KNOEBEL CONSTRUCTION, INC. | B= | C | 06/28/2023 | | ERIKK | ERIKK | | B= | C | 7784773 |
KNOEBEL CONSTRUCTION, INC. | B= | T | 06/01/2023 | PAID (REC#1958590): Trip fee assessed for TCO fee. Additional Inspections Required (computer generated): LANDMARK PLUMBING AND HEATING, INC. Plumbing Final Inspection is not Completed yet. | RITA | RITA | | B= | T | 7760167 |
KNOEBEL CONSTRUCTION, INC. | B= | P | 06/01/2023 | Temp CO: Pending plumbing and building finals ( Expires: 7/1/2023 12:00:00 AM) | RITA | RITA | | B= | P | 7760162 |
KNOEBEL CONSTRUCTION, INC. | B= | T | 04/27/2023 | PAID (REC#1950475): Trip fee assessed for TCO fee. Additional Inspections Required (computer generated): LANDMARK PLUMBING AND HEATING, INC. Plumbing Final Inspection is not Completed yet. | RITA | RITA | | B= | T | 7729394 |
KNOEBEL CONSTRUCTION, INC. | B= | P | 04/27/2023 | Temp CO: Pending plumbing and building finals ( Expires: 5/27/2023 12:00:00 AM) | RITA | RITA | | B= | P | 7729389 |
KNOEBEL CONSTRUCTION, INC. | B= | T | 03/30/2023 | PAID (REC#1943304): Trip fee assessed for TCO fee. Additional Inspections Required (computer generated): ADVANCED ELECTRIC GROUP Electrical Final Inspection is not Completed yet, PEAK HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING AND HEATING, INC. Plumbing Final Inspection is not Completed yet. | RITA | RITA | | B= | T | 7702436 |
KNOEBEL CONSTRUCTION, INC. | B= | P | 03/30/2023 | Temp CO: Pending plumbing, mechanical, electrical and building finals ( Expires: 4/29/2023 12:00:00 AM) | RITA | RITA | | B= | P | 7702434 |
KNOEBEL CONSTRUCTION, INC. | B= | P | 01/18/2023 | Temp CO: Pending fire, zoning electrical and building finals ( Expires: 2/17/2023 12:00:00 AM) | RITA | RITA | | B= | P | 7637498 |
KNOEBEL CONSTRUCTION, INC. | B= | P | 12/16/2022 | Temp CO: extension ( Expires: 1/15/2023 12:00:00 AM) | JANE | JANE | | B= | P | 7613522 |
KNOEBEL CONSTRUCTION, INC. | BE | T | 12/15/2022 | PAID (REC#1921274): TCO | JANE | JANE | | BE | T | 7612780 |
KNOEBEL CONSTRUCTION, INC. | B= | P | 12/15/2022 | building final OK pending other required inspections. Additional Inspections Required (computer generated): ADVANCED ELECTRIC GROUP Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, PEAK HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7611808 |
KNOEBEL CONSTRUCTION, INC. | B= | P | 12/13/2022 | building final OK pending other required inspections. Additional Inspections Required (computer generated): ADVANCED ELECTRIC GROUP Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, PEAK HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7609756 |
KNOEBEL CONSTRUCTION, INC. | B= | P | 11/18/2022 | Temp CO: pending required finals ( Expires: 12/18/2022 12:00:00 AM) | BRITNEY | BRITNEY | | B= | P | 7588418 |
KNOEBEL CONSTRUCTION, INC. | BSP | P | 11/18/2022 | Engineer letter for welding/bolting on file | DAKOTAB | DAKOTAB | | BSP | P | 7587979 |
KNOEBEL CONSTRUCTION, INC. | BFT | C | 11/17/2022 | Engineer letter for footing on file -- Open hole on file -- 1500 PSF | DAKOTAB | DAKOTAB | | BFT | C | 7587040 |
KNOEBEL CONSTRUCTION, INC. | B= | P | 11/17/2022 | need to complete all other required inspections / per previous comments, still need open hole and letters of observation for footing and all welds and structural bolting / need single action hardware at 1 of 2 entry doors, dead bolt only allowed at location , rest of final okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ADVANCED ELECTRIC GROUP Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, PEAK HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7586882 |
KNOEBEL CONSTRUCTION, INC. | BFR | P | 10/21/2022 | front entrance wall and soffit framing OK / still need to provide all 3rd party observations noted in previous inspecitions | LONNYS | LONNYS | | BFR | P | 7558605 |
