NUNN CONSTRUCTION, INC. | B= | C | 10/13/2022 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 7548752 |
NUNN CONSTRUCTION, INC. | B= | P | 09/22/2022 | Building final OK pending other finals / Pics of 2 missing cripple studs on file. Additional Inspections Required (computer generated): HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, HARMON-BONDED PLUMBING & HEATING INC Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 7525798 |
NUNN CONSTRUCTION, INC. | B= | P | 09/16/2022 | pending completed frame inspection and other final inspections -- Schedule a new Building Final when above items are complete. | BRIANB | BRIANB | | B= | P | 7519794 |
NUNN CONSTRUCTION, INC. | BSP | P | 07/14/2022 | observed in floor penetrations / note - 1hr fire barrier is pre-existing | BRIANB | BRIANB | | BSP | P | 7446533 |
NUNN CONSTRUCTION, INC. | BFR | P | 07/13/2022 | Framing OK at all but RM 108 / Complete other roughs / Need to attach mechanical and complete required roughs | JEREMYA | JEREMYA | | BFR | P | 7444572 |
GONZALES ELECTRIC, LLC | E= | C | 08/31/2022 | Corrections made. | AARONR | AARONR | | E= | C | 7502936 |
GONZALES ELECTRIC, LLC | E= | C | 08/30/2022 | FIRE ALARM INSPECTION: | AARONR | AARONR | | E= | C | 7501135 |
GONZALES ELECTRIC, LLC | E= | P | 08/30/2022 | Need to remove bond screw from fused disconnect. --- Need to label fused disconnect. --- Need panel schedule ---- Need spark ring in reception receptacles. --- Need to GFCI protect receptacles 6' from sink. | AARONR | AARONR | | E= | P | 7501127 |
GONZALES ELECTRIC, LLC | ER | C | 08/23/2022 | Ceiling rough OK. --- Corrections made. | AARONR | AARONR | | ER | C | 7492150 |
GONZALES ELECTRIC, LLC | ER | P | 08/17/2022 | VAV near receptions desk needs proper working clearance. Door need to open to 90* min.............Other corrections made for above ceiling rough. | AARONR | AARONR | | ER | P | 7486027 |
GONZALES ELECTRIC, LLC | ER | P | 08/10/2022 | Will need to leave ceiling out in following areas for re-inspection.......2x VAV's / Water Heater / 3 rooms with open j-boxes. | AARONR | AARONR | | ER | P | 7477912 |
GONZALES ELECTRIC, LLC | ER | C | 08/10/2022 | FIRE ALARM INSPECTION: Fire alarm OK. | AARONR | AARONR | | ER | C | 7477860 |
GONZALES ELECTRIC, LLC | ER | C | 07/06/2022 | FIRE ALARM INSPECTION: All wall rough OK. | AARONR | AARONR | | ER | C | 7437087 |
GONZALES ELECTRIC, LLC | ER | C | 07/06/2022 | All wall rough OK. | AARONR | AARONR | | ER | C | 7437086 |
HVAC SOLUTIONS, INC. | H= | C | 10/13/2022 | PICTURES RECEIVED OF THERMOSTATS FOR VAV 206 AND 207 INSTALLED NO GREATER THEN 48" ABOVE THE FLOOR. SEE IMAGES / MECHANICAL FINAL OK / | LIDO | LIDO | | H= | C | 7548751 |
HVAC SOLUTIONS, INC. | H= | P | 10/12/2022 | RFI WITH ENGINEER RESPONSE APPROVING CO2 SENSOR INSTALL IN ROOM 104.PICTURES RECEIVED OF RETURN AIR TRANSFER BOOTS INSTALLED. SEE IMAGES/ FINAL PENDING: THERMOSTAT CONTROLS FOR VAV 206 AND 207 INSTALLED OVER 48" ABOVE THE FLOOR. LOWER THERMOSTAT OR OK TO INSTALL A LOCK BOX / OK TO ATTACH PICTURE OF CORRECTION TO AN INSPECTION REQUEST / | LIDO | LIDO | | H= | P | 7547252 |
