okayframing corrections in units 205 and 208 okay | BOBF | BOBF | | BFR | P | 7922282 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/16/2023 | drywall install in units 103, and 104 and 105 okay, framing corrections in units 201 through 207 okay, hat channel install in units 201 through 204 okay | BOBF | BOBF | | BFR | P | 7921060 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/15/2023 | 2nd layer drywall on ceiling and drywall install on rated walls in unit 106 okay | BOBF | BOBF | | BFR | P | 7919576 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/14/2023 | 1st layer drywall install on ceilings in units 103 through 108 okay | BOBF | BOBF | | BFR | P | 7918363 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/10/2023 | 3rd floor corridor closet frame penetration protection okay, revied framing for intersecting walls at rated walls | BOBF | BOBF | | BFR | P | 7915225 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/09/2023 | framing and penetration protection for units 202 through 208 okay, by insulation need to move studs at intersecting walls to allow drywall to be installed behind them, framing and penetration protection at winter heating rooms on 2nd floor east end okay | BOBF | BOBF | | BFR | P | 7914372 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/08/2023 | frame and penetration protection and RC channel in units 103, 104, 105, 106, 107 and 108 okay, need to relocate ice maker box in unit 105, need to repair damaged drywall between 107 and 108, drywall install on ceiling in corridor on 4th floor between 301 and 305 okay, RC channel from 305 to 317 corridor ceiling okay | BOBF | BOBF | | BFR | P | 7912720 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | R | 11/07/2023 | cannot inspect rc channel and insulation prior to frame inspection, need to expose penetrations and point loads and tub trap protection in all units requested | BOBF | BOBF | | BFR | R | 7911298 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/06/2023 | tusses and hardware in units 311 through 317 okay | BOBF | BOBF | | BFR | P | 7909883 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/03/2023 | 4th floor truss clips at corridor to unit north wall ok from east wall down to unit 311 / 2nd layer gyp ok on 1st floor corridor lid ok from east to west / | ERIKK | ERIKK | | BFR | P | 7908180 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 11/02/2023 | North west end of building lath and west end wall lath ok / Still need to inspect south of building / | ERIKK | ERIKK | | BLA | P | 7906896 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 11/02/2023 | Unit 102 second layer gyp ok / Corridor truss clips at trusses to north side unit wall ok on east half of corridor, still need to inspect west end of corridor for completion / | ERIKK | ERIKK | | BFR | P | 7906888 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 10/31/2023 | FIRST LAYER OF GYP AND GYP FASTENING CEILING UNIT 102 / SECOND LAYER OF GYP AND GYP FASTENING CEILING UNIT 201 / GA File No. FC5529 / Observed gyp and gyp fastening at areas noted / pending other rough inspections | JASONL | JASONL | | BSP | P | 7904436 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 10/30/2023 | BFR changed to BSP / Unit 201 east end 1sy layer gyp screws ok on lid / | ERIKK | ERIKK | | BSP | P | 7903027 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/26/2023 | pending other required inspections - interior frame and penetration protection and hat channel unit 102 okay | BOBF | BOBF | | BFR | P | 7900395 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/24/2023 | hat channel install at all 4th floor patio ceilings okay | BOBF | BOBF | | BFR | P | 7897648 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/23/2023 | 2nd layer drywall install per L518 on 3rd floor corridor okay, Hat channel install on 3rd floor patio ceilings ifor all units okay | BOBF | BOBF | | BFR | P | 7896000 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/20/2023 | Hat channel on 1st floor corridor going west to garage 213 okay, insulation in unit 201 okay, reviewed accessible elements for type A units | BOBF | BOBF | | BFR | P | 7895070 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | R | 10/18/2023 | Hat channel in 1st floor corridor not ready | BOBF | BOBF | | BFR | R | 7891199 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/17/2023 | Hat channel install on 1st floor corridor ceiling from east end to even with Garage 309 okay | BOBF | BOBF | | BFR | P | 7889786 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/16/2023 | drywall stagger for 2nd layer on ceiling in unit 101 okay, Hat channel install on patio ceilings units 113 through 117 okay | BOBF | BOBF | | BFR | P | 7888708 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/13/2023 | 1st layer drywall install per L521 in unit 101 okay, drywall install on ceiling of 3rd floor corridor per L518 from rooms 104 to 111 okay | BOBF | BOBF | | BFR | P | 7887598 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/11/2023 | insulation on ceiling of 1st floor corridor okay, drywall install on ceiling of 2nd floor corridor install complete, Hat channel on ceiling of patios in units 102 through 113 okay | BOBF | BOBF | | BFR | P | 7884615 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/10/2023 | 1st layer drywall install per L518 on 2nf floor corridor okay, 2nd layer drywall istall on 2nd floor to grid 11 okay, insulation and Hat channel install on 3rd floor corridor ceiling to grid 10 okay, Hat channel in unit 201 patio ceiling okay, insulation install to grid 9 on 1st floor corridor ceiling okay | BOBF | BOBF | | BFR | P | 7883454 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/06/2023 | side nails on deck trusses units 209, 215 and 216 okay, 1st layer drywall install per L518 in corridor from unit 201 to 208 okay, observed start of 2nd layer stagger at units 201 and 202, insulation install in 3rd floor corridor from unit 301 to 312 okay | BOBF | BOBF | | BFR | P | 7880540 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 10/05/2023 | lath on north side to grid 16 okay | BOBF | BOBF | | BLA | P | 7879413 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/05/2023 | Hat channel install entire 2nd floor corridor ceiling okay, mock up unit on 2nd floor framing and penetration protection okay except tub trap protection missing, reviewed listed systems with contractor, need to revise floor ceiling system | BOBF | BOBF | | BFR | P | 7879409 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/03/2023 | Rc channel on 2nd floor corridor starting on east end to grid line 10 per L518 okay, girder installation on 4th floor okay, need to attach all trusses to inside corridor wall | BOBF | BOBF | | BFR | P | 7875541 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 10/02/2023 | floor joists above 3rd floor corridor okay, RC channel in 2nd floor corridor not ready | BOBF | BOBF | | BFR | P | 7873714 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BIN | P | 09/28/2023 | insulation on 2nd floor corridor ceiling okay | BOBF | BOBF | | BIN | P | 7871082 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | R | 09/22/2023 | 4th flooe trusses at patios and corridor not ready, need eng to provide required posting and hardware for all girders through out | BOBF | BOBF | | BFR | R | 7865070 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 09/21/2023 | 4 - LVL beams in corridor to supported by tube steel columns with saddles, currently sitting on 6-2x6 posts, rest of floor joists in corridor okay, units 109, 115 and 116 patio trusses missing all side nailing, rest of patio trusses on 3rd floor okay | BOBF | BOBF | | BFR | P | 7864237 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 09/20/2023 | 2nd and 3rd floor balcony framing all units okay | BOBF | BOBF | | BFR | P | 7862471 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 09/19/2023 | floor joist install on 1st and 2nd floor corridors okay | BOBF | BOBF | | BFR | P | 7860866 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BLA | P | 09/18/2023 | lath install on north side of building from grids 2 to 10 okay | BOBF | BOBF | | BLA | P | 7859108 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 09/12/2023 | courtesy visit to review areas for penetration protection and accessibility for type B and Type A units | BOBF | BOBF | | BFR | P | 7853912 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 07/17/2023 | on site review of rated ceiling and sequence needed before mech can be installed below rated ceiling, also reviewed areas of prerock and framing at walls interrupting drywall at rated walls | BOBF | BOBF | | BFR | P | 7799650 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 06/13/2023 | drywall prerock through out okay, prerock at ledger on 1st floor corridor okay | BOBF | BOBF | | BSP | P | 7770146 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 06/02/2023 | East, West and Center stairwell framing and 1st layer gyp inspection ok per UL- U301 / | ERIKK | ERIKK | | BSP | P | 7761101 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 05/10/2023 | courtesy site visit to review progress, framing continues on 1st floor and 2nd floor framing has started, reviewed prerock on est end stair tower | BOBF | BOBF | | BSP | P | 7740760 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 04/26/2023 | Engineer letter on file for voided partition wall framing / | ERIKK | ERIKK | | BSP | P | 7727035 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 04/18/2023 | courtesy site visit, wall framing has started , reviewed rated wall assemblies and inspection process with framer and owner (Alan) | BOBF | BOBF | | BSP | P | 7719635 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 04/06/2023 | courtesy progress visit, CMU shafts are built and appears faming should start soon | BOBF | BOBF | | BSP | P | 7709218 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BSP | P | 02/24/2023 | courtesy site visit, status of construction is foundation and floors have been poured, no additional materials are staged on site, no construction currently being performed | BOBF | BOBF | | BSP | P | 7669998 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BE | P | 12/14/2022 | | RITA | RITA | | BE | P | 7610316 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFI | P | 06/01/2022 | R-10 insulation at remainder of south wing OK -- No insulation at garages -- Training with Ryan F. | DAKOTAB | DAKOTAB | | BFI | P | 7395068 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFI | P | 05/24/2022 | R-10 rigid insulation at 1/2 of south wing at corridor OK -- No insulation at garages | DAKOTAB | DAKOTAB | | BFI | P | 7387233 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFI | P | 05/17/2022 | R-10 rigid insulation at hallway foundation of north wing OK -- No insulation installed at garages | DAKOTAB | DAKOTAB | | BFI | P | 7379113 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFT | P | 05/12/2022 | Open hole on file -- 2400 PSF | DAKOTAB | DAKOTAB | | BFT | P | 7372953 |
BIBLE ELECTRIC, INC. | ES | C | 04/03/2024 | Commercial Service: 600 amp service for "House Panel" OK to set meter and energize. | AARONR | AARONR | | ES | C | 8042050 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 04/01/2024 | FIRE ALARM INSPECTION: fire alarm garage level west side | BRET | BRET | | ER | P | 8039287 |
BIBLE ELECTRIC, INC. | ER | P | 03/29/2024 | Garage level ceiling rough in hallway | RANDY | RANDY | | ER | P | 8037800 |
BIBLE ELECTRIC, INC. | ER | P | 03/26/2024 | 3rd floor gym bath and dressing had lid | BRET | BRET | | ER | P | 8033145 |
BIBLE ELECTRIC, INC. | E= | P | 03/18/2024 | .
