AVA'S CONSTRUCTION LLC | B= | C | 03/22/2024 | All final inspections completed. | NATHAN | NATHAN | | B= | C | 8031112 |
AVA'S CONSTRUCTION LLC | B= | P | 03/21/2024 | level 1 north laundry room final OK pending other required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): DR. HYDRONIC ENGINEERING, LLC Mechanical Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 8028662 |
AVA'S CONSTRUCTION LLC | BFR | P | 02/15/2024 | north laundry wall gyp attachment OK - still need to inspect penetrations and repair of removed horizontal assembly over equipment when ready | LONNYS | LONNYS | | BFR | P | 7996867 |
AVA'S CONSTRUCTION LLC | BFR | P | 02/13/2024 | NORTH LAUNDRY FRAME INSPECTION - framing OK after wall was rebuilt pending other required inspection - fire barrier continuity verified in concealed space equipment wall to unit wall / still need to inspect all ceiling gyp repairs when ready | LONNYS | LONNYS | | BFR | P | 7994268 |
AVA'S CONSTRUCTION LLC | BFR | R | 02/01/2024 | NORTH LAUNDRY -- corridor wall gyp attachment - need to verify corridor wall continuity to unit fire barrier - penetrations incomplete - need to repair rated horizontal assembly - rest of attachment OK | LONNYS | LONNYS | | BFR | R | 7983933 |
AVA'S CONSTRUCTION LLC | BFR | P | 01/29/2024 | LEVEL 1 LAUNDRY -- corridor wall framing corrections OK | LONNYS | LONNYS | | BFR | P | 7979934 |
AVA'S CONSTRUCTION LLC | BSP | P | 01/23/2024 | level 1 laundry room fire barrier 5/8" gyp corrections to underside of deck OK per UL U415
level 1 laundry corridor wall framing -- framing incomplete to underside of floor decking / rest of framing OK per UL U305 | LONNYS | LONNYS | | BSP | P | 7974531 |
AVA'S CONSTRUCTION LLC | BFR | P | 01/19/2024 | LEVEL 1 - LAUNDRY FIRE BARRIER 5/8 DRYWALL // Drywall needs to go to underside of deck / Mechanical inspection required for duct penetration requirements / frame of new wall to corridor not ready. | NATHAN | NATHAN | | BFR | P | 7972176 |
AVA'S CONSTRUCTION LLC | BFR | P | 01/16/2024 | North Area level 1 laundry entry wall fire barrier per U415 shaft liner okay firestop and repairs needed at notched area top of wall by final fire stop inspection. | NATHAN | NATHAN | | BFR | P | 7969302 |
AVA'S CONSTRUCTION LLC | BFR | P | 12/13/2023 | unit 2523 gyp attachment OK | LONNYS | LONNYS | | BFR | P | 7943525 |
AVA'S CONSTRUCTION LLC | BFR | P | 12/12/2023 | unit 2523 door in fill framing OK / still need to inspect gyp attachment when ready | LONNYS | LONNYS | | BFR | P | 7942292 |
AVA'S CONSTRUCTION LLC | BSP | P | 11/13/2023 | LAUNDRY WALL CHASES AT CORRIDOR CORRECTIONS // all levels OK / still need to inspect 1st floor laundry horizontal assembly gyp repairs repairs when ready | LONNYS | LONNYS | | BSP | P | 7916406 |
AVA'S CONSTRUCTION LLC | BFR | P | 11/02/2023 | LAUNDRY ROOM CHASE WALLS 1-3 // need to return wall at corners in all 3 corridors / rest of framing and liner panels OK | LONNYS | LONNYS | | BFR | P | 7906887 |
AVA'S CONSTRUCTION LLC | BFR | P | 10/23/2023 | LEVELS 1-3 - 2ND HALF OF REAR LAUNDRY WALL SHAFT LINER AND FRAMING // liner and framing OK / still need to inspect ceiling and penetrations when ready | LONNYS | LONNYS | | BFR | P | 7896321 |
AVA'S CONSTRUCTION LLC | BFR | R | 10/19/2023 | Fire wall inspection - Not ready, field canceled prior to inspection. | ERAMIREZ | ERAMIREZ | | BFR | R | 7892883 |
AVA'S CONSTRUCTION LLC | BFR | P | 09/06/2023 | reviewed framing and core board progress at 2nd and 3rd floor laundry chases per UL U415 | LONNYS | LONNYS | | BFR | P | 7847776 |
AVA'S CONSTRUCTION LLC | BFR | R | 08/28/2023 | inspection request for incorrect permit number | LONNYS | LONNYS | | BFR | R | 7839350 |
AVA'S CONSTRUCTION LLC | BFR | P | 08/21/2023 | level 1-3 laundry shaft wall left side of laundry -- dryer vent fire stop OK all levels / rear 1" core board and framing above left side of laundry OK all levels | LONNYS | LONNYS | | BFR | P | 7831872 |
