FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | BSP | T | 07/07/2022 | PAID (REC#1881692): ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN for plan review with plans | TCRIPPEN | TCRIPPEN | | BSP | T | 7437593 |
FRPHI SECO ELECTRIC, LLC | E= | C | 12/21/2022 | | JIMMY | JIMMY | | E= | C | 7617217 |
FRPHI SECO ELECTRIC, LLC | E= | P | 09/16/2022 | . Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, -- Schedule a new final inspection after these are complete. | JIMMY | JIMMY | | E= | P | 7519180 |
FRPHI SECO ELECTRIC, LLC | E= | P | 08/30/2022 | . Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, -- Schedule a new final inspection after these are complete. | JIMMY | JIMMY | | E= | P | 7499890 |
FRPHI SECO ELECTRIC, LLC | E= | P | 08/02/2022 | Water heater ok. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, , -- Schedule a new final inspection after these are complete. | JIMMY | JIMMY | | E= | P | 7468315 |
FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | H= | C | 08/02/2022 | PERMIT CORRECTION MADE | JERRYF | JERRYF | | H= | C | 7467292 |
FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | HV | C | 08/02/2022 | PICTURES RECEIVED - SEE IMAGES | JERRYF | JERRYF | | HV | C | 7467282 |
FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | H= | P | 07/14/2022 | NEED ELECTRICAL CONTRACTOR ATTACHED TO PERMIT. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, , . | PAULO | PAULO | | H= | P | 7446238 |
FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | HI | C | 07/14/2022 | Note / Leak test for extended gas line ok. | PAULO | PAULO | | HI | C | 7446233 |
FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | P= | C | 08/19/2022 | Correction made / See images | ADRIANM | ADRIANM | | P= | C | 7488404 |
FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | P= | P | 08/02/2022 | Still need to secure venting to water heater vent inlet and outlet connections (the manufacturer should have provided little screws to secure venting to vent inlet and outlet connections) / Rest OK / See images | ADRIANM | ADRIANM | | P= | P | 7467241 |
FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | P= | P | 07/14/2022 | Need 1-1/2" minimum air gap at both T&P drains / Water heater vent needs to be secured to water heater / Exhaust termination must be 12" higher than intake termination / Both terminations must face directly downward with 90 degree fittings / Detailed photos of corrections made OK / NOTE: DIRECT VENT TANKLESS (HYBRID) WATER HEATER | ADRIANM | ADRIANM | | P= | P | 7446905 |
FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | P= | R | 06/29/2022 | Plans are needed for replacing tank type water heater with tankless / Needs plans review / Need mechanical permit attached for gas / Need plastic vent added to scope of work / Gas shut off valve inaccessible / Vent not secured to water heater / Need water heater install manual uploaded or on site to verify existing venting is compatible with new water heater / Reinspect all | ADRIANM | ADRIANM | | P= | R | 7428932 |
FLOW RIGHT PLUMBING HEATING & IRRIGATION, INC. | P= | P | 06/28/2022 | Gas shut off to water heater inaccessible / Vent not secured to water heater / Need water heater installation instructions on site or uploaded to an inspection request / Need further review for additional items | ADRIANM | ADRIANM | | P= | P | 7427966 |