HVAC SOLUTIONS, INC. | H= | P | 09/19/2022 | FIRE DAMPER (Ruskin model IBD2) INSTALL COMPLETE. SEE IMAGES / REVISED TEST AND BALANCE REPORT RECEIVED (report done per splice dated 9/19/22). SEE IMAGES / FINAL PENDING: MISSING RETURN AIR TRANSFER BOOTS FOR ROOM #107, 109 AND 110? / WHAT IS BEING DONE FOR RETURN AIR IN CLEAN ROOM # 105? / CO2 SENSOR INSTALLED IN ROOM 104, PLANS SHOW CENSOR TO BE INSTALLED IN ROOM 107 / THERMOSTAT CONTROLS FOR VAV 206 AND 207 INSTALLED OVER 48" ABOVE THE FLOOR. LOWER THERMOSTAT OR OK TO INSTALL A LOCK BOX / | LIDO | LIDO | | H= | P | 7521143 |
HVAC SOLUTIONS, INC. | H= | P | 09/15/2022 | IMAGES OF LABELED ACCESS FOR FIRE DAMPER NOT ACCEPTED. CANNOT TELL FROM PICTURE IF LETTERS ARE AT LEAST .5" IN HEIGHT. SEE 2015 IMC CODE SECTION 607.4/ STILL NEED FIRE DAMPER ANGLE INSPECTION. / SEE INSPECTION NOTES DATED 8/22/22 FOR OTHER ITEMS THAT STILL NEED TO BE ADDRESSED / TEST AND BALANCE REPORT REVIEW: VAV-207B GRILL #1,2 AND 3 ARE OUTSIDE THE 10% +/- ALLOWED. ROOM 108 EXHAUST GRILL #1 IS OUTSIDE THE 10% +/- ALLOWED./ | LIDO | LIDO | | H= | P | 7517724 |
HVAC SOLUTIONS, INC. | HD | P | 08/22/2022 | FIRE DAMPER (Ruskin model IBD2) IS NOT INSTALLED PER MANUFACTURER REQUIREMENTS. WENT OVER PROPER INSTALL WITH CONTRACTOR (Ed) / STILL MISSING RETURN AIR TRANSFER BOOTS FOR ROOM # 107, 109 AND 110. / WHAT IS BEING DONE FOR RETURN AIR IN CLEAN ROOM # 105? / CO2 SENSOR INSTALLED IN ROOM 104, PLANS SHOW CENSOR TO BE INSTALLED IN ROOM 107 / THERMOSTAT CONTROLS FOR VAV 206 AND 207 INSTALLED OVER 48" ABOVE THE FLOOR. LOWER THERMOSTAT OR OK TO INSTALL A LOCK BOX / VAV 207 B INSTALL OK / PLAN SPLICE SHOWING (E / relocated) VAV-210 - VAV BEING INSTALLED IN ROOM # 109 IS ON FILE / | LIDO | LIDO | | HD | P | 7491029 |
HVAC SOLUTIONS, INC. | HD | P | 08/10/2022 | CHANGED TO HD DUE TO FIRE DAMPER INSTALL NOT COMPLETE / NEED NEW VAV 207B INSTALLED / WHAT IS BEING DONE FOR RETURN AIR IN CLEAN ROOM # 105? / MISSING RETURN AIR TRANSFER BOOTS FOR ROOM # 107, 109 AND 110. / REST OF SUPPLY FLEX DUCT, SUPPLY REGISTERS AND LAY-IN RETURN AIR GRILLS OK | LIDO | LIDO | | HD | P | 7478377 |
HVAC SOLUTIONS, INC. | HD | P | 08/10/2022 | PICTURE RECEIVED OF FIRE DAMPER BREAKAWAY CONNECTION. SEE IMAGES. | LIDO | LIDO | | HD | P | 7477382 |
HVAC SOLUTIONS, INC. | HD | P | 08/02/2022 | ADDED FIRE DAMPER FRAME INSPECTION : DAMPER FRAMING OK.STILL NEED DAMPER INSTALL INSPECTED WHEN COMPLETE / STILL NEED NEW VAV 207B INSTALLED/ DUCT ROUGH : (E / relocated) VAV-210 - VAV INSTALLED IN ROOM # 109. PLANS SHOW VAV TO BE INSTALLED IN ROOM # 108. INSTALL PER PLAN. (E) VAV 207 - CORRECTIONS MADE TO SUPPLY DUCT. OK TO INSULATE / | LIDO | LIDO | | HD | P | 7468728 |
HVAC SOLUTIONS, INC. | HD | P | 08/02/2022 | PICTURES RECEIVED ARE NOT CLEAR. WILL NEED ON-SITE INSPECTION / | LIDO | LIDO | | HD | P | 7467658 |