AVA'S CONSTRUCTION LLC | BFR | P | 08/16/2023 | level 1 laundry shaft wall OK per UL U415 / still need to inspect firestop when ready | LONNYS | LONNYS | | BFR | P | 7827905 |
AVA'S CONSTRUCTION LLC | BFR | R | 08/16/2023 | plan uploaded has already been spliced into plan and approved | LONNYS | LONNYS | | BFR | R | 7827555 |
AVA'S CONSTRUCTION LLC | BFR | R | 08/01/2023 | LEVEL 1 LAUNDRY FIRE BARRIER // need to update approved plan for as built condition - plumbing now penetrating core board for shaft wall system - C-H studs are now flipped - C portion now on interior side of wall / fire barrier needs complete reinspection when built per plan or plan has been updated | LONNYS | LONNYS | | BFR | R | 7813694 |
AVA'S CONSTRUCTION LLC | BFR | P | 07/03/2023 | LEVEL 1 LAUNDRY FIRE BARRIER WALL FRAMING // east half only - wall framing and core board OK per UL U415 pending other required inspections | LONNYS | LONNYS | | BFR | P | 7788977 |
AVA'S CONSTRUCTION LLC | BSP | R | 06/14/2023 | level one laundry room wall framing / framing is not per approved plan for 1 hour fire barrier / missing CH channels and 1" shaft liner per UL U415 / note: UL 415 is proprietary to USG | LONNYS | LONNYS | | BSP | R | 7771173 |
AVA'S CONSTRUCTION LLC | BSP | P | 05/24/2023 | site visit to review project status and as built conditions / need to update plans for as built condition / reviewed rated assemblies,required PPRBD inspections, V-A construction, and rated assembly continuity requirements | LONNYS | LONNYS | | BSP | P | 7753249 |
AVA'S CONSTRUCTION LLC | BSP | P | 05/24/2023 | site visit to review project status and as built conditions / need to update plans for as built condition / reviewed rated assemblies,required PPRBD inspections, V-A construction, and rated assembly continuity requirements | LONNYS | LONNYS | | BSP | P | 7753250 |
AVA'S CONSTRUCTION LLC | BE | P | 01/18/2023 | | ASHLEYL | ASHLEYL | | BE | P | 7637653 |
AVA'S CONSTRUCTION LLC | BSP | P | 07/22/2022 | THIS IS A IEBC PERMIT Walked with electrician and site rep for questions and progress, discussed and viewed electric penetrations on the 3rd floor and penetration details with 3M firecaulking ( grey ) reviewed accessible elements. | NATHAN | NATHAN | | BSP | P | 7455882 |
EL PASO ELECTRIC, LLC. | E= | C | 01/18/2024 | fire stop complete and last unit--ok / | BRIAN | BRIAN | | E= | C | 7971687 |
EL PASO ELECTRIC, LLC. | ER | P | 01/11/2024 | last unit--ok / still need 1st floor hallway ceiling and fire stopping / | BRIAN | BRIAN | | ER | P | 7965934 |
EL PASO ELECTRIC, LLC. | E= | P | 11/20/2023 | 7 units---see plans / 2 units left / | BRIAN | BRIAN | | E= | P | 7923681 |
EL PASO ELECTRIC, LLC. | E= | P | 11/03/2023 | 2nd and 3rd floor units--see plans / | BRIAN | BRIAN | | E= | P | 7908280 |
EL PASO ELECTRIC, LLC. | E= | P | 11/02/2023 | 1st floor units--see plans / | BRIAN | BRIAN | | E= | P | 7906976 |
EL PASO ELECTRIC, LLC. | E= | P | 11/01/2023 | Rooms 1500- 1531 ok-- marked on plans | JIMMY | JIMMY | | E= | P | 7906261 |
EL PASO ELECTRIC, LLC. | E= | P | 10/27/2023 | 3rd floor units / marked on plans / | BRIAN | BRIAN | | E= | P | 7901529 |
EL PASO ELECTRIC, LLC. | E= | P | 10/25/2023 | 2nd floor north tower--ok / see plans | BRIAN | BRIAN | | E= | P | 7898726 |
EL PASO ELECTRIC, LLC. | E= | P | 10/17/2023 | 1st floor , 2nd floor , 3rd floor units ---see plans / | BRIAN | BRIAN | | E= | P | 7889968 |
EL PASO ELECTRIC, LLC. | E= | P | 10/13/2023 | 1562,1570,1574- install GFCI within 6' of sink / 1573, 1576- outlet next to sink and disposal has no power / 1571, 1572,1575,1577 okay / | MIGUEL | MIGUEL | | E= | P | 7887138 |
EL PASO ELECTRIC, LLC. | E= | P | 10/11/2023 | 1542,1534,1530 ok / 1550, 1536 require GFCI within 6' of sink/ no-one home at 1532,1538,1540 / | MIGUEL | MIGUEL | | E= | P | 7884318 |