Rough inspection in lobby area, leasing offices, bathroom. | RANDY | RANDY | | E= | P | 8024306 |
BIBLE ELECTRIC, INC. | ER | P | 02/22/2024 | soffits in units 314, 315, 317 | RANDY | RANDY | | ER | P | 8002544 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 02/13/2024 | FIRE ALARM INSPECTION: 3rd floor west corridor fa ok | BRET | BRET | | ER | P | 7995088 |
BIBLE ELECTRIC, INC. | ER | P | 02/13/2024 | soffit 310,311 | BRET | BRET | | ER | P | 7995087 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 02/12/2024 | FIRE ALARM INSPECTION: 4th floor west corridor f.a ok | BRET | BRET | | ER | P | 7993812 |
BIBLE ELECTRIC, INC. | ER | P | 02/12/2024 | soffits 309, east and west stairwell hard lids ok | BRET | BRET | | ER | P | 7993809 |
BIBLE ELECTRIC, INC. | ER | P | 02/07/2024 | 214-217 soffits | RANDY | RANDY | | ER | P | 7989562 |
BIBLE ELECTRIC, INC. | ER | P | 02/01/2024 | 1 and 2nd floor common area, 3rd floor gym ok verify plans on conference room floor receptacles maybe required | BRET | BRET | | ER | P | 7984182 |
BIBLE ELECTRIC, INC. | EUG | P | 01/31/2024 | Building 5 electric room stub ups | RANDY | RANDY | | EUG | P | 7982604 |
BIBLE ELECTRIC, INC. | ER | P | 01/30/2024 | soffits 209,210,211,213 | BRET | BRET | | ER | P | 7981578 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 01/24/2024 | FIRE ALARM INSPECTION: west 4th floor unit f.a ok | BRET | BRET | | ER | P | 7976161 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 01/19/2024 | FIRE ALARM INSPECTION: fa ok 2nd floor corridor east of elevator | BRET | BRET | | ER | P | 7972083 |
BIBLE ELECTRIC, INC. | ER | P | 01/19/2024 | 115,116,209 soffits, | BRET | BRET | | ER | P | 7972051 |
BIBLE ELECTRIC, INC. | ER | P | 01/18/2024 | 117 soffit ok 116 not ready | BRET | BRET | | ER | P | 7971156 |
BIBLE ELECTRIC, INC. | ER | P | 01/17/2024 | 113,114 soffit ok | BRET | BRET | | ER | P | 7969637 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 01/16/2024 | FIRE ALARM INSPECTION: 4 th floor east corridor fire alarm only | BRET | BRET | | ER | P | 7969135 |
BIBLE ELECTRIC, INC. | ER | P | 01/16/2024 | soffits 109,110,111,112 | BRET | BRET | | ER | P | 7969134 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 01/10/2024 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 7964373 |
BIBLE ELECTRIC, INC. | ER | P | 01/10/2024 | 4th floor units 309-317 | RANDY | RANDY | | ER | P | 7964241 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 01/03/2024 | FIRE ALARM INSPECTION: 209-217 units f.a ok | BRET | BRET | | ER | P | 7958550 |
BIBLE ELECTRIC, INC. | ER | P | 01/03/2024 | 209 thru 217 install range box in 217 | BRET | BRET | | ER | P | 7958546 |
BIBLE ELECTRIC, INC. | ER | P | 01/03/2024 | 209 thru 217 install range box in 217 | BRET | BRET | | ER | P | 7958547 |
BIBLE ELECTRIC, INC. | ER | P | 12/21/2023 | 3rd floor corridor west side 303-308 soffits and drop ceilings, same with 4th fl | RANDY | RANDY | | ER | P | 7952427 |
BIBLE ELECTRIC, INC. | ER | P | 12/19/2023 | rest of 4th fl south side corridor | RANDY | RANDY | | ER | P | 7949182 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 12/15/2023 | FIRE ALARM INSPECTION: 2nd and 3rd floor | BRET | BRET | | ER | P | 7946601 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 12/15/2023 | FIRE ALARM INSPECTION: 2nd and 3rd floor east corridor | BRET | BRET | | ER | P | 7946602 |
BIBLE ELECTRIC, INC. | ER | P | 12/15/2023 | 301,302 fans, 2nd and 3rd floor east corridor lid ok install min 18x18 access panels for j-boxes | BRET | BRET | | ER | P | 7946596 |
BIBLE ELECTRIC, INC. | EP | P | 12/08/2023 | panels 109-116 | BRET | BRET | | EP | P | 7940195 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 12/08/2023 | FIRE ALARM INSPECTION: unit 109-116 | BRET | BRET | | ER | P | 7940190 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 12/08/2023 | FIRE ALARM INSPECTION: unit 109-116 | BRET | BRET | | ER | P | 7940191 |
BIBLE ELECTRIC, INC. | ER | P | 12/08/2023 | 109- 116 ok 2nd floor corridor | BRET | BRET | | ER | P | 7940182 |
BIBLE ELECTRIC, INC. | ER | P | 12/06/2023 | all garages except 301,201,101 | RANDY | RANDY | | ER | P | 7937570 |
BIBLE ELECTRIC, INC. | ER | P | 12/05/2023 | units 201-204 drop ceilings, garage 101,102,103 ok | BRET | BRET | | ER | P | 7935485 |
BIBLE ELECTRIC, INC. | ER | P | 12/04/2023 | 1st floor east corridor | RANDY | RANDY | | ER | P | 7934659 |
BIBLE ELECTRIC, INC. | ER | P | 12/01/2023 | 4th floor east corridor | BRET | BRET | | ER | P | 7933009 |
BIBLE ELECTRIC, INC. | ER | P | 11/29/2023 | soffits drop ceilings 105 thru 108, 3rd floor east corridor, 1st floor east corridor exterior wall only | BRET | BRET | | ER | P | 7930281 |
BIBLE ELECTRIC, INC. | EP | P | 11/22/2023 | panels 302 thru 308 | BRET | BRET | | EP | P | 7926129 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 11/22/2023 | FIRE ALARM INSPECTION: 302 thru 308 units | BRET | BRET | | ER | P | 7926128 |
BIBLE ELECTRIC, INC. | ER | P | 11/22/2023 | 302 thru 308 units add receptacles to bedroom walls between door and closet, need wall mounted bath fans wired, drop ceiling 102 and 104, garages 303,203,103 | BRET | BRET | | ER | P | 7926124 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 11/09/2023 | FIRE ALARM INSPECTION: 202-208 units rough | BRET | BRET | | ER | P | 7913669 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 11/09/2023 | FIRE ALARM INSPECTION: 202-208 units rough | BRET | BRET | | ER | P | 7913670 |
BIBLE ELECTRIC, INC. | EP | P | 11/09/2023 | unit 202-208 panels ok | BRET | BRET | | EP | P | 7913664 |
BIBLE ELECTRIC, INC. | EP | P | 11/09/2023 | unit 202-208 panels ok | BRET | BRET | | EP | P | 7913665 |
BIBLE ELECTRIC, INC. | ER | P | 11/09/2023 | 202-208 units rough | BRET | BRET | | ER | P | 7913656 |
BIBLE ELECTRIC, INC. | ER | P | 11/08/2023 | 2nd floor east corridor
| RANDY | RANDY | | ER | P | 7913278 |
BIBLE ELECTRIC, INC. | ER | P | 11/03/2023 | Four drop ceilings in unit 101 only / Discussed 36" on vanity receptacles located next to tub/shower / Discussed ADA with contractor | BRETC | BRETC | | ER | P | 7908110 |
BIBLE ELECTRIC, INC. | ER | P | 10/25/2023 | 107, 108 ok | BRET | BRET | | ER | P | 7898798 |
BIBLE ELECTRIC, INC. | ER | P | 10/24/2023 | 101,102,103,104, 106, framing not complete at island, add receptacle to 2nd vanity at master bath, 105 add blocking to SER runs thru walls so it is off the stud and to achieve 1 1/4 spacing, secure cable at range box | BRET | BRET | | ER | P | 7897198 |
BIBLE ELECTRIC, INC. | ER | P | 10/12/2023 | Went over all 3 types of units. --- Discussed layouts, on where receptacles were and were not needed. --- Discussed ADA room for micro receptacle location and hood controls. --- Looked at garage layout and wiring. | AARONR | AARONR | | ER | P | 7885687 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | R | 10/11/2023 | FIRE ALARM INSPECTION: Stopped inspection along with electrical.......................See electrical notes. | AARONR | AARONR | | ER | R | 7884287 |
BIBLE ELECTRIC, INC. | ER | R | 10/11/2023 | Need to address wall spacing on counter tops. --- Receptacles in bathrooms that are not part of the counter top can not be on the bathroom GFCI circuit. --- Need ALL framing complete before we can do electrical inspection. Wall being moved and wiring not complete. --- Need sheet rock off of walls in order to complete inspections. --- Need receptacle installed at end of peninsula.......................Will need to re-inspect all units. | AARONR | AARONR | | ER | R | 7884285 |
BIBLE ELECTRIC, INC. | ER | P | 10/06/2023 | consultation on 2nd fl units | RANDY | RANDY | | ER | P | 7880275 |
BIBLE ELECTRIC, INC. | ER | P | 10/05/2023 | need to add outlet in study room and within 6' of sliding door---------master bed needs outlet within 6' of door------kitchen layout hard to tell if ok---- | RANDY | RANDY | | ER | P | 7879703 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 10/05/2023 | FIRE ALARM INSPECTION: east side FA ok | RANDY | RANDY | | ER | P | 7879405 |
BIBLE ELECTRIC, INC. | ER | P | 09/07/2023 | 201 pre-rock ceiling only | BRET | BRET | | ER | P | 7849892 |
BIBLE ELECTRIC, INC. | ER | R | 08/28/2023 | 301, make up all grounds with pigtails, install cables into panel and terminate grounds, cannot install hall and living room receptacles on kitchen circuit, install smoke wiring to bedroom #3, install bath fans, complete re-inspect | BRET | BRET | | ER | R | 7839420 |
BIBLE ELECTRIC, INC. | ER | P | 07/12/2023 | consultation only | RANDY | RANDY | | ER | P | 7796429 |
BIBLE ELECTRIC, INC. | EUG | P | 05/25/2022 | 3/0 cu ufer | RANDY | RANDY | | EUG | P | 7389657 |
BIBLE ELECTRIC, INC. | EUG | P | 04/22/2022 | ufer north east corner | BRET | BRET | | EUG | P | 7349348 |
AIRTECH MECHANICAL, INC. | HSP | P | 04/29/2024 | ENGINEER LETTER ADDRESS LAUNDRY ROOM, SEE IMAGES / | STEPHANIEV | STEPHANIEV | | HSP | P | 8067307 |
FRONTIER MECHANICAL SYSTEMS INC | HSP | P | 04/25/2024 | ON-SITE MEETING TO DISCUSS BUILT IN BBQ'S / | STEPHANIEV | STEPHANIEV | | HSP | P | 8065126 |
FRONTIER MECHANICAL SYSTEMS INC | HO | P | 04/18/2024 | CONTRACTOR PROCEEDING AT OWN RISK NO APPROVED PLANS SHOW GAS LINE FOR BBQ OR SHOW A BBQ(S), PLAN SPLICE IS REQUIRED. // 10 LB TEST OK ON ADDED 40' OF 3/4" CSST SLEEVED FROM 3/4" STUB OUT ON EXTERIOR BACK OF CLUBHOUSE TO BBQ LOCATION ON PATIO / | STEPHANIEV | STEPHANIEV | | HO | P | 8056741 |
AIRTECH MECHANICAL, INC. | H= | P | 04/12/2024 | DWELLING UNIT FINALS: 115 - NO ACCESS TO BEDROOM. MISSING SUPPLY IN BATHROOM. CELL CORE INSTALLED ON FURNACE EXHAUST VENT PIPE, REPLACE WITH SOLID CORE. / 116, 117 OK //
CORRIDOR MECHANICAL ROOM FINALS: 4TH FLOOR: EAST, MIDDLE AND WEST OK / 3RD FLOOR: MIDDLE - REMOVE SCREW ON SUPPLY DAMPER RETAINING ANGLE. / EAST AND WEST OK / 2ND FLOOR: MIDDLE - REMOVE SCREW ON SUPPLY DAMPER RETAINING ANGLE. / WEST - LABEL DAMPER ACCESS PANEL. / EAST OK / 1ST FLOOR - NOT READY NEED DAMPER ACCESS DOORS LABELED. / THERMOSTATS TO BE INSTALLED / PROVIDE INSTALLATION INSTRUCTIONS FOR CONDENSATE PUMP. QUESTIONING VINYL TUBING CONNECTION TO PVC. /
| STEPHANIEV | STEPHANIEV | | H= | P | 8050950 |
AIRTECH MECHANICAL, INC. | H= | P | 04/08/2024 | PROVIDE STAMPED LETTER FROM ENGINEER DELETING MAKEUP AIR FOR LAUNDRY ROOM // DWELLING UNIT FINALS: 110 - SUCTION LINE MISSING INSULATION IN MECHANICAL ROOM / 113 - MISSING SUPPLY IN KITCHEN / 212- BATHROOM ROOM MISSING SUPPLY. MASTER WATER CLOSET EXHAUST FAN FLEX DAMAGED, REPAIR. / 213 - MISSING SUPPLY IN BATHROOM AND IN LAUNDRY ROOM. SEAL LINESET INSULATION AT WALL IN MECH ROOM. / 214 - SEAL LINESET INSULATION AT WALL IN MECH ROOM / 316 - MISSING SUPPLY IN WALK-IN CLOSET. / 317 - MISSING SUPPLY IN LAUNDRY ROOM. /// 109,111,112, 209, 210, 211, 215, 216, 217 OK / NO CONDENSERS YET / | STEPHANIEV | STEPHANIEV | | H= | P | 8045627 |
FRONTIER MECHANICAL SYSTEMS INC | HSP | P | 04/04/2024 | QUESTION REGARDING IF THE REGULATOR LOCATED IN THE CLUBHOUSE BATHROOM CEILING HAS ADEQUATE VOLUME AND VENTILATION FOR REGULATOR PER MANUFACTURER, / QUESTION REGARDING REGULATOR IN 3RD FLOOR CAVITY IN FITNESS CENTER BATHROOM, CAVITY WHERE REGULATOR IS LOCATED IS PACKED WITH INSULATION. IS THE SPACE ADEQUATE FOR REGULATOR VENT LIMITER, PER MANUFACTURER INSULATION INSTRUCTION "A REGULATOR WITH VENT LIMITING MEANS SHALL BE INSTALLED IN A VENTILATED SPACE ONLY,"/ QUESTIONING IF THE CORRIDOR REGULATORS HAVE ADEQUATE VENTILATION AS WELL. / PLEASE SEND RFI TO ENGINEER ASKING ABOUT THE LOCATION OF THESE REGULATORS AND IF THEY ARE ALLOWED TO BE INSTALLED IN THOSE LOCATIONS / WILL NEED A ENGINEER STAMPED RESPONSE / | STEPHANIEV | STEPHANIEV | | HSP | P | 8042543 |
AIRTECH MECHANICAL, INC. | H= | P | 04/03/2024 | DWELLING UNIT FINALS: 310 - MISSING SUPPLY AIR IN LAUNDRY ROOM AND GREAT ROOM / 311 - MISSING SUPPLY AIR IN LAUNDRY ROOM / 314 - PROPERLY SEAT FURNACE EXHAUST VENT PIPE AND REPLACE MARKED FITTINGS / 316 AND 317 NOT READY // 309, 312, 313, 315 OK / | STEPHANIEV | STEPHANIEV | | H= | P | 8042087 |
AIRTECH MECHANICAL, INC. | HD | P | 04/03/2024 | 1ST FLOOR MIDDLE CORRIDOR DUCT ROUGH: ALL OK / 3RD FLOOR EXERCISE DUCT ROUGH: ALL OK / 1ST FLOOR CLUBHOUSE DUCT ROUGH: ALL OK / | STEPHANIEV | STEPHANIEV | | HD | P | 8042076 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 04/03/2024 | Update 4/17/24 Addition of 2PSI note for meters. ALL GAS INSIDE IS NOW OK / OK TO SET 2LB DWELLING UNIT METERS / | STEPHANIEV | STEPHANIEV | | HC | C | 8042070 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 04/03/2024 | | STEPHANIEV | STEPHANIEV | | HI | C | 8042065 |
AIRTECH MECHANICAL, INC. | H= | P | 04/02/2024 | DWELLING UNIT FINALS: 201, 204, 301-308 OK / NO CONDENSERS YET / | STEPHANIEV | STEPHANIEV | | H= | P | 8040458 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 04/01/2024 | Update 4/17 WH: Ok to release all 2 LB meters for apartments / Will need meter verification letters for apartments units by final / OK TO SET ALL METERS FOR APARTMENT UNITS - 24 ON EAST END AND 27 ON WEST END / 12 ON EAST END ALREADY SET OK TO UNLOCK / | STEPHANIEV | STEPHANIEV | | HC | C | 8038723 |
AIRTECH MECHANICAL, INC. | H= | P | 04/01/2024 | PROVIDE STAMPED LETTER FROM ENGINEER DELETING MAKEUP AIR FOR LAUNDRY ROOMS /// DWELLING UNIT FINALS: 101-108 OK / 202, 203, 205, 206, 207, 208 OK / NO CONDENSERS YET / | STEPHANIEV | STEPHANIEV | | H= | P | 8038715 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 03/29/2024 | GAS FOR 1ST FLOOR CORRIDOR OK / | STEPHANIEV | STEPHANIEV | | HI | P | 8037291 |
AIRTECH MECHANICAL, INC. | H= | P | 03/29/2024 | DWELLING UNIT FINALS: 108-101 AND 208-201 RE-INSPECT ALL / ALL UNITS MISSING MAKE-UP FOR LAUNDRY ROOM, PLANS SHOW A 12 X 12 DOOR GRILLE INSTALL PER PLAN. LABELING FOR DRYER EXHAUST LENGTH MUST HAVE A PERMANENT LABEL OR TAG. ALL EXPOSED COPPER FOR SUCTION LINE MUST BE INSULATED AND SEALED. FURNACE FILTER AND FILTER COVER (DOOR) TO BE IN PLACE. WILL NEED ACCESS TO ALL UNITS, ALL DOORS TO BE UNLOCKED AND PLASTIC TO ROOMS REMOVED. / | STEPHANIEV | STEPHANIEV | | H= | P | 8036929 |
AIRTECH MECHANICAL, INC. | HSP | P | 03/28/2024 | ENGINEER LETTER REMOVING FIRE DAMPERS IN CLUBHOUSE AND FITNESS CENTER RECEIVED, SEE IMAGES / WAITING ON SPLICE TO BE APPROVED FROM PLAN REVIEW / | STEPHANIEV | STEPHANIEV | | HSP | P | 8036722 |
AIRTECH MECHANICAL, INC. | HD | P | 03/28/2024 | CORRIDOR FIRE DAMPER INSPECTION: 1ST FLOOR EAST END - SUPPLY AND RETURN RETAINING ANGLES AND BREAKAWAY CONNECTION OK / 1ST FLOOR MIDDLE - SUPPLY AND RETURN RETAINING ANGLES AND BREAKAWAY CONNECTION OK / 1ST FLOOR WEST END - REMOVE SCREWS THAT ARE FASTENING ANGLE TO WALL IN MECH ROOM. RETURN RETAINING ANGLE AND BREAKAWAY CONNECTION OK / | STEPHANIEV | STEPHANIEV | | HD | P | 8036721 |
AIRTECH MECHANICAL, INC. | H= | P | 03/28/2024 | FURTHER RESEARCH REQUIRED, WILL UPDATE NOTES IN THE MORNING / | STEPHANIEV | STEPHANIEV | | H= | P | 8036720 |
AIRTECH MECHANICAL, INC. | H= | P | 03/27/2024 | 2 ND FLOOR EAST WING INTERIOR GUEST ROOM FINALS: 101 THROUGH 108 ARE NOW OK.//////EXCEPT MISSING MAKE UP AIR SHOWN ON PLANS OK TO ATTACH PICTURES AT NEXT INSPECTION REQUEST.////// DRYER DUCT LENGTH IDENTIFIED IN DRYER BOX, NO CONDENSERS YET. | TREVORH | TREVORH | | H= | P | 8034989 |
AIRTECH MECHANICAL, INC. | HD | P | 03/26/2024 | 1ST FLOOR CLUBHOUSE DUCT ROUGH: SPLICE BEING SUBMITTED FOR FIRE DAMPERS BEING REMOVED IN MECHANICAL ROOM ///
SEAL BRANCH LINE OFF MAIN TRUNK LINE FOR BATHROOM S/ BATH EXHAUST FAN TO BE INSTALLED /
OUTSIDE AIR DUCT FROM EXTERIOR WALL TO MECH WALL OK, OK TO INSULATE. / SUPPLY MAIN TRUNK LINE ONLY FROM MECH ROOM TO END CAP OK. / FURNACE VENT PIPES OK. / | STEPHANIEV | STEPHANIEV | | HD | P | 8032997 |
AIRTECH MECHANICAL, INC. | HD | P | 03/22/2024 | 3RD FLOOR EXERCISE DUCT ROUGH: CONNECT BATH EXHAUST FAN TO DUCT. INSTALL SUPPLY BOOTS IN BATHROOM // SPLICE BEING SUBMITTED FOR FIRE DAMPERS BEING REMOVED IN MECHANICAL ROOM / | STEPHANIEV | STEPHANIEV | | HD | P | 8030171 |
AIRTECH MECHANICAL, INC. | HD | P | 03/20/2024 | CORRIDOR FIRE DAMPER FRAMING: 1ST FLOOR EAST END RETURN OK TO INSTALL DAMPER /
3RD FLOOR EXERCISE DUCT ROUGH: QUESTIONING SUPPLY, RETURN AND OUTSIDE AIR PENETRATION THROUGH WALL NEEDS PROTECTION. PLAN PAGE M1.4 DATED 11/30/22 SHOWS FIRE DAMPERS. PLAN PAGE M1.4 DATED 11/3/23 SHOWS NO FIRE DAMPERS, CHANGES MADE WERE NOT CLOUDED. / TWO 6" SUPPLY FROM EXERCISE ROOM UP TO 4TH FLOOR STORAGE WILL NEED TO BE SHOWN ON PLANS, SPLICE REQUIRED. QUESTIONING IF THOSE PENETRATIONS THROUGH WALL WILL NEED PROTECTION. /
OUTSIDE AIR DUCT FROM EXTERIOR WALL TO MECH WALL OK, OK TO INSULATE. / SUPPLY MAIN TRUNK LINE ONLY FROM MECH ROOM TO END CAP OK. / FURNACE VENT PIPES OK. / | STEPHANIEV | STEPHANIEV | | HD | P | 8027394 |
AIRTECH MECHANICAL, INC. | HD | P | 03/07/2024 | CORRIDOR FIRE DAMPER FRAMING: 1ST FLOOR WEST END AND MIDDLE OK TO INSTALL DAMPERS / 1ST FLOOR EAST END SUPPLY OK. RETURN RE-FRAME /
CORRIDOR FIRE DAMPER INSPECTION: 4TH FLOOR WEST ACROSS FROM UNIT 314-315 - SUPPLY AND RETURN RETAINING ANGLES AND BREAKAWAY CONNECTION OK / 4TH FLOOR MIDDLE - SUPPLY RETAINING ANGLES AND BREAKAWAY OK / 3RD FLOOR WEST ED ACROSS FROM 214-215 - SUPPLY AND RETURN RETAINING ANGELS AND BREAKAWAY CONNECTION OK / 3RD FLOOR EAST END ACROSS FROM 203-204 - RETURN RETAINING ANGLES AND BREAKAWAY OK / 2ND FLOOR WEST END ACROSS FROM 114-115 - SUPPLY AND RETURN RETAINING ANGLES AND BREAKAWAY CONNECTIONS OK / | STEPHANIEV | STEPHANIEV | | HD | P | 8017481 |
AIRTECH MECHANICAL, INC. | HD | P | 03/06/2024 | CORRIDOR FIRE DAMPER INSPECTION: 4TH FLOOR MIDDLE ACROSS FROM UNIT 308-STORAGE - SUPPLY REMOVE SCREWS THAT FASTEN ANGLE TO WALL IN MECH ROOM / 3RD FLOOR WEST ACROSS 114-115 - SUPPLY AND RETURN NOT COMPLETE. MISSING SCREWS. REMOVE SCREW FROM TOP BREAKAWAY CONNECTION / 3RD FLOOR EAST END ACROSS FROM 203-204 - SUPPLY RETAINING ANGLES AND BREAKAWAY OK. RETURN STILL NOT READY MISSING SCREWS AND REMOVE SCREW ON TOP BREAKAWAY./ 2ND FLOOR MIDDLE ACROSS FROM 108- CLUBHOUSE - SUPPLY RETAINING ANGLES AND BREAKAWAY CONNECTION OK. / 2ND FLOOR EAST END ACROSS FROM 103-104 - SUPPLY AND RETURN RETAINING ANGLES AND BREAKWAY CONNECTION OK. / //// STILL NEED TO SEE BREAKAWAY CONNECTION AND LABELED ACCESS DOOR IN MECHANICAL ROOMS / ///// CONTRACTOR TO MAKE SURE FIRE DAMPER ANGLES AND BREAKAWAY CONNECTION ARE READY PRIOR TO INSPECTION/ | STEPHANIEV | STEPHANIEV | | HD | P | 8015875 |
AIRTECH MECHANICAL, INC. | HD | P | 03/05/2024 | CORRIDOR FIRE DAMPER INSPECTION: 4TH FLOOR MIDDLE ACROSS FROM UNIT 308-STORAGE - SUPPLY RETAINING ANGLES OK - STILL NEED BREAKAWAY CONNECTION IN CORRIDOR / 3RD FLOOR MIDDLE ACROSS 208-FITNESS - SUPPLY RETAINING ANGLES AND BREAKAWAY OK / 3RD FLOOR EAST END ACROSS FROM 203-204 - SUPPLY MISSING SCREWS. RETURN NOT READY / 2ND FLOOR MIDDLE ACROSS FROM 108- CLUBHOUSE - MISSING SCREWS / 2ND FLOOR EAST END ACROSS FROM 103-104 - SUPPLY AND RETURN MISSING SCREWS / //// STILL NEED TO SEE BREAKAWAY CONNECTION AND LABELED ACCESS DOOR IN MECHANICAL ROOMS / ///// CONTRACTOR TO MAKE SURE FIRE DAMPER ANGLES AND BREAKAWAY CONNECTION ARE READY PRIOR TO INSPECTION/ | STEPHANIEV | STEPHANIEV | | HD | P | 8014533 |
AIRTECH MECHANICAL, INC. | HD | P | 03/04/2024 | CORRIDOR FIRE DAMPER INSPECTION: 4TH FLOOR EAST END ACROSS FROM 303-304 - SUPPLY AND RETURN RETAINING ANGLES AND BREAKAWAY CONNECTION OK (by final will need access door labeled) | STEPHANIEV | STEPHANIEV | | HD | P | 8012953 |
AIRTECH MECHANICAL, INC. | HD | P | 02/26/2024 | BELOW CEILING INSPECTION: 316 AND 317 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 8005650 |
AIRTECH MECHANICAL, INC. | HD | P | 02/23/2024 | BELOW CEILING INSPECTION: 316 - NOT READY MISSING SUPPLYS IN LAUNDRY ROOM AND BATHROOMS. BATH EXHAUST FANS TO BE CONNECT TO DUCT. / 317 - EAST BATHROOM EXHAUST FAN DUCT IS DISCONNECTED, MECHANICALLY FASTEN AND SEAL JOINT. / | STEPHANIEV | STEPHANIEV | | HD | P | 8004433 |
AIRTECH MECHANICAL, INC. | HD | P | 02/22/2024 | BELOW CEILING INSPECTION: 316 - NOT READY / 317 - EAST BATHROOM EXHAUST FAN DUCT MUST PENETRATE THROUGH A DOUBLE TOP PLATE. ONE OF THE TOP PLATES HAS BEEN REMOVED, RE-INSTALL PLATE. / 315 - OK / | STEPHANIEV | STEPHANIEV | | HD | P | 8003377 |
AIRTECH MECHANICAL, INC. | HD | P | 02/21/2024 | BELOW CEILING INSPECTION: 315 AND 317 NOT READY. MISSING SUPPLY IN LAUNDRY ROOMS AND BATHROOMS. BATH EXHAUST FANS TO BE CONNECTED TO DUCT./ | STEPHANIEV | STEPHANIEV | | HD | P | 8002032 |
AIRTECH MECHANICAL, INC. | HD | P | 02/20/2024 | BELOW CEILING INSPECTION: 313, 314 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 8000616 |
AIRTECH MECHANICAL, INC. | HD | P | 02/15/2024 | BELOW CEILING INSPECTION: 312 OK /
CORRIDOR FIRE DAMPER FRAMING: 1ST FLOOR : NOT READY / 2ND FLOOR: ALL SUPPLY AND RETURNS OK, OK TO INSTALL DAMPER / 3RD FLOOR: ALL SUPPLY AND RETURNS OK, OK TO INSTALL DAMPER / 4TH FLOOR: ACROSS FROM UNIT 303-304 - SUPPLY NEEDS SHEETROCK TO COVER ALL WOOD STUD SURFACES WITHIN OPENING. RETURN OK. / ACROSS FROM UNIT 308-STORAGE - SUPPLY SHEETROCK IS BROKEN, REPLACE MUD AND TAPE. RETURN OK. / ACROSS FROM UNIT 314-315 - SUPPLY AND RETURN OK, OK TO INSTALL DAMPER. /// WILL NEED TO SEE DAMPER INSTALLED, BREAKAWAY CONNECTIONS, RETAINING ANGLES AND LABELED ACCESS DOOR / | STEPHANIEV | STEPHANIEV | | HD | P | 7997478 |
AIRTECH MECHANICAL, INC. | HD | P | 02/12/2024 | BELOW CEILING INSPECTION: 309, 310, 311 OK / CORRIDOR FIRE DAMPER FRAMING: 4TH AND 3RD FLOOR - VERIFY ALL SHEETROCK IS COVERING ALL WOOD STUD SURFACES WITHIN OPENING. // 3RD FLOOR ACROSS FROM UNIT 208-FITNESS AND ACROSS FROM UNIT 203-204: SUPPLY AND RETURN OK, OK TO INSTALL DAMPER. / | STEPHANIEV | STEPHANIEV | | HD | P | 7993341 |
AIRTECH MECHANICAL, INC. | HD | P | 02/09/2024 | CORRIDOR FIRE DAMPER FRAMING: 1ST FLOOR: WEST END - RETURN NEEDS TO BE PROPERLY FRAMED AND SCREWED. SUPPLY ADD SCREWS/ CENTER - SUPPLY AND RETURN RE-FRAME AND ADD SCREWS / EAST END - SUPPLY PROPERLY SECURE STUD TO STRUCTURE AND ADD SCREWS. RETURN ADD SCREWS. / 2ND FLOOR: ACROSS FROM UNIT 103-104 - SUPPLY AND RETURN ADD SCREWS. /ACROSS FROM UNIT 108 -CLUBHOUSE - SUPPLY AND RETURN ADD SCREWS / ACROSS FROM UNIT 114-115 - SUPPLY AND RETURN ADD SCREWS/ 3RD FLOOR: ACROSS FROM UNIT 203-204 - RETURN ADD SCREWS AND REPLACE RIGHT SIDE KICKER. SUPPLY ADD SCREWS. / ACROSS FROM UNIT 208-FITNESS - SUPPLY FRAME TO PROPER SIZE AND ADD SCREWS. RETURN ADD SCREWS. / ACROSS FROM UNIT 214-215 - SUPPLY AND RETURN ADD SCREWS. 4TH FLOOR: ACROSS FROM UNIT 303-304 - SUPPLY AND RETURN ADD SCREWS. / ACROSS FROM UNIT 308-STORAGE - SUPPLY FRAME TO PROPER SIZE AND ADD SCREWS. RETURN ADD SCREWS / ACROSS FROM UNIT 314-315 - SUPPLY REPLACE WITH FULL STUD ON TOP ADD SCREWS. RETURN ADD SCREWS. //// OK TO SHEETROCK, MUD AND TAP ALL FIRE DAMPER OPENINGS / | STEPHANIEV | STEPHANIEV | | HD | P | 7992122 |
AIRTECH MECHANICAL, INC. | HD | P | 02/06/2024 | BELOW CEILING INSPECTION: 217 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7987991 |
AIRTECH MECHANICAL, INC. | HD | P | 02/05/2024 | BELOW CEILING INSPECTION: 214, 215, 216 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7987267 |
AIRTECH MECHANICAL, INC. | HD | P | 01/31/2024 | FIRE DAMPER FRAME INSPECTION: 4TH FLOOR SUPPLY WAS NOT FRAMED PER MANUFACTURERS REQUIREMENTS. WENT OVER CORRECT FRAMING WITH CONTRACTOR. / BELOW CEILING INSPECTION: 211, 212, 213 OK / WEST CORRIDOR DUCT INSPECTION: 4TH FLOOR ACROSS FROM 314-315 SUPPLY TRUNK LINE AND LATERAL RUNS OK, NO DAMPER / CENTER CORRIDOR DUCT INSPECTION: 2ND FLOOR ACROSS FROM CENTER STAIRWELL SUPPLY TRUNK LINE AND LATERAL RUNS OK, NO DAMPERS / 4TH FLOOR APARTMENT VENTS: 306, 307, 308, 314, 315, 316, 317 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7982699 |
AIRTECH MECHANICAL, INC. | HD | P | 01/30/2024 | CONTRACTOR PROCEEDING AT OWN RISK FOR CORRIDOR DUCT LAYOUT, PLAN SPLICE REQUIRED FOR CORRIDOR DUCT SIZING AND LAYOUT / EAST CORRIDOR DUCT INSPECTION: 4TH FLOOR ACROSS FROM 303-304 SUPPLY TRUNK LINE AND LATERAL RUNS OK, NO DAMPER / WEST CORRIDOR DUCT INSPECTION: 3RD FLOOR ACROSS FROM 214-215 SUPPLY TRUNK LINE AND LATERAL RUNS OK, NO DAMPER. 2ND FLOOR ACROSS FROM 114-115 SUPPLY TRUNK LINE AND LATERAL RUNS OK, NO DAMPER. / BELOW CEILING INSPECTION: 213 MASTER BATH EXHAUST FAN CAN TO BE FLUSH WITH DRYWALL / | STEPHANIEV | STEPHANIEV | | HD | P | 7981434 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 01/30/2024 | CONTRACTOR PROCEEDING AT OWN RISK NO APPROVED PLANS SHOW GAS LINE FOR BBQ OR SHOW A BBQ(S?), PLAN SPLICE REQUIRED / 10 LB TEST OK ON ADDED 42' OF 3/4" SCHEDULE 40 BLACK PIPE FROM CLUBHOUSE MECHANICAL ROOM TO EXTERIOR BACK OF CLUBHOUSE FOR BBQ ON PATIO / QUESTIONING RELOCATION OF REGULATOR IN RATED GARAGE CEILING NOW FOR CLUBHOUSE FIREPLACE / | STEPHANIEV | STEPHANIEV | | HI | P | 7981422 |
AIRTECH MECHANICAL, INC. | HD | P | 01/29/2024 | BELOW CEILING INSPECTION: 209, 210 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7979912 |
AIRTECH MECHANICAL, INC. | HD | P | 01/19/2024 | BELOW CEILING INSPECTION: 115 OK. | NANCY | NANCY | | HD | P | 7972388 |
AIRTECH MECHANICAL, INC. | HD | P | 01/18/2024 | BELOW CEILING INSPECTION: 113, 114, 116 AND 117 OK. | NANCY | NANCY | | HD | P | 7971604 |
AIRTECH MECHANICAL, INC. | HRP | P | 01/17/2024 | 200 LB TEST OK ON ALL NORTH WEST LINE SETS, AT NEXT INSPECTION REQUEST WILL NEED TO SEE TEST FOR 311 | TREVORH | TREVORH | | HRP | P | 7969668 |
AIRTECH MECHANICAL, INC. | HD | P | 01/17/2024 | ABOVE CEILING ROUGH : GUEST ROOM 113 OK, OK FOR PICTURE OF COMPLETED BOOT. | TREVORH | TREVORH | | HD | P | 7969659 |
AIRTECH MECHANICAL, INC. | HD | P | 01/16/2024 | BELOW CEILING INSPECTION: 109, 110, 111 AND 112 OK | NANCY | NANCY | | HD | P | 7968496 |
AIRTECH MECHANICAL, INC. | HRP | P | 01/11/2024 | LINESET PRESSURE TEST: 301, 302, 303, 304, 305, 306, 307, 308, ALL OK / | STEPHANIEV | STEPHANIEV | | HRP | P | 7965738 |
AIRTECH MECHANICAL, INC. | HD | P | 01/11/2024 | 4TH FLOOR APARTMENT VENTS: NEED ACCESS TO VERIFY VENTS IN 306, 307, 308 - COVERED PRIOR TO INSPECTION / 309, 310, 311, 312, 313 OK /
CORRIDOR INSPECTION FOR APARTMENT VENTS: 201, 109, 110, 111, 112, 113, 114, 115, 116, 117 OK /
EAST CORRIDOR DUCT INSPECTION: 3RD FLOOR ACROSS FROM 203-204 SUPPLY TRUNK LINE AND LATERAL RUNS OK, NO DAMPER, WILL NEED SPLICE FOR NEW LAYOUT / 2ND FLOOR ACROSS FROM 103-104 SUPPLY TRUNK LINE AND LATERAL RUNS OK, NO DAMPER, WILL NEED SPLICE FOR NEW LAYOUT / | STEPHANIEV | STEPHANIEV | | HD | P | 7965734 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 01/05/2024 | WILL NEED TO VERIFY FINAL CONNECTIONS AT FURNACES AND REGULATORS AT FINAL / | STEPHANIEV | STEPHANIEV | | HI | P | 7961671 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 01/05/2024 | Update 4/17 WH: OK TO RELEASE 2 LB METERS FOR ALL APARTMENT UNITS / OK TO RELEASE METERS FOR ALL APARTMENT UNITS / | STEPHANIEV | STEPHANIEV | | HC | C | 7961642 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 01/05/2024 | 10 LB TEST OK ON DWELLING UNITS 209-217 / | STEPHANIEV | STEPHANIEV | | HI | P | 7961641 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 01/05/2024 | WEST SIDE GAS RISERS IN OUTER WALL FOR APARTMENTS AND CORRIDORS ALL OK / WEST SIDE 3RD FLOOR DWELLING UNITS: 209-217 INSTALL OK / | STEPHANIEV | STEPHANIEV | | HI | P | 7960774 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 12/21/2023 | 109 - 10 LB TEST AND INSTALL OK / | STEPHANIEV | STEPHANIEV | | HI | P | 7952403 |
AIRTECH MECHANICAL, INC. | HRP | P | 12/21/2023 | GROUND LEVEL CLUBHOUSE LINESET WILL REQUIRE PRESSURE TEST AND NEEDS TO BE FULLY INSULATED AND SEALED IN WALL / GROUND LEVEL WEST END FURNACE OK / | STEPHANIEV | STEPHANIEV | | HRP | P | 7951472 |
AIRTECH MECHANICAL, INC. | HD | P | 12/21/2023 | BELOW CEILING INSPECTION: 306 AND 308 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7951463 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | P | 12/21/2023 | PROVIDE SPLICE FOR CORRIDOR FURNACE CONDENSATE DRAINS / WEST CORRIDOR CONDENSATE FOR FURNACES ACROSS FROM 144. 214, AND 314. 5 LB TEST AND INSTALL OK / | STEPHANIEV | STEPHANIEV | | HWP | P | 7951461 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 12/21/2023 | 109 - REPLACE CUPLING IN CEILING OF 111 AND RETEST / 10 LB TEST AND INSTALL OK FOR 110-117 / WEST CORRIDOR FURANCE ACROSS FROM APARTMENT UNITS 114-115 GAS ABOVE CEILING INTO MECHANICAL ROOM OK / | STEPHANIEV | STEPHANIEV | | HI | P | 7951455 |
AIRTECH MECHANICAL, INC. | HD | P | 12/20/2023 | BELOW CEILING INSPECTION: 301, 302, 303, 304, 305, 307 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7950008 |
AIRTECH MECHANICAL, INC. | HRP | P | 12/20/2023 | GROUND LEVEL EAST END CORRIDOR FURNACE / | STEPHANIEV | STEPHANIEV | | HRP | P | 7950005 |
AIRTECH MECHANICAL, INC. | HRP | P | 12/19/2023 | PRESSURE TEST WILL BE REQUIRED FOR ALL 300 UNITS, 209, 211, 213, 109, AND WEST END CORRIDOR FURNACE ACROSS FROM APARTMENTS 214-215 / 108-117 OK. EXCEPT 113 ISOLATE COPPER FROM NAIL PLATE. 208-217 OK. UPPER FITNESS CENTER FURNACE OK / | STEPHANIEV | STEPHANIEV | | HRP | P | 7948672 |
AIRTECH MECHANICAL, INC. | HD | P | 12/19/2023 | 303 - MECHANICALLY FASTEN ALL BATH EXHAUST DUCTS THEN SEAL WITH TAPE / 304 - MECHANICALLY FASTEN BATH EXHAUST DUCTS THEN SEAL WITH TAPE / 305 - NOT READY / | STEPHANIEV | STEPHANIEV | | HD | P | 7948667 |
AIRTECH MECHANICAL, INC. | HD | P | 12/15/2023 | HAVE SPLICES BEEN SUBMITTED YET FOR THE CHANGE IN SIZE OF DUCTS INSTALLED IN DWELLING UNITS? BELOW CEILING INSPECTION: 301 - MECHANICALLY FASTEN ALL BATH EXHAUST DUCTS THEN SEAL WITH TAPE. 302 - MECHANICALLY FASTEN ALL BATH EXHAUST DUCTS THEN SEAL WITH TAPE. IN MASTER BATH SEAL MISSED JOINT AT FAN CAN. OK TO SEND PICTURES OF CORRECTIONS FOR 301 AND 302: CORRIDOR INSPECTION FOR APARTMENT VENT AND LINESET: 201 - VENT PIPES BACK GRADED AT CORRIDOR WALL. LINESET OK. | NANCY | NANCY | | HD | P | 7946250 |
AIRTECH MECHANICAL, INC. | HSP | P | 12/11/2023 | Comments added to clarify what apartment inspections have been completed. ABOVE LID INSPECTIONS: ALL DWELLING UNITS OK / BELOW CEILING INSPECTIONS: 101 - 108, 201 - 208 / CORRIDOR INSPECTION FOR APARTMENT VENTS AND LINESETS ONLY: 101 - 108 , 202 - 208 / No mechanical rooms have been looked at. | STEPHANIEV | STEPHANIEV | | HSP | P | 7940863 |
AIRTECH MECHANICAL, INC. | HD | P | 12/07/2023 | BELOW CEILING INSPECTION: 205, 208 OK / CORRIDOR INSPECTION FOR APARTMENT VENTS AND LINESETS ONLY: 105, 107,108, 202, 203, 204, 205, 206, 207, 208 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7939289 |
AIRTECH MECHANICAL, INC. | HD | P | 12/06/2023 | BELOW CEILING INSPECTION: 201, 203, 206, 207 OK / ABOVE CEILING INSPECTION: ALL DWELLING UNITS OK. 308, 310, 311 OK. / CORRIDOR INSPECTION FOR APARTMENT VENTS AND LINESETS ONLY: 105 STRAP MAX EVERY 5 FEET. 101, 102, 103, 104, 106 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7937038 |
AIRTECH MECHANICAL, INC. | HD | P | 12/05/2023 | BELOW CEILING INSPECTION: 203 RELOCATE RETURN AIR TRANSFER GRILLE, NOT ALIGNED IN SAME STUD BAY. DUCTS BELOW RATED CEILING ALL OK / 202 AND 204 OK / ABOVE CEILING INSPECTION: 308 INSTALL ELBOW AT BATH EXHAUST PENETRATIONS. 310 AND 311 SUPPORT DRYER EVERY 4 FEET / 306, 307, 312, 313, 314, 315 ALL OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7935622 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 12/04/2023 | WEST SIDE 4TH FLOOR DWELLING UNITS: ADD SUPPORT IN 316, 311, 210, 309 . SUPPORT RISERS ON 3RD AND 4TH FLOORS / 10 LB TEST OK ON 317-309 / WEST END CORRIDOR FURNACES: 10 LB TEST OK ON LEVELS 1, 2, 3, AND 4 / STILL NEED TO SEE REGULATORS INSTALLED / FIREPLACE: LEAK TEST OK / | STEPHANIEV | STEPHANIEV | | HI | P | 7934199 |
AIRTECH MECHANICAL, INC. | HD | P | 12/01/2023 | BELOW CEILING INSPECTION: 108, 202, 204 - OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7932974 |
AIRTECH MECHANICAL, INC. | HD | P | 11/30/2023 | BELOW CEILING INSPECTION: 108 COVERED PRIOR TO INSPECTION, REMOVE SHEETROCK / ABOVE LID INSPECTIONS: 308, 307, 306 - EXTEND BATH EXHAUST DUCT THROUGH ROOF DECK. / 309, 305, 304, 303 - OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7931471 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 11/28/2023 | 10 LB TEST OK ON GAS LINE TO FIREPLACE / COMPLETE CONCEALED GAS CONNECTION AT FIREPLACE AND CALL FOR LEAK TEST INSPECTION PRIOR TO COVERING / | STEPHANIEV | STEPHANIEV | | HI | P | 7928855 |
AIRTECH MECHANICAL, INC. | HSP | P | 11/27/2023 | By final need splice showing correct sizing of apartment ducts / Still need splice showing condensate installation and termination locations for all furnaces / | STEPHANIEV | STEPHANIEV | | HSP | P | 7928104 |
AIRTECH MECHANICAL, INC. | HSP | P | 11/27/2023 | Comments added to clarify what apartment inspections have been completed. / BELOW CEILING INSPECTIONS: 101 -107 / ABOVE LID INSPECTIONS: 101- 117, 201- 217, 301, 302, 316, 317 / No mechanical rooms, no furnace vent pipes, no linesets across corridor into mechanical room have been looked at / | STEPHANIEV | STEPHANIEV | | HSP | P | 7928085 |
AIRTECH MECHANICAL, INC. | HD | P | 11/27/2023 | BELOW CEILING INSPECTION: 106, 107 - OK / ABOVE CEILING INSPECTION: 316 - OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7927471 |
AIRTECH MECHANICAL, INC. | HD | P | 11/22/2023 | BELOW CEILING INSPECTION: 103, 105 - OK. 106, 107 INSTALL BATH FANS AND SUPPLIES WHEN GRID-X IS INSTALLED. OK TO ATTACH IMAGES / ABOVE LID INSPECTION: 117, 217, 317 - OK / LINESET INSPECTION IN EXTERIOR CORRIDOR WALL: 109, 209 - OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7926490 |
AIRTECH MECHANICAL, INC. | HD | P | 11/20/2023 | BELOW CEILING INSPECTION: 104 - OK. 105 - NOT READY, REINSPECT ALL. ABOVE CEILING INSPECTION: 214, 215 AND 216 - ALL OK. DRYER EXHAUST DUCT IN WALL: 113, 206 AND 213 - ALL OK. CORRIDOR UNITS, EAST SIDE, INSPECTION OF VENT PIPES ONLY FOR TEMP HEAT: LEVEL 3 (#200'S APTS) - FAR EAST UNIT - OK. UNIT ACROSS FROM 203/204 APTS BACK GRADED AT WALL. LEVEL 4 (#300 APTS) - FAR EAST UNIT - OK. UNIT ACROSS FROM 203/204 APTS. BACK GRADED AT WALL. | NANCY | NANCY | | HD | P | 7923572 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 11/20/2023 | BY FINAL LABEL ALL VISIBLE MEDIUM PRESSURE GAS LINES AND INSTALL ACCESS DOORS FOR ALL REGULATORS LOCATED ABOVE GRID X CEILINGS. CORRIDOR FURNACES, EAST SIDE, LEVELS 2, 3 AND 4: LEAK TESTED GAS LINES FROM SHUTOFFS IN CORRIDOR CEILING TO UNITS. REGULATORS INSTALLED. | NANCY | NANCY | | HI | P | 7923550 |
AIRTECH MECHANICAL, INC. | HD | P | 11/17/2023 | BELOW CEILING INSPECTION: 103 - INSTALL SUPPLY INTO LAUNDRY / RE-STRAP TRUNK LINE IN LIVING ROOM / SEAL TRUNK LINE TRANSITION IN LIVING ROOM / OK TO SEND PICTURES OF CORRECTIONS // ABOVE LID INSPECTION: 114, 115. 116 - OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7922541 |
AIRTECH MECHANICAL, INC. | HD | P | 11/15/2023 | ABOVE LID INSPECTION: 105, 205, 207, 209, 210, 211, 212, 213, 302 - OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7919332 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 11/15/2023 | FIREPLACE MANUAL RECEIVED, SEE IMAGES // FIREPLACE CLEARANCE TO COMBUSTIBLES AND VENT TERMINATION OK / NON-COMBUSTIBLE MATERIALS INSTALLED / | STEPHANIEV | STEPHANIEV | | HV | C | 7919044 |
WESTERN FIREPLACE SUPPLY, INC. | HV | P | 11/14/2023 | QUESTIONING TAPE ON VENT, WHERE IN THE MANUFACTURER INSTRUCTIONS DOES IT ALLOW TAPE ON VENT / VERIFY NON-COMBUSTIBLE HEARTH AT FINAL // NON-COMBUSTIBLE MATERIALS INSTALLED / | STEPHANIEV | STEPHANIEV | | HV | P | 7917997 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 11/14/2023 | NOW THAT THE FIREPLACE IS INSTALLED IN CLUBHOUSE COMPLETE GAS LINE AND PRESSURE TEST / | STEPHANIEV | STEPHANIEV | | HI | P | 7917989 |
AIRTECH MECHANICAL, INC. | HD | P | 11/13/2023 | WILL NEED A SPLICE SHOWING ALL THE CHANGES IN THE TRUNK LINE SIZES ON DUCTS BELOW RATED LID / ABOVE LID INSPECTION: 302 - SUPPORT DRYER EXHAUST DUCT ABOVE BEDROOM. 105 - CAP TERMINATION AT OUTSIDE WALL. 205 - CAP TERMINATION AT OUTSIDE WALL. 207 - CONNECT AND SEAL CONNECTION AT FAN CAN IN MASTER BATHROOM, RE-STRAP DRYER EXHAUST DUCT. / 109, 110, 111, 112, 113: OK / BELOW RATED LID INSPECTION: 102 OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7916610 |
AIRTECH MECHANICAL, INC. | HD | P | 11/08/2023 | 207: RECONNECT AND SEAL CONNECTION AT FAN CAN IN MASTER BATH, RE-STRAP DRYER EXHAUST DUCT / 205: IF NOT INSTALLING SECOND EXHAUST FAN REMOVE OR CAP PENETRATION AT WALL / 206, 208, 301: ABOVE CEILING OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7912645 |
AIRTECH MECHANICAL, INC. | HD | P | 11/06/2023 | 101: BELOW RATED LID OK / 105: REMOVE SECOND FAN OUT OF THE MASTER BATH AREA / 106, 107, 108 : ABOVE CEILING OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7909581 |
FRONTIER MECHANICAL SYSTEMS INC | HC | P | 11/06/2023 | THIS METER RELEASE IS FOR TEMP HEAT ONLY / OK TO SET 2 LB METER FOR HOUSE LINE FOR TEMP HEAT / | STEPHANIEV | STEPHANIEV | | HC | P | 7909567 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 11/06/2023 | HOUSE LINE 10 LB TEST OK / | STEPHANIEV | STEPHANIEV | | HI | P | 7909566 |
AIRTECH MECHANICAL, INC. | HD | P | 11/03/2023 | WORKING OFF OF SPLICE THAT IS CURRENTLY IN PLAN REVIEW. PROVIDE DRYER SPEC SHEETS. DRYER EXHAUST DUCTS ARE OVER 35 FEET LONG, WRITE IN DRYER BOX THE TOTAL LENGTH OF DRYER EXHAUST INSTALLED IN EACH APARTMENT FOR EASE OF FILLING OUT THE DRYER LENGTH LABEL THAT IS REQUIRED AT FINAL. 103, 104, 201, 202, 203 AND 204: ABOVE CEILING ALL OK. 101 BELOW RATED LID: INSTALL 8X4 SUPPLY INTO BATHROOM. | NANCY | NANCY | | HD | P | 7908340 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 11/03/2023 | WORKING OFF OF SPLICE THAT IS CURRENTLY IN PLAN REVIEW. HOUSE LINE: LOW TEST. REINSTALL ALL HANGERS THAT WERE REMOVED DURING INSTALLATION OF DRYWALL AT CORRIDOR CEILINGS. NO FIREPLACE INSTALLED IN GATHERING ROOM, WILL NEED PRESSURE TEST ON GAS LINE TO FIREPLACE WHEN INSTALLED. ALL REGULATORS INSTALLED IN CONCEALED LOCATIONS WILL REQUIRE ACCESS/ACCESS PANELS BY FINAL. COMPLETE CONNECTIONS TO ALL APPLIANCES WHEN READY. INSTALLATION AS PER SPLICE ON ALL LEVELS. METER BANK EAST SIDE: TWENTY FOUR 10 LB TESTS OK. | NANCY | NANCY | | HI | P | 7908322 |
AIRTECH MECHANICAL, INC. | HRP | P | 11/02/2023 | ANY LINESET WITH BRAZED CONCEALED JOINTS MUST BE PRESSURE TESTED BEFORE BEING CONCEALED / INSPECTION OF LINESETS IN EXTERIOR NORTH WALL ONLY FOR EAST SIDE: 101-104, 201-204, 301-304, ALL CORRIDORS OK / STILL NEED TO SEE THE REST OF LINESETS ON EAST SIDE / | STEPHANIEV | STEPHANIEV | | HRP | P | 7906880 |
AIRTECH MECHANICAL, INC. | HRP | P | 11/01/2023 | ALL LINESETS ON LEVEL 4 WILL REQUIRE PRESSURE TEST / INSPECTION OF LINESETS IN EXTERIOR NORTH WALL ONLY FOR EAST SIDE: 101, 102, 103, 301, 302, LEVEL 2 AND 3 CORRIDOR OK / | STEPHANIEV | STEPHANIEV | | HRP | P | 7905525 |
AIRTECH MECHANICAL, INC. | HD | P | 10/31/2023 | MECHANICAL SPLICES HAVE BEEN REQUESTED SINCE FIRST ON-SITE INSPECTION. STILL WAITING ON APARTMENT SPLICE FOR EXTRA BATH FAN IN MASTER BATH AND DRYER EXHAUST GOING THROUGH APARTMENT AND NOT THROUGH CORRIDOR. ALSO NEED SPLICE FOR REVISED CORRIDOR HVAC AND GAS SPLICE. UNABLE TO PROCEED WITH INSPECTIONS FOR APARTMENTS UNTIL SPLICES ARE APPROVED. / DO NOT INSTALL SHEETROCK ON APARTMENT CEILINGS UNTIL ALL ABOVE CEILING INSPECTIONS HAVE BEEN COMPLETED. // UNIT# 103, 104 AND 201: ABOVE CEILING ONLY OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7904247 |
AIRTECH MECHANICAL, INC. | HD | P | 10/30/2023 | STILL NEED SPLICE FOR ADDED BATH EXHAUST IN MASTER BATH AND FOR NEW ROUTE AND TERMINATION FOR DRYER EXHAUST ABOVE CEILING / UNIT #103: ADD STRAP ON DRYER EXHAUST EVERY 4' / ADD STRAP ON BATH EXHAUST DUCT / | STEPHANIEV | STEPHANIEV | | HD | P | 7903173 |
AIRTECH MECHANICAL, INC. | HD | P | 10/27/2023 | UNIT #102: ABOVE CEILING ALL OK / | STEPHANIEV | STEPHANIEV | | HD | P | 7901477 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 10/24/2023 | INSPECTION ON EAST SIDE ONLY : 2ND FLOOR: #208 10 LB TEST OK / 3RD FLOOR: #308 10 LB TEST OK. #305 OK / SUPPORTS ALL OK / | STEPHANIEV | STEPHANIEV | | HI | P | 7897660 |
AIRTECH MECHANICAL, INC. | HD | P | 10/24/2023 | UNIT #101: EXHAUST FAN IN EXTERIOR RATED WALL OK / STILL NEEDS TO BE LOOKED AT BY BUILDING / DRYER EXHAUST IN WALL OK / STILL NEED TO SEE BELOW RATED CEILING / | STEPHANIEV | STEPHANIEV | | HD | P | 7897651 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 10/13/2023 | WORKING OFF SUBMITTED SPLICE / SUPPORT GAS PIPE WITH METAL STRAP AS PER IFGC 2015 407.2 DESIGN AND INSTALLATION / INSPECTION ON EAST SIDE ONLY: 2ND FLOOR: 208 LOW TEST. REST 10 LB TEST OK / 3RD FLOOR: 308 REPLACE GAUGE AND RETEST, 305 ADD SUPPORT ABOVE SHOWER. REST 10 LB TEST OK / | STEPHANIEV | STEPHANIEV | | HI | P | 7887752 |
AIRTECH MECHANICAL, INC. | HD | P | 10/10/2023 | PROVIDE DRYER SPECS / NEED REVISED SPLICE SHOWING DRYER AND BATH EXHAUST ROUTE AND TERMINATION / NEW MASTER BATH LAYOUT REQUIRES SPLICE AND NEW BATH EXHAUST FOR SHOWER AREA // 1ST FLOOR UNIT 101: BATH AND DYER EXHAUST ABOVE RATED CEILING OK / STILL NEED TO SEE BELOW RATED CEILING / | STEPHANIEV | STEPHANIEV | | HD | P | 7883159 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 10/03/2023 | WORKING OFF PLANS ON-SITE, WILL NEED SPLICE / CONTINUE AT OWN RISK / INSPECTION ON EAST SIDE ONLY: 10 LB TEST OK ON ALL GAS RISERS IN OUTER WALL FOR APARTMENTS AND CORRIDORS / 10 LB TEST OK ON ALL 1ST FLOOR LEVEL APARTMENTS INTO MECHANICAL ROOMS / STILL NEED TO SEE GAS COMPLETED IN CORRIDORS, 2ND AND 3RD LEVEL APARTMENTS / | STEPHANIEV | STEPHANIEV | | HI | P | 7874960 |
AIRTECH MECHANICAL, INC. | HSP | P | 09/28/2023 | on site progress walk , spoke with GC he has submitted splice for review. no mechanical at this time. | TREVORH | TREVORH | | HSP | P | 7870876 |
AIRTECH MECHANICAL, INC. | HSP | P | 08/01/2023 | PRE CON MEETING AT GENERAL CONTRACTORS OFFICE. / | STEPHANIEV | STEPHANIEV | | HSP | P | 7813952 |
AIRTECH MECHANICAL, INC. | HSP | P | 08/01/2023 | PRE CON MEETING AT THE GENERAL CONTRACTORS OFFICE. | TREVORH | TREVORH | | HSP | P | 7813896 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 01/30/2024 | MAIN FLOOR GATHERING AREA IN-WALL/OVERHEAD H2O AND DWV: NEED SPLICE FOR WATER SIZING DIFFERENCE FROM PLAN / NEED SPLICE FOR AAV'S AND LOCATIONS FOR KITCHEN SINK, BATH LAV AND MOP SINK / REST OK /// 3RD FLOOR RECREATION AREA IN-WALL/OVERHEAD H2O AND DWV: NEED SPLICE FOR WATER SIZING DIFFERENCE FROM PLAN / NEED SPLICE FOR AAV'S AND LOCATIONS FOR LAV AND DRINKING FOUNTAIN / REST OK /// | ADRIANM | ADRIANM | | PTO | P | 7981282 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 01/09/2024 | CORRECTION MADE TO 1-1/2" UNDERSIZED AT WEST MOST BRANCH OFF MAIN /// 313-317 H2O: FREEZE PROTECTION AT ATTIC MINUS 313 /// 309-311 H2O: FREEZE PROTECTION OK ///
| ADRIANM | ADRIANM | | PTO | P | 7963129 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 01/03/2024 | WATER ROOM 106 MOP SINK AND KITCHEN SINK IN GATHERING AREA: OK PENDING SPLICE FOR RELOCATION OF KITCHEN SINK / CAN BACKFILL AT OWN RISK | ADRIANM | ADRIANM | | PB | P | 7958923 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 01/02/2024 | Follow up from 12/29/23 inspection: 1-1/2" at west most branch undersized (plans show 2") | ADRIANM | ADRIANM | | PTO | P | 7956940 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/29/2023 | DWV & H2O UNITS 215,216,217: OK / REST OK /// DWV 315, 316, 317: OK /// H2O UNITS 309, 310, 311, 312: NEED FREEZE PROTECTION AT ATTIC / REST OK /// COLD MAIN FROM GATHERING AREA WEST: OK PENDING FOLLOW UP REGARDING 1-1/2" REDUCTION AT 17 RISER | ADRIANM | ADRIANM | | PTO | P | 7956549 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/21/2023 | DWV and H2O at units 115, 116, 117 ok minus freeze protection at master tub trap for unit 116. | TAYLOR | TAYLOR | | PTO | P | 7951580 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/19/2023 | dwv and water piping ok in 112, 113, 114, 212, 213, 214 / dwv ok in 312, 313, 314 / will need to address freeze protection for water lines in attic above 3rd floor, still need engineer letter | TREBORB | TREBORB | | PTO | P | 7949614 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/15/2023 | dwv and water ok in 111, 211, 209, 309, 210, 310 / dwv ok in 311, need test on water and freeze protection | TREBORB | TREBORB | | PTO | P | 7946720 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 12/08/2023 | inspection was for H2O main from grid lines 1 - 11 ( need engineers letter for Uponor fusion pipe/ fittings, revise plans for hose bib connecting to 2 inch riser at grid line 2 ), note: test ok. | TAYLOR | TAYLOR | | PTO | P | 7939669 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/28/2023 | air