HVAC SOLUTIONS, INC. | HD | P | 07/25/2022 | ADDED FIRE DAMPER FRAME INSPECTION : NEED TO COVER HOLES IN FRAMED OPENING WITH METAL (went over what is except able with GC). REMOVE FIRE CAULK FROM FIRE DAMPER ANNULAR SPACING . ALSO STILL NEED DAMPER INSTALLED AND INSPECTED / DUCT ROUGH : (E / relocated) VAV-210 - VAV INSTALLED IN ROOM # 109. PLANS SHOW VAV TO BE INSTALLED IN ROOM # 108. INSTALL PER PLAN. DUCT ROUGH OK. OK TO INSULATE / (E) VAV 207 - 6" SUPPLY INSTALLED TO ROOM # 109 AND 8" INSTALLED TO ROOM #108. PLANS SHOW 6" TO ROOM # 108 AND 8" TO ROOM #109 INSTALL PER PLAN. REST OF DUCT ROUGH OK. OK TO INSULATE / NEW VAV 207B - VAV NOT INSTALLED.LOW PRESSURE DUCT ROUGH OK. OK TO INSULATE / ROOM # 108 - EXHAUST DUCT ROUGH OK. / (E) VAV 206 - DUCT ROUGH OK. OK TO INSULATE / | LIDO | LIDO | | HD | P | 7458366 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | C | 09/23/2022 | splice done | JOSEPHD | JOSEPHD | | P= | C | 7527553 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | C | 09/23/2022 | splice done | JOSEPHD | JOSEPHD | | PTO | C | 7527552 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | P | 08/24/2022 | need plan splice done, rest ok | JOSEPHD | JOSEPHD | | P= | P | 7494346 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 08/10/2022 | under floor dwv ok, need splices done, all other pto items are done | JOSEPHD | JOSEPHD | | PTO | P | 7478735 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | T | 08/08/2022 | PAID (REC#1889610): AFTER-HOURS INSPECTION: $200 From: JANE Per Joel | JANE | JANE | | P= | T | 7474200 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 07/12/2022 | dwv re-routed in wall room 106 ok | JOSEPHD | JOSEPHD | | PTO | P | 7442953 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 07/06/2022 | over head water pipe insulation ok | JOSEPHD | JOSEPHD | | PTO | P | 7436500 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 06/28/2022 | plans call for 3/4" to wall box, need plans to reflect new point of connection for cold water to relocated water heater, will need to conduct more research into existing water heater pan termination will update notes in morning, need to see water pipe insulation, rest of in-wall and over head water and dwv ok, electric water heater ok
update 6/29/22 contractor to verify where water heater pan drain terminates | JOSEPHD | JOSEPHD | | PTO | P | 7427972 |
HVAC SOLUTIONS, INC. | XMS | P | 09/19/2022 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised soiled room return air to plenum | JUSTINC | JUSTINC | | XMS | P | 7521001 |
HARMON - BONDED PLUMBING & HEATING, INC. | XPS | T | 09/19/2022 | PAID (REC#1900552) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 2 revisions: Adjusted sheet PD1.10 and P1.10. | SHANEN | SHANEN | | XPS | T | 7520832 |
HVAC SOLUTIONS, INC. | XMS | T | 08/10/2022 | PAID (REC#1892967) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised VAV location | JUSTINC | JUSTINC | | XMS | T | 7478564 |