EL PASO ELECTRIC, LLC. | E= | P | 10/04/2023 | 1568--2525--ok / not going to inspect finals until the recept over the new counter are installed due to the sink being centered / | BRIAN | BRIAN | | E= | P | 7876425 |
EL PASO ELECTRIC, LLC. | ER | P | 10/04/2023 | units 1554--1557--1556--1559--1560--1561--1563--1564--1565--1523--2523--3523---ok / | BRIAN | BRIAN | | ER | P | 7876419 |
EL PASO ELECTRIC, LLC. | E= | R | 09/28/2023 | No Answer at Call Ahead Number, No Answer at Door, Left Contact Information / | MIGUEL | MIGUEL | | E= | R | 7871666 |
EL PASO ELECTRIC, LLC. | E= | P | 09/25/2023 | units 1508--1523--1544--1546--1548--ok / 1543 need tr recept above counter / units 2521--ok / 2525 need recept over small counter next to fridge / rest not ready / | BRIAN | BRIAN | | E= | P | 7866888 |
EL PASO ELECTRIC, LLC. | ER | R | 09/25/2023 | not ready / | BRIAN | BRIAN | | ER | R | 7866834 |
EL PASO ELECTRIC, LLC. | EP | C | 09/15/2023 | new sub panels --ok / | BRIAN | BRIAN | | EP | C | 7857799 |
EL PASO ELECTRIC, LLC. | ER | P | 09/07/2023 | 1st floor ceiling / need fire stop at new holes / rest ok / | BRIAN | BRIAN | | ER | P | 7849684 |
EL PASO ELECTRIC, LLC. | EP | R | 09/07/2023 | need # 2 al for feed through to feed sub panel / | BRIAN | BRIAN | | EP | R | 7849680 |
EL PASO ELECTRIC, LLC. | ER | P | 08/24/2023 | N. tower 2552 and 2569 ok / | MIGUEL | MIGUEL | | ER | P | 7836192 |
EL PASO ELECTRIC, LLC. | ER | R | 08/21/2023 | not ready / | BRIAN | BRIAN | | ER | R | 7832001 |
EL PASO ELECTRIC, LLC. | ER | R | 08/16/2023 | not ready / | BRIAN | BRIAN | | ER | R | 7827972 |
EL PASO ELECTRIC, LLC. | ER | P | 08/14/2023 | N. tower: units 2564,2565,2566,2567,2568,2572 / walked w/ Robert w/ EL Paso / | MIGUEL | MIGUEL | | ER | P | 7825060 |
EL PASO ELECTRIC, LLC. | ER | R | 08/11/2023 | No Answer at Call Ahead Number | MIGUEL | MIGUEL | | ER | R | 7824057 |
EL PASO ELECTRIC, LLC. | ER | P | 08/02/2023 | North tower 2570, 1576,1577,1578,1579, 3554,35643565,3566,3567,3568,3569,3570,3572 | MIGUEL | MIGUEL | | ER | P | 7814859 |
EL PASO ELECTRIC, LLC. | ER | P | 07/27/2023 | units 1543--1544--1546--1556--1557--1559--1560--1562--1564--1566--1567--1569--1570--1571--1572--1573--1574--1575---ok / | BRIAN | BRIAN | | ER | P | 7809822 |
EL PASO ELECTRIC, LLC. | ER | P | 07/19/2023 | Plans not available to mark at this inspection - units 1508, 1546, 1552, 1561, 1564, 1567, 1573, 1574, 1575, 1579, and 3554 rough in ok | CHIPO | CHIPO | | ER | P | 7802732 |
EL PASO ELECTRIC, LLC. | E= | P | 04/18/2023 | north tower--- units 1502--1507--1511--1515--ok / | BRIAN | BRIAN | | E= | P | 7719211 |
EL PASO ELECTRIC, LLC. | E= | P | 04/07/2023 | 1506, 1507, 1509 all okay//// 1502 and 1507 need gfci protection on lower outlet within 6' of sink//// 1511 need gfci/afci protection and access under sink////// 1514 no power left of sink or outlet in cabinet, need afci/gfci and access under sink----------------- inspection stopped by Christian to address issues | MATTHEW | MATTHEW | | E= | P | 7710107 |
EL PASO ELECTRIC, LLC. | ER | P | 12/02/2022 | rooms marked on plans / | MIGUEL | MIGUEL | | ER | P | 7599410 |
EL PASO ELECTRIC, LLC. | E= | R | 10/11/2022 | laundry --ok / need units completed / | BRIAN | BRIAN | | E= | R | 7546967 |
EL PASO ELECTRIC, LLC. | ER | P | 09/27/2022 | PHASE 1--- 1st floor ceilings in center and south wing ---ok / | BRIAN | BRIAN | | ER | P | 7531504 |
EL PASO ELECTRIC, LLC. | ER | P | 09/07/2022 | 1st floor north wing laundry--ok / | BRIAN | BRIAN | | ER | P | 7508627 |
EL PASO ELECTRIC, LLC. | ER | P | 08/25/2022 | units 2502--2504 ----ok / | BRIAN | BRIAN | | ER | P | 7496221 |
EL PASO ELECTRIC, LLC. | ER | P | 08/11/2022 | units 1504--1503--1536--ok / 1st floor / | BRIAN | BRIAN | | ER | P | 7479238 |
EL PASO ELECTRIC, LLC. | E= | R | 08/11/2022 | NOTE NO MORE FINALS UNTIL THE ROOMS ARE COMPLETELY READY INCLUDING EXISTING CIRCUITS ARE CORRECTED / | BRIAN | BRIAN | | E= | R | 7479232 |