KNOEBEL CONSTRUCTION, INC. | BSP | R | 09/26/2022 | gas line inspection to be requested by mech contractor for mech permit | LONNYS | LONNYS | | BSP | R | 7528997 |
KNOEBEL CONSTRUCTION, INC. | BFT | P | 08/22/2022 | provide open hole and footing obs. for column footings / 2 new grade wall forms and reinforcing OK per detail 5/S1.3 | LONNYS | LONNYS | | BFT | P | 7490286 |
KNOEBEL CONSTRUCTION, INC. | BFR | P | 08/18/2022 | decorative light gauge hanging high wall framing OK pending other required inspections / still need to provide all 3rd party inspections | LONNYS | LONNYS | | BFR | P | 7487982 |
KNOEBEL CONSTRUCTION, INC. | BFT | R | 08/11/2022 | column footing forms and reinforcing not per approved plan / discussed 3rd party inspections with site rep | LONNYS | LONNYS | | BFT | R | 7479268 |
KNOEBEL CONSTRUCTION, INC. | BFR | P | 08/03/2022 | pending other required inspections / will need to provide soils,open hole, footing and foundation observations for new store front / still need to inspect all store front framing when ready and provide 3rd party structural steel welding and bolting obs. by final / pending splice for new floor plan at area B observed plan on site -- remainder of interior wall, hard lid and soffit framing OK / reviewed accessible elements with site rep | LONNYS | LONNYS | | BFR | P | 7469595 |
KNOEBEL CONSTRUCTION, INC. | BFR | P | 07/01/2022 | pending other required inspections / need to splice in framing changes at toilet rooms, non sales, discount and office area as well as have inspected / still need to inspect store front when ready / still need to inspect all ceiling framing / will need to provide open hole for foundation extension / will need to provide 3rd party welding and bolting observations for structural steel / rest of interior light gauge steel framing OK | LONNYS | LONNYS | | BFR | P | 7433138 |
ADVANCED ELECTRIC GROUP | E= | C | 04/20/2023 | Splice accepted | BRETC | BRETC | | E= | C | 7721797 |
ADVANCED ELECTRIC GROUP | E= | P | 12/09/2022 | Remove second air curtain off electrical / 20 amp for air curtain - Ok / Splice required, please submit splice for changes in scope. If unfamiliar in submitting electronic splice, please click the following link: https://youtu.be/dG3kHpgDP0w / | BRETC | BRETC | | E= | P | 7605951 |
ADVANCED ELECTRIC GROUP | EP | C | 11/17/2022 | Panels and transformer - Ok | BRETC | BRETC | | EP | C | 7586433 |
ADVANCED ELECTRIC GROUP | E= | P | 11/17/2022 | Remove second air curtain off electrical / Need combustible document for air curtain / Air curtain will need to be on 15 amp brkr / Label panels and transformer / All A/C's x4 - ok, verify wire ties sunlight res. / Back of house - Ok / | BRETC | BRETC | | E= | P | 7586419 |
ADVANCED ELECTRIC GROUP | E= | P | 11/16/2022 | Did not see in elec panels, gutter preventing panel door to open / GEC from building steel to transformer will need to land on XO / Ko filler in disconnect / Complete re-inspect / Label all panels, disconnects and transformer | BRETC | BRETC | | E= | P | 7584799 |
ADVANCED ELECTRIC GROUP | E= | P | 11/14/2022 | Cannot have GFCI receptacles above 6'-7" in soffits out front | BRETC | BRETC | | E= | P | 7581940 |
ADVANCED ELECTRIC GROUP | ER | P | 10/18/2022 | Arula fitting room center lid ok | BRET | BRET | | ER | P | 7553476 |
ADVANCED ELECTRIC GROUP | ER | P | 10/10/2022 | Front show window floor receptacles in raised platform / Floor rated cut - in boxes | BRETC | BRETC | | ER | P | 7545469 |
ADVANCED ELECTRIC GROUP | ER | P | 09/30/2022 | Corrections made / Front areas walls and ceilings | BRETC | BRETC | | ER | P | 7535908 |