barrier ok for water piping in attic at 301-308, still need engineer letter for freeze protection, in wall at 301 ok for freeze protection // dwv and water ok 109, and 110 , dwv under belly ok for 209, 210 | TREBORB | TREBORB | | PTO | P | 7929436 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/17/2023 | revise plans for adding 2 inch hub drains x 3 at 2nd floor hallway, note: test ok. | TAYLOR | TAYLOR | | PTO | P | 7922494 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/06/2023 | dwv and water ok in 303 , water piping insulation ok in 303, 306, 307, & 308 | TREBORB | TREBORB | | PTO | P | 7910487 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/03/2023 | dwv and water ok in 304, 305, 306 / dwv and water ok less piping insulation in 306, 307, 308 / / 303 dwv and water ok less insulation and dwv and water test / still need to address freeze protection on 3rd floor all / still need clarification on type A units | TREBORB | TREBORB | | PTO | P | 7909127 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 11/02/2023 | 205, 206 water test ok / 207, 208 water and dwv ok | TREBORB | TREBORB | | PTO | P | 7907624 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 10/31/2023 | dwv and water ok in 105, 106, 107, 108, 205, 206, less water test in 205 and 206, less kitchen drain in 205 / need clarification from engineer on freeze protection for floor drains for elevator sump discharge, and clarification on stand pipe vs floor drain / need clarification on type-A unit showers. | TREBORB | TREBORB | | PTO | P | 7905107 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 10/27/2023 | kitchen drain for 204 ok | TREBORB | TREBORB | | PTO | P | 7902459 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 10/25/2023 | DWV and water ok 103, 104, 203, 204, underbelly for 303,304, less tub in 303 and kitchen drain for 204 is tied upstream of bathroom group | TREBORB | TREBORB | | PTO | P | 7899424 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 10/24/2023 | inspected 102, 202, and 302 / need to see tub set in 302 / dwv ok / water in units ok / still need to address freeze protection for water ;lines in attic | TREBORB | TREBORB | | PTO | P | 7897916 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 10/09/2023 | inspected 101, 201, and 301 / NEED ENGINEER TO ADDRESS FREEZE PROTECTION, in outside wall and overhead in attic at 301 / rest ok | TREBORB | TREBORB | | PTO | P | 7882121 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 10/05/2023 | apt-101 dwv and water ok, PTO ok / will need plan splice for shower and toilet layout changes (layout changed in 101, 201, and 301) / will need plan splice for relocating 4" water main to 2nd floor / 4" copper water main ok from 1st floor into 101 and into hallway, less insulation | TREBORB | TREBORB | | PTO | P | 7879345 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 08/22/2023 | units 101. 102, 103, 104 - dwv ok less tubs and showers, water in units ok less insulation / units 201, 202, 203, & 204 underbelly dwv ok less tubs and showers (204 kitchen drain needs to tie in downstream of bathroom group) water in units ok less piping insulation | TREBORB | TREBORB | | PTO | P | 7834210 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | L | 08/17/2023 | field cancelled. | TAYLOR | TAYLOR | | PTO | L | 7829831 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 07/26/2023 | consult on dwv layout and water sizing in apts. | TREBORB | TREBORB | | PTO | P | 7809329 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 07/17/2023 | consult / discussed type-a and type-b units / discussed pto tub sets and testing | TREBORB | TREBORB | | PTO | P | 7799258 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 06/20/2022 | DWV OK ; PENDING PLAN SPLICE ; 4" WATER IN (NOT ON PLANS) | TREBORB | TREBORB | | PB | P | 7417990 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 06/17/2022 | 4" WATER IN OK (NOT ON PLANS) NOTE: STILL NEED PLANS SPLICE FOR LAYOUT CHANGES AND ADDING FDs AT RISER ROOM"
OK for grid 10 - 5 only today. NOTE: has 4 floor clean outs at these grid lines
still nee remainder | JOHNS | JOHNS | | PB | P | 7415172 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 06/16/2022 | FIELD CANCELED | TREBORB | TREBORB | | PB | P | 7414410 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 06/13/2022 | ADDED 4" FD FOR ELEVATOR SUMP ON EAST END ; ; 4" WATER IN OK (NOT ON PLANS) NOTE: STILL NEED PLANS SPLICE FOR LAYOUT CHANGES AND ADDING FDs AT RISER ROOM"
| TREBORB | TREBORB | | PB | P | 7409772 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 06/13/2022 | ADDED 4" FD FOR ELEVATOR SUMP ON EAST END ; ; 4" WATER IN OK (NOT ON PLANS) NOTE: STILL NEED PLANS SPLICE FOR LAYOUT CHANGES AND ADDING FDs AT RISER ROOM | TREBORB | TREBORB | | PB | P | 7409812 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 06/09/2022 | CONSULT | TREBORB | TREBORB | | PB | P | 7405959 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 06/07/2022 | DWV OK COLUMN LINES 1-9 EAST END EXCEPT ELEVATOR RECEPTOR ; NEED PLANS SPLICE FOR CHANGE IN LAYOUT; (3) 3" RISERS BETWEEN COLUMNS | TREBORB | TREBORB | | PB | P | 7402785 |
BIBLE ELECTRIC, INC. | XES | P | 02/07/2024 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Minor power revisions - relocated receptacles. | BERTHA | BERTHA | | XES | P | 7989171 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | P | 02/05/2024 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised gas, backgrounds | JUSTINC | JUSTINC | | XMS | P | 7986554 |
BIBLE ELECTRIC, INC. | XES | T | 11/06/2023 | PAID (REC#2005709): PLAN SPLICE FEE: $188.33 by: BERTHA for Electrical: Revisions throughout. | BERTHA | BERTHA | | XES | T | 7910036 |
FRONTIER MECHANICAL SYSTEMS INC | XMS | T | 11/03/2023 | PAID (REC#2005306): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | T | 7908179 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | XBS | T | 11/02/2023 | PAID (REC#2004886): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised floor plans, listings | SHELLEY | SHELLEY | | XBS | T | 7907183 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | XBS | T | 10/26/2023 | PAID (REC#2003072): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Restroom revisions, floor plan revisions, structural revisions. | SHELLEY | SHELLEY | | XBS | T | 7900427 |
BIBLE ELECTRIC, INC. | XES | T | 10/10/2023 | PAID (REC#1997152): PLAN SPLICE FEE: $83.33 by: BERTHA for Electrical: Revisions throughout. | BERTHA | BERTHA | | XES | T | 7883641 |
AIRTECH MECHANICAL, INC. | XMS | P | 07/10/2023 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 7793728 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | XBS | T | 05/30/2023 | PAID (REC#1958437): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: TRUSSES | SHELLEY | SHELLEY | | XBS | T | 7756882 |
BIBLE ELECTRIC, INC. | XES | T | 04/25/2023 | PAID (REC#1949823): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revised house panel/// Add EWH's | SHELBY | SHELBY | | XES | T | 7726729 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | XMS | T | 04/20/2023 | PAID (REC#1949467): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions | JUSTINC | JUSTINC | | XMS | T | 7722404 |
FRONTIER MECHANICAL SYSTEMS INC | XPS | T | 04/19/2023 | PAID (REC#1953106): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: Adjusted sheet P2.1, P2.4, P3.1 and P3.4. | SHANEN | SHANEN | | XPS | T | 7721450 |