EL PASO ELECTRIC, LLC. | E= | R | 08/08/2022 | units 3578--3576--3543--3542--3506--2511---new elect ok but the existing is now non compliant /needs afci /gfci /tr on any recepts with in 6' of new sink / | BRIAN | BRIAN | | E= | R | 7474511 |
EL PASO ELECTRIC, LLC. | ER | P | 08/08/2022 | 1503--1502--ok | BRIAN | BRIAN | | ER | P | 7474502 |
EL PASO ELECTRIC, LLC. | E= | L | 08/05/2022 | see rough in notes | CHIPO | CHIPO | | E= | L | 7472580 |
EL PASO ELECTRIC, LLC. | ER | L | 08/05/2022 | Made call ahead. Arrived and manually called, gave my location at building and was told to wait for POC to come get me. Waited 12 minutes, 11 minutes past 30 minute call ahead, but no POC arrived. | CHIPO | CHIPO | | ER | L | 7472578 |
EL PASO ELECTRIC, LLC. | E= | R | 07/21/2022 | need existing recept with in 6' of new sink to be gfci / afci / tr / need building to inspect fire stop / | BRIAN | BRIAN | | E= | R | 7454820 |
EL PASO ELECTRIC, LLC. | E= | R | 07/14/2022 | 3rd floor units ---see plans / new work ok , need afci / gfci / tr recepts for any existing recept with in 6' of new sink / | BRIAN | BRIAN | | E= | R | 7446079 |
EL PASO ELECTRIC, LLC. | EP | P | 06/30/2022 | 3rd floor new sub panels --ok / | BRIAN | BRIAN | | EP | P | 7431258 |
EL PASO ELECTRIC, LLC. | ER | R | 06/30/2022 | 3rd floor hallway ceilings --elect ok / do not cover until fire stop has been inspected / | BRIAN | BRIAN | | ER | R | 7431233 |
EL PASO ELECTRIC, LLC. | ER | P | 06/16/2022 | 2nd floor north tower / 1st floor south and center , see plans / some units not ready or rented / | BRIAN | BRIAN | | ER | P | 7413563 |
EL PASO ELECTRIC, LLC. | ER | P | 06/09/2022 | rest of 3rd floor / south and center tower--ok / | BRIAN | BRIAN | | ER | P | 7405503 |
EL PASO ELECTRIC, LLC. | ER | P | 05/24/2022 | need list of occupied rooms for next inspection / need to install new devices at ada heights / units marked on plans /3rd floor north and center units / | BRIAN | BRIAN | | ER | P | 7386840 |
BLUE PHOENIX MECHANICAL, LLC | H= | C | 03/20/2024 | MECHANICAL CONTRACTOR COMPLETE. | PAULO | PAULO | | H= | C | 8027214 |
BLUE PHOENIX MECHANICAL, LLC | H= | P | 03/19/2024 | FINAL PENDING- MECHANICAL CONTRACTOR TO REVISE SCOPE OF WORK AS NOTED (7 DRYER EXHAUST, 1 DUCT (COMMENT- FIRE DAMPER). | PAULO | PAULO | | H= | P | 8026481 |
BLUE PHOENIX MECHANICAL, LLC | HD | C | 03/19/2024 | MECHANICAL CONTRACTOR TO REVISE SCOPE OF WORK AS NOTED (7 DRYER EXHAUST, 1 DUCT (COMMENT- FIRE DAMPER). Plan Splice (3-7-24/M2.01D) on file for previous note (Note #3). Note / Fire Damper installation ok. | PAULO | PAULO | | HD | C | 8026475 |
BLUE PHOENIX MECHANICAL, LLC | HSP | P | 03/18/2024 | UNABLE TO SEE THROUGH PHOTOS ATTACHED FOR CORRECTION. PLEASE CALL FOR A AN ON SITE INSPECTION, CONTRACTOR TO REVISE SCOPE OF WORK PER PREVIOUS NOTES. | PAULO | PAULO | | HSP | P | 8024233 |
BLUE PHOENIX MECHANICAL, LLC | H= | P | 03/08/2024 | WILL NEED TO REVIEW WITH PREVIOUS INSPECTOR AND VERIFY / WILL UPDATE NOTES AT THAT POINT | SEANM | SEANM | | H= | P | 8018176 |
BLUE PHOENIX MECHANICAL, LLC | H= | P | 02/29/2024 | MECHANICAL CONTRACTOR (23034/BLUE PHOENIX MECH.) IS TAKING CLAIM TO DRYER EXHAUST DUCTS & DAMPER, REVISE SCOPE OF WORK AS NOTED (7 DRYER EXHAUST, 1 DUCT (COMMENT- FIRE DAMPER)), REMOVE SCREWS FROM FIRE DAMPER FLANGE (MAY ATTACH CLEAR PHOTOS TO PERMIT AND RECALL FOR INSPECTION), NOTE #3 FOR DRYER EXHAUST DUCT WRAP HAS NOT BEEN APPLIED OR ENGINEER TO ADDRESS. | PAULO | PAULO | | H= | P | 8010246 |
BLUE PHOENIX MECHANICAL, LLC | HD | P | 02/22/2024 | HAD AN ON SITE DISCUSSION WITH THE MECHANICAL CONTRACTOR (Blue Phoenix/Hampton & GC/Geoffrey) ABOUT FIRE DAMPER INSTALLATION PER MANUFACTURE INSTRUCTIONS, INSTALLED DAMPER IS NOT TO INSTALLATION INSTRUCTIONS, SLEEVE TO BE SECURED TO DAMPER & ANGLES TO BE ON TOP & BOTTOM ONLY. | PAULO | PAULO | | HD | P | 8003169 |
BLUE PHOENIX MECHANICAL, LLC | HD | P | 02/21/2024 | Received photos (via text) of filler pieces (gypsum) with proper fastening & spacing.