ADVANCED ELECTRIC GROUP | ER | R | 09/29/2022 | Install all ground tails in all j-boxes / Secure mc 12" from every j-box, cannot use grid ceiling grid wires for support, install separate electrical wiring supports / Need correct depth of ceiling octagon boxes or install arc shields at final / Front arch there are 2 buried j-boxes that wire will need to be re-ran and stubbed for cut box or arch will cover them / | BRETC | BRETC | | ER | R | 7535099 |
ADVANCED ELECTRIC GROUP | ER | R | 09/28/2022 | Need to run chandelier switch legs / Need ground tails for every ceiling box / demo 2 existing wall heaters above hard lid area in front | BRETC | BRETC | | ER | R | 7533143 |
ADVANCED ELECTRIC GROUP | ER | P | 09/01/2022 | Fire alarm is attached and complete / Ceiling inspection for Arula POS | BRETC | BRETC | | ER | P | 7504435 |
ADVANCED ELECTRIC GROUP | E= | R | 08/31/2022 | Fire alarm contractor will need to be attached and inspected before more inspections - remove sheet rock in all FA wall areas | BRETC | BRETC | | E= | R | 7501945 |
ADVANCED ELECTRIC GROUP | ESL | C | 08/31/2022 | 2 - floor boxes east side 3/4" Pvc | BRETC | BRETC | | ESL | C | 7501942 |
MERIDIAN FIRE AND SECURITY LLC | E= | C | 08/25/2022 | FIRE ALARM INSPECTION: | AARONR | AARONR | | E= | C | 7502069 |
MERIDIAN FIRE AND SECURITY LLC | ER | C | 08/25/2022 | FIRE ALARM INSPECTION: Fire alarm rough OK. | AARONR | AARONR | | ER | C | 7502071 |
MERIDIAN FIRE AND SECURITY LLC | E= | C | 08/25/2022 | FIRE ALARM INSPECTION: Fire alarm rough OK. | AARONR | AARONR | | E= | C | 7502068 |
ADVANCED ELECTRIC GROUP | ER | P | 08/25/2022 | AS Sales hard lid rough OK. --- AS FR Lounge hard lids OK. --- Front entry area not ready............Will need multiple access doors in various location for j-box's above hard lid. | AARONR | AARONR | | ER | P | 7495554 |
MERIDIAN FIRE AND SECURITY LLC | ER | P | 08/24/2022 | FIRE ALARM INSPECTION: Need to finish wall rough in ARULA SALES floor. --- Rest of area OK. | AARONR | AARONR | | ER | P | 7502070 |
ADVANCED ELECTRIC GROUP | ER | R | 08/17/2022 | Remove ceiling sheet rock in all fitting rooms / Fire alarm contractor will need to be attached and inspected before more inspections - remove sheet rock in all FA wall areas / ---------------- Ceiling rough inspection for rooms only: 117 Fitting lounge 107A-107H 103 (POS) 103A (CONCIERGE) 104 DISCOUNT) 102 (East soffit Sales Floor) | BRETC | BRETC | | ER | R | 7486610 |
ADVANCED ELECTRIC GROUP | ER | P | 07/26/2022 | Electrical Wall Rough Only - ok, FA not complete ---------------do not sheetrock--------------- / | BRETC | BRETC | | ER | P | 7460792 |
ADVANCED ELECTRIC GROUP | ER | P | 06/28/2022 | Fire Alarm will need to attach to permit / Ceiling hard lid boxes will need minimum 22 x 22 access doors / East half walls only - Ok / Wall rough between gridlines B to d & 1 to 5 / FA Pipe and boxes only - Ok | BRETC | BRETC | | ER | P | 7428208 |
ADVANCED ELECTRIC GROUP | ESL | P | 06/28/2022 | 3/4" to POS / 2 - 3/4" floor boxes | BRETC | BRETC | | ESL | P | 7428202 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 04/25/2023 | TEST AND BALANCE REPORT RECEIVED MECHANICAL FINAL-----------------COMPLETE | TREVORH | TREVORH | | H= | C | 7725838 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 04/24/2023 | MECHANICAL FINAL PENDING------------------------TEST AND BALANCE REPORT. | TREVORH | TREVORH | | H= | P | 7725478 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 01/05/2023 | meter identification on file see images. GAS FINAL----------------COMPLETE. | TREVORH | TREVORH | | H= | C | 7626045 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 11/17/2022 | MISSING SECONDARY DRAIN PROTECTION FOR ONE AHU UNITS / OK FOR PICS NEED ROOF ACCESS AT NEXT INSPECTION, / THERMOSTATS ARE INCOMPLETE AND CURRENT LOCATION WILL REQUIRE LOCK BOXES DUE TO THE REACH ACCESSIBILITY / BY FINAL WILL NEED TO SEE THE TEST AND BALANCE REPORT. LABEL EF-3 AND EF-4 / AHU-3 VENT SUPPORT AT THE CONCENTRIC KIT OK , | TREVORH | TREVORH | | H= | P | 7586554 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 11/17/2022 | GAS FINAL PENDING--------------- BRASS ID TAG AT METER. | TREVORH | TREVORH | | H= | P | 7586461 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 11/17/2022 | ADDING 280 BTU TO METER | TREVORH | TREVORH | | HC | C | 7586453 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 11/17/2022 | GAS PLAN SPLICE ON FILE PIPING RAN TO NEW PLAN, | TREVORH | TREVORH | | HI | C | 7586443 |
PEAK HEATING & AIR CONDITIONING, INC. | HV | P | 11/17/2022 | NEED TO REVIEW VENT TERMINATION. WILL UPDATE NOTES AFTER / | LIDO | LIDO | | HV | P | 7586294 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 11/17/2022 | /// UPDATED NOTES : MECHANICAL SPLICE DATED 9/13/22 DOES NOT SHOW AHU-3 LOCATION CHANGE TO SALES FLOOR OR DUCT CHANGES FOR FROM SQUARE TO ROUND FOR ALL AHU'S. NEED REVISED AND APPROVED PLANS /// MISSING SECONDARY DRAIN PROTECTION FOR ALL AHU UNITS / THERMOSTATS ARE INCOMPLETE AND CURRENT LOCATION WILL REQUIRE LOCK BOXES DUE TO THE REACH ACCESSIBILITY / BY FINAL WILL NEED TO SEE THE TEST AND BALANCE REPORT. LABEL EF-3 AND EF-4 / SEE HV NOTES / | LIDO | LIDO | | HD | P | 7586291 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 11/16/2022 | CHANGED TO HD INSPECTION / WILL NEED TO REVIEW WHAT INSPECTIONS ARE STILL NEEDED / NEED TO RESEARCH IF PLAN SPLICE AS DISCUSSED AT INSPECTION DATED 8-1-22 IS CORRECT / MISSING SECONDARY DRAIN PROTECTION FOR ALL AHU UNITS / NEED ROOF ACCESS AT NEXT INSPECTION, / THERMOSTATS ARE INCOMPLETE AND CURRENT LOCATION WILL REQUIRE LOCK BOXES DUE TO THE REACH ACCESSIBILITY / BY FINAL WILL NEED TO SEE THE TEST AND BALANCE REPORT. LABEL EF-3 AND EF-4 / AHU-3 VENT SUPPORT AT THE CONCENTRIC KIT OK , | LIDO | LIDO | | HD | P | 7585289 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 11/11/2022 | STILL AWAITING THE PLAN SPLICE AS DISCUSSED AT INSPECTION DATED 8-1-22, AHU-3 VENT NEEDS ADDITIONAL SUPPORT AT THE CONCENTRIC KIT, AT NEXT INSPECTION NEED A LADDER TO VERIFY SECONDARY DRAIN PROTECTION, NEED ROOF ACCESS AT NEXT INSPECTION, THERMOSTATS ARE INCOMPLETE AND CURRENT LOCATION WILL REQUIRE LOCK BOXES DUE TO THE REACH ACCESSIBILITY FLEX AND REGISTERS INSTALLED OK, BY FINAL WILL NEED TO SEE THE TEST AND BALANCE REPORT. WILL NEED ROOF ACCESS TO VERIFY EXHAUST AND VENT TERMINATIONS. | TREVORH | TREVORH | | HD | P | 7580780 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 10/03/2022 | PIPING INSTALL DOES NOT MATCH DRAWINGS, PER GENERAL CONTRACTOR THERE IS A SPLICE ADDRESSING THE GAS PIPING HOWEVER IT'S NOT ON FILE AT THIS TIME, CAN NOT RELEASE METER UNTIL APPROVED GAS PLAN IS ON FILE. 10 LB TEST OK 1-1/2'' MAIN TO FOUR 1'' OUTLETS. | TREVORH | TREVORH | | HI | P | 7538101 |
PEAK HEATING & AIR CONDITIONING, INC. | HV | P | 08/30/2022 | FURNACE VENTING X 4 RAN PER MANUFACTURES INSTALLATION INSTRUCTIONS, OK BY FINAL WILL NEED TO SEE VENT ACCELERATORS INSTALLED ON TERMINATIONS. | TREVORH | TREVORH | | HV | P | 7501269 |
PEAK HEATING & AIR CONDITIONING, INC. | HWP | P | 08/30/2022 | AT NEXT INSPECTION REQUEST WILL NEED INSTALLATION INSTRUCTIONS FOR THE CONDENSATE PUMPS , WILL NEED TO SEE CONDENSATE PUMPS LOCATIONS SHOWN ON PLANS, CONDENSATE DRAIN RAN PER PLAN, WILL NEED TO SEE 5 PSIG TEST FOR CONDENSATE IN CONCEALED LOCATIONS (ie) ABOVE HARD LIDS, BY FINAL WILL VERIFY SECONDARY DRAIN PROTECTION. | TREVORH | TREVORH | | HWP | P | 7501267 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/05/2022 | (DUCT ROUGH) SUPPLY AND EXHAUST FOR REST ROOMS 118 AND 119 OK, STILL NEED TO SEE CONTINUATION OF EXHAUST DUCTING THROUGH ROOF WHEN READY, DUCT WRAP FOR SUPPLY SