FREEDOM FOREVER COLORADO, LLC | B= | C | 06/30/2023 | All other required Final inspections are complete. (This is a computer generated result) | TOMN | TOMN | | B= | C | 7787583 |
FREEDOM FOREVER COLORADO, LLC | B= | P | 06/30/2023 | Previous inspector stated solar ok / pending electrical. Additional Inspections Required (computer generated): Electrical Final Inspection is not Completed yet. | TOMN | TOMN | | B= | P | 7787050 |
FREEDOM FOREVER COLORADO, LLC | B= | P | 03/15/2023 | Solar OK / Pending electrical. Additional Inspections Required (computer generated): Electrical Final Inspection is not Completed yet. | JAMESARBOGAST | JAMESARBOGAST | | B= | P | 7687973 |
FREEDOM FOREVER COLORADO, LLC | B= | P | 07/05/2022 | Field cancellation per site rep -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): Electrical Final Inspection is not Completed yet. | FERNANDOH | FERNANDOH | | B= | P | 7434434 |
FREEDOM FOREVER COLORADO, LLC | ER | C | 06/30/2023 | ER OK ------ ROOF BONDING OK ----- | GREGM | GREGM | | ER | C | 7787584 |
FREEDOM FOREVER COLORADO, LLC | E= | C | 06/30/2023 | E= OK ------ | GREGM | GREGM | | E= | C | 7787582 |
FREEDOM FOREVER COLORADO, LLC | ES | C | 06/30/2023 | Residential Underground: Ok to set rec meter / | GREGM | GREGM | | ES | C | 7787570 |
FREEDOM FOREVER COLORADO, LLC | E= | R | 06/26/2023 | SEE RS NOTES ---- | GREGM | GREGM | | E= | R | 7781796 |
FREEDOM FOREVER COLORADO, LLC | ES | R | 06/26/2023 | Residential Underground: PLANS SHOW 200 AMP MAIN AT GATEWAY 100 IS INSTALLED ----- NEED E/M DISCONNECT OUTSIDE FOR BATTERIES ------ REST OK ----- | GREGM | GREGM | | ES | R | 7781795 |
FREEDOM FOREVER COLORADO, LLC | ESP | P | 04/03/2023 | ---------------------------PV system has some major changes from the original plan. Splice being submitted, once approved an on site inspection must be performed to verify the changes-------------------------- | DEAN | DEAN | | ESP | P | 7705590 |
FREEDOM FOREVER COLORADO, LLC | E= | R | 03/15/2023 | SEE ES NOTES ----- | GREGM | GREGM | | E= | R | 7687943 |
FREEDOM FOREVER COLORADO, LLC | ES | T | 03/15/2023 | PAID (REC#1943800): Residential Underground: PLANS NEED TO MATCH WHAT IS INSTALL ---- COMPLETE RE-INSP ------ | GREGM | GREGM | | ES | T | 7687940 |
FREEDOM FOREVER COLORADO, LLC | ES | R | 02/02/2023 | Residential Underground: SEE E= NOTES ----- | GREGM | GREGM | | ES | R | 7651166 |
FREEDOM FOREVER COLORADO, LLC | E= | R | 02/02/2023 | FIELD CANCELLED BY CONTRACTOR ------ | GREGM | GREGM | | E= | R | 7651156 |
FREEDOM FOREVER COLORADO, LLC | E= | R | 01/23/2023 | called call ahead # with no answer----we need to make sure someone will be there for access. | RANDY | RANDY | | E= | R | 7641919 |
FREEDOM FOREVER COLORADO, LLC | ES | R | 01/23/2023 | Residential Underground: | RANDY | RANDY | | ES | R | 7641914 |
FREEDOM FOREVER COLORADO, LLC | E= | R | 01/19/2023 | SEE ES NOTES ---- | GREGM | GREGM | | E= | R | 7638887 |
FREEDOM FOREVER COLORADO, LLC | ES | R | 01/19/2023 | Residential Underground: CANCELED BY CONTRACTOR ------- | GREGM | GREGM | | ES | R | 7638885 |
FREEDOM FOREVER COLORADO, LLC | EUG | C | 07/15/2022 | 2 inch pvc from service disconnect to utility pole. | JOSEPH | JOSEPH | | EUG | C | 7447567 |
FREEDOM FOREVER COLORADO, LLC | EUG | P | 07/14/2022 | underground from house to pole partially backfilled with raceway only , what is the purpose of this underground trench ? | BRET | BRET | | EUG | P | 7445853 |
FREEDOM FOREVER COLORADO, LLC | E= | L | 07/05/2022 | | TOMC | TOMC | | E= | L | 7434444 |
FREEDOM FOREVER COLORADO, LLC | ES | L | 07/05/2022 | call completed at 9:10 tagged door at 9:43 | TOMC | TOMC | | ES | L | 7434428 |
FREEDOM FOREVER COLORADO, LLC | EUG | R | 06/10/2022 | clean out ditch and install wire or conduit | TOMC | TOMC | | EUG | R | 7407846 |
FREEDOM FOREVER COLORADO, LLC | XES | T | 06/19/2023 | PAID (REC#1962625): PLAN SPLICE FEE: $50 by: DANIELG for Electrical: Added ESS to PV system. | DANIELG | DANIELG | | XES | T | 7775181 |
FREEDOM FOREVER COLORADO, LLC | XBS | P | 04/03/2023 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revised site plan drawing | DANM | DANM | | XBS | P | 7704960 |
FREEDOM FOREVER COLORADO, LLC | XES | T | 01/12/2023 | PAID (REC#1926320): PLAN SPLICE FEE: $50 by: RICHG for Electrical: REVISED SITE PLAN. CHANGED ARRAY LAYOUT. WENT FROM 18 TESLA PANELS TO 19 NE SOLAR PANELS. | RICHG | RICHG | | XES | T | 7633566 |
FREEDOM FOREVER COLORADO, LLC | XBS | P | 01/12/2023 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revised array layout and engineering | DANM | DANM | | XBS | P | 7632815 |
FREEDOM FOREVER COLORADO, LLC | XBS | P | 01/12/2023 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Revised modules and site plan | SHELLEY | SHELLEY | | XBS | P | 7632813 |