CONTRACTOR TO ADDRESS- FIRE DAMPER NOT INSTALLED PER MANUFACTURE INSTRUCTIONS, MISSING ANGLES & TO BE INSTALLED PER INSTRUCTIONS PG.#218 & #221. | PAULO | PAULO | | HD | P | 8001969 |
BLUE PHOENIX MECHANICAL, LLC | HD | P | 02/14/2024 | Fire Damper (Lloyd 75) Inspection: Received photo via text for previous note.
Note / Fire Damper Framing ok (OK TO WRAP OPENING).. | PAULO | PAULO | | HD | P | 7996198 |
BLUE PHOENIX MECHANICAL, LLC | HD | P | 02/13/2024 | Fire Damper (Lloyd 75) Inspection: CONTRACTOR TO ADDRESS- NEED A DOUBLE JAM ON BOTH SIDES OF OPENING PER NOTE #6 (MAY ATTACH CLEAR PHOTOS TO PERMIT AND RECALL FOR INSPECTION)/rest of opening ok. | PAULO | PAULO | | HD | P | 7995019 |
BLUE PHOENIX MECHANICAL, LLC | HSP | P | 02/01/2024 | HAD DISCUSSION WITH GC (Geoffrey) ABOUT FIRE DAMPER INSTALLATION & RESPONSIBILITY FOR DAMPER FRAMING WITH INSTALLATION INSTRUCTIONS TO BE FOLLOWED FOR DAMPER FRAMING & INSTALLATION. REVIEWING PLANS FOR PLACEMENT & WALL ASSEMBLY. | PAULO | PAULO | | HSP | P | 7984456 |
BLUE PHOENIX MECHANICAL, LLC | HE | P | 01/31/2024 | | RITA | RITA | | HE | P | 7983265 |
DR. HYDRONIC ENGINEERING, LLC | H= | R | 11/02/2023 | CONTRACTOR HAS NO WORK AFFILIATED WITH THIS PERMIT, MAY VOID PERMIT IF NO WORK IS DONE UNDER CONTRACTOR #24140. INSPECTION FOR DRYER EXHAUST DUCTS FOR THIS CONTRACTOR (#24140) IS UNDER PERMIT #O11827 & WILL NEED TO BE ATTACHED FOR INSPECTION & INSPECTION NOTES. WILL NEED TO TRANSFER THESE NOTES & NOTES FROM 8/11/23 TO PERMIT #011827 WHEN ATTACHED. Note / Dryer Exhaust duct installation & termination ok x5. | PAULO | PAULO | | H= | R | 7976685 |
WESTERN PEAK PLUMBING LLC | HSP | P | 10/19/2023 | ATTACHED PERMIT TRANSFER REQUEST TO BE SUBMITTED TO RBD (PERMIT DEPARTMENT) FOR APPROVAL. | PAULO | PAULO | | HSP | P | 7892579 |
WESTERN PEAK PLUMBING LLC | HSP | P | 08/21/2023 | INSPECTION FOR INQUIRING ABOUT DRYER DUCTS & MOVING FORWARD TO VOID OFF THE PERMIT, CONTRACTOR MUST HAVE ANOTHER LICENSED MECHANICAL CONTRACTOR TO CLAIM ALL WORK FROM WESTERN PEAK BEFORE VOIDING CAN TAKE PLACE. | PAULO | PAULO | | HSP | P | 7832388 |
DR. HYDRONIC ENGINEERING, LLC | HD | R | 08/11/2023 | CONTRACTOR CLAIMS NO WORK ON THIS PERMIT, NEW WORK FOR THIS CONTRACTOR (#24140) IS ON PERMIT #O11827. North Wing- NEED LICENSED CONTRACTOR TO CLAIM FIRE DAMPER (M2.01D/ENLARGED ROOM DETAIL/NOTE #7). Level 1 M2.01D through M2.03D- Note / 5 Dryer Exhaust ducts & terminations ok. | PAULO | PAULO | | HD | R | 7976686 |
WESTERN PEAK PLUMBING LLC | HD | P | 10/10/2022 | Received un-approved plans for design change from previous notes (SEE IMAGES). | PAULO | PAULO | | HD | P | 7544552 |
WESTERN PEAK PLUMBING LLC | HD | P | 09/20/2022 | NEW DRYER EXHAUST DUCTS APPEAR TO BE PENETRATING RATED CONSTRUCTION ON ALL 3 FLOORS AND IS IN REVIEW AND IS NOT PER PLANS FOR IN WALL INSTALLATION NOTE (3), NEED INSTALLATION INSTRUCTIONS FOR ALL DRYERS ON SITE FOR INSPECTION. | PAULO | PAULO | | HD | P | 7523101 |
DR. HYDRONIC ENGINEERING, LLC | P= | C | 11/02/2023 | NOTE/ Front 5 washer boxes ok | CODYP | CODYP | | P= | C | 7906621 |
DR. HYDRONIC ENGINEERING, LLC | PTO+ | P | 08/11/2023 | Need plan revision for replaced showers in units 1523 and 1525, Need revision for new sink in unit 1535, NOTE/ DWV and water lines o.k./ Shower valves o.k. | CODYP | CODYP | | PTO+ | P | 7824254 |
DR. HYDRONIC ENGINEERING, LLC | PTO | P | 07/24/2023 | Left 5 washer boxes o.k./ Partial pending right 5 washer boxes on 1st floor | CODYP | CODYP | | PTO | P | 7806066 |
WESTERN PEAK PLUMBING LLC | P= | C | 02/28/2023 | | CODYP | CODYP | | P= | C | 7672029 |
ALPHALETE MECHANICAL LLC | P= | C | 02/28/2023 | | CODYP | CODYP | | P= | C | 7672028 |
ALPHALETE MECHANICAL LLC | P= | P | 02/22/2023 | Still need to remove washer boxes from scope of work, Need to complete unit 3577 | CODYP | CODYP | | P= | P | 7666993 |
ALPHALETE MECHANICAL LLC | P= | P | 02/17/2023 | Need scope of work corrected, Need unit 3577, NOTE/ Unit 1558 o.k. | CODYP | CODYP | | P= | P | 7663891 |
ALPHALETE MECHANICAL LLC | PSP | P | 02/16/2023 | To complete this permit need to see units 1558 and 3577/ Need engineers letter for AAV's at accessible units/ Need plan revision showing 7 washer boxes replaced instead of 10 | CODYP | CODYP | | PSP | P | 7662874 |
ALPHALETE MECHANICAL LLC | P= | P | 02/15/2023 | Need further review with previous inspector / looked at sinks in rooms 1521 / 1525 /2515 / 3515. | DANR | DANR | | P= | P | 7662701 |
ALPHALETE MECHANICAL LLC | PSP | P | 01/26/2023 | Need final on last 4 units for this permit, units 1521, 1525, 1558, and 3577, Need engineers letter for AAV's, Need plans changed to show 7 washer boxes being changed out instead of 10, correct scope of work to show 7 washer boxes | CODYP | CODYP | | PSP | P | 7645118 |
AFFORDABLE SERVICES CORP. | PTO | P | 12/07/2022 | NOTE/ Units 1521, 1525, 1558 o.k. | CODYP | CODYP | | PTO | P | 7602944 |
AFFORDABLE SERVICES CORP. | P= | P | 11/10/2022 | NOTE/ Units 2504 and 2502 o.k. | CODYP | CODYP | | P= | P | 7578746 |
WESTERN PEAK PLUMBING LLC | P= | P | 09/29/2022 | Still need plan revision for 7 washer boxes instead of 10 NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7534022 |
WESTERN PEAK PLUMBING LLC | PB | P | 09/20/2022 | Need nail protection at washer box drains, Need plan revision showing 7 new washer boxes 3 remaining existing, NOTE/ Rest o.k. | CODYP | CODYP | | PB | P | 7522528 |
WESTERN PEAK PLUMBING LLC | P= | L | 09/19/2022 | Field canceled by contractor | CODYP | CODYP | | P= | L | 7521676 |
AFFORDABLE SERVICES CORP. | P= | P | 09/08/2022 | NOTE/ Units 1500, 2500, 2506, 2508, 2532, 2533, 2534, 3532, 3533, 3534, 3536 o.k. | CODYP | CODYP | | P= | P | 7509698 |
AFFORDABLE SERVICES CORP. | P= | L | 09/01/2022 | Sent 1 hour call ahead at 8/ no contractor on site at 9:14 | CODYP | CODYP | | P= | L | 7503410 |
AFFORDABLE SERVICES CORP. | P= | L | 08/26/2022 | Field canceled by contractor | CODYP | CODYP | | P= | L | 7496858 |
AFFORDABLE SERVICES CORP. | PTO | P | 08/23/2022 | Need engineers letter for approval of AAV's, Need plan revision to remove washer boxes contractor states they are not replacing them, NOTE/ Units 2502 and 2504 o.k. | CODYP | CODYP | | PTO | P | 7491848 |
AFFORDABLE SERVICES CORP. | P= | P | 08/11/2022 | NOTE/ Units 3508, 3510, 3511, 3521, 3537, 3541, 3542, 3550, 3552 O.K. | CODYP | CODYP | | P= | P | 7479021 |
AFFORDABLE SERVICES CORP. | P= | P | 08/10/2022 | NOTE/ Units 2556, 2557, 2560, 2563, 2573, 2574, 2575, 2577 o.k. | CODYP | CODYP | | P= | P | 7477530 |
AFFORDABLE SERVICES CORP. | PTO | P | 08/09/2022 | NOTE/ Unit 1502 o.k. | CODYP | CODYP | | PTO | P | 7475706 |
AFFORDABLE SERVICES CORP. | P= | P | 08/09/2022 | NOTE/ Units 2526, 2527, 2528, 2529, 2530, 2537, 2539, 2540, 2541, 2563 o.k. | CODYP | CODYP | | P= | P | 7475705 |
AFFORDABLE SERVICES CORP. | P= | P | 08/04/2022 | NOTE/ Unit 1509, 1529, and 1532 o.k. | CODYP | CODYP | | P= | P | 7470812 |
AFFORDABLE SERVICES CORP. | P= | P | 08/03/2022 | NOTE/ Units 1529, 1540, 2544, 2550, 3506, 3509, 3535, 3538 o.k. | CODYP | CODYP | | P= | P | 7469270 |
AFFORDABLE SERVICES CORP. | PTO | P | 08/02/2022 | Need cabinets removed from units 3507 and 3508, Talked with contractor about washer boxes will need plan revision showing them removed, NOTE/ Units 1530, 1531, 1532, 1534, 2528, 2530, 2531, 3500, 3525, 3528, 3531, 3532, 3533, 3534 o.k. | CODYP | CODYP | | PTO | P | 7467699 |
AFFORDABLE SERVICES CORP. | PTO | P | 08/01/2022 | Still need washer boxes on scope, NOTE/ Units 1526, 1527, 2526, 2527, 2529, 3526, 3527, 3529 o.k. | CODYP | CODYP | | PTO | P | 7466304 |
AFFORDABLE SERVICES CORP. | PTO | P | 07/28/2022 | Still need washer boxes added to scope of work, NOTE/ Units 1519, 1539, 1540, 1541, 1542 o.k. | CODYP | CODYP | | PTO | P | 7462800 |
AFFORDABLE SERVICES CORP. | PTO | P | 07/27/2022 | Still need washer boxes added to scope of work, NOTE/ Units 1533, 1534, 2533, 2534, 3533, 3534 o.k. | CODYP | CODYP | | PTO | P | 7461208 |
AFFORDABLE SERVICES CORP. | P= | P | 07/26/2022 | Still need correction in unit 3538, NOTE/ Units 1535, 2535, 2538, 2544, 2550 o.k. | CODYP | CODYP | | P= | P | 7459564 |
AFFORDABLE SERVICES CORP. | PTO | P | 07/26/2022 | Still need to add washer boxes to scope of work, NOTE/ Units 1535, 2528, 3530 o.k. | CODYP | CODYP | | PTO | P | 7459562 |
AFFORDABLE SERVICES CORP. | P= | P | 07/25/2022 | Need to secure and caulk sink in unit 3538, NOTE/ Units 1529, 1517, 2501, 2514, 2562, 3506, 3509, 3571, 3573, 3574, 3578, 3579 o.k. | CODYP | CODYP | | P= | P | 7457921 |
AFFORDABLE SERVICES CORP. | PTO | P | 07/21/2022 | Need to be able to see piping can not cover with cabinets, NOTE/ Units 1501, 1519, 2544, 2546, 3506, 3509 o.k. | CODYP | CODYP | | PTO | P | 7454532 |
AFFORDABLE SERVICES CORP. | PTO | P | 07/18/2022 | note: units 1526, 1527, 1528, & 1535 ok | CODYP | CODYP | | PTO | P | 7449360 |
AFFORDABLE SERVICES CORP. | P= | P | 07/18/2022 | still need washer boxes added to scope and inspected / note:units 1506, 2543, 2558 ok | CODYP | CODYP | | P= | P | 7449357 |
AFFORDABLE SERVICES CORP. | P= | P | 07/14/2022 | Still need washer boxes added to scope and inspected, NOTE/ Units 3576, 3563, 3562, 3559, 3557, 3556, 3550, 3548, 3538, 3537, 3521, 3514, 2559, 2558, 2510, 2503, 2501, 1550, 1538, 1529 o.k. | CODYP | CODYP | | P= | P | 7445887 |
AFFORDABLE SERVICES CORP. | P= | P | 07/13/2022 | Units 2560,2561,2573,2574,2575,2577,2579,3501,3502,3503,3517,3519,3543,3544,3546,3560,3573,3574, 3575,3577,3579 o.k. | CODYP | CODYP | | P= | P | 7444143 |
AFFORDABLE SERVICES CORP. | PTO | P | 07/01/2022 | Need plan revision or engineers letter for AAVs at units 1503,1504,1505,1507, Need to add washer boxes to scope of work, NOTE/ Units 1529,1517,1515,1514,1511,1510 o.k. | CODYP | CODYP | | PTO | P | 7432813 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/28/2022 | Need to correct scope of work showing washer boxes, NOTE/ Units 2536,2537,2538,25392540,2541,2542 o.k. | CODYP | CODYP | | PTO | P | 7427576 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/27/2022 | Need washer boxes added to scope of work or get plan revision removing laundry area from the plans if no work is being performed, NOTE/ Units 2519,2517,2515,2514,2511,2510 o.k. | CODYP | CODYP | | PTO | P | 7425851 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/24/2022 | Units 3521,3519,3517,3515,3514,3511,3510 o.k. | CODYP | CODYP | | PTO | P | 7423978 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/17/2022 | Can not use pressure rated fittings/ Units 3537,3538,3539,3540,3541,3542 o.k./ | CODYP | CODYP | | PTO | P | 7415068 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/16/2022 | Units 3562,3563,3571,3573,3574,3575,3576,3577,3578, and 3579 o.k. | CODYP | CODYP | | PTO | P | 7413403 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/15/2022 | Still need correction to scope of work, NOTE/ Units 3501,3502,3503,3543,3544,3546,3548,3550,3556,3557,3558,3559,2560 o.k. | CODYP | CODYP | | PTO | P | 7411817 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/14/2022 | Still need scope corrected, UNITS 2548,25,50,2556,2557,2559,2560,2563,2571,2573,2574,2575,2577, and 2579 o.k. | CODYP | CODYP | | PTO | P | 7410143 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/10/2022 | Still need scope of work corrected, NOTE/ Units 1538,2501,2503,2535,2543,2558,2561,2576,2578 o.k. | CODYP | CODYP | | PTO | P | 7406848 |
AFFORDABLE SERVICES CORP. | PTO | R | 06/09/2022 | Trip fee waived this time only, Units that are needing to be inspected need to be ready stopped inspection after multiple units had no water, NOTE/ Unit 1550 only unit ready | CODYP | CODYP | | PTO | R | 7405432 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/08/2022 | Drains need to be connected and test ready at time of inspection/ Unit 1509 and 1506 o.k. | CODYP | CODYP | | PTO | P | 7403439 |
AFFORDABLE SERVICES CORP. | PTO | P | 06/07/2022 | Discussed future inspections and testing with contractor, Will need scope to reflect work performed, Water was shut off no inspection today | CODYP | CODYP | | PTO | P | 7401675 |
AFFORDABLE SERVICES CORP. | PTO | P | 05/27/2022 | Need to see shower valves that were replaced, Scope of work needs to reflect all plumbing work being done, Need to test all new dwv re inspect all, Need contractor on site for next inspection | CODYP | CODYP | | PTO | P | 7391753 |
BLUE PHOENIX MECHANICAL, LLC | XMS | T | 03/07/2024 | PAID (REC#2041595): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Revised dryer vent note | DALEH | DALEH | | XMS | T | 8017175 |
WESTERN PEAK PLUMBING LLC | XMS | P | 12/04/2023 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout revised | JUSTINC | JUSTINC | | XMS | P | 7934304 |
AVA'S CONSTRUCTION LLC | XBS | T | 12/04/2023 | PAID (REC#2012985): PLAN SPLICE FEE: $50 by: DANM for Construction: Adjust the laundry room to accommodate the mechanical make-up air louvre - the door has moved | DANM | DANM | | XBS | T | 7934194 |
AVA'S CONSTRUCTION LLC | XBS | P | 09/29/2023 | PLAN SPLICE: (No Fee) by: DANM for Construction: Scope of work removed on Structural sheets | DANM | DANM | | XBS | P | 7872198 |
EL PASO ELECTRIC, LLC. | XES | P | 09/15/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added Large Suite Detail. | BERTHA | BERTHA | | XES | P | 7858478 |
ALPHALETE MECHANICAL LLC | XPS | P | 09/11/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Revised sheet P2.03D. Added sheet P4.02D. | SHANEN | SHANEN | | XPS | P | 7852184 |
AVA'S CONSTRUCTION LLC | XBS | T | 09/11/2023 | PAID (REC#1987911): PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revision to large studio unit | DANM | DANM | | XBS | T | 7852018 |
AVA'S CONSTRUCTION LLC | XBS | T | 08/11/2023 | PAID (REC#1978082): PLAN SPLICE FEE: $50 by: DANM for Construction: Revised detail for fire rated wall to match field installation | DANM | DANM | | XBS | T | 7823802 |
AVA'S CONSTRUCTION LLC | XBS | T | 07/14/2023 | PAID (REC#1969925): PLAN SPLICE FEE: $50 by: DANM for Construction: Replace doors between units with rated wall construction and remove closet doors in units | DANM | DANM | | XBS | T | 7798322 |
EL PASO ELECTRIC, LLC. | XES | T | 06/15/2023 | PAID (REC#1962497): PLAN SPLICE FEE: $52.5 by: BERTHA for Electrical: Revised circuits, revised panels schedules. | BERTHA | BERTHA | | XES | T | 7772561 |
ALPHALETE MECHANICAL LLC | XPS | T | 06/14/2023 | PAID (REC#1961990): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 3 revisions: Adjusted sheet P3.01D. | SHANEN | SHANEN | | XPS | T | 7771449 |
WESTERN PEAK PLUMBING LLC | XMS | P | 02/16/2023 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised dryer vents routing to inside wall | JUSTINC | JUSTINC | | XMS | P | 7663173 |
AVA'S CONSTRUCTION LLC | XBS | T | 12/09/2022 | PAID (REC#1927208): PLAN SPLICE FEE: $50 by: DANM for Construction: Create shaft at Laundry Room | DANM | DANM | | XBS | T | 7606735 |
AFFORDABLE SERVICES CORP. | XPS | T | 10/20/2022 | PAID (REC#1908764): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 1&2 revisions: Adjusted sheet P2.00D, P3.01D and P6.00D. | SHANEN | SHANEN | | XPS | T | 7556526 |
EL PASO ELECTRIC, LLC. | XES | T | 07/06/2022 | PAID (REC#1882856): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added switch. | BERTHA | BERTHA | | XES | T | 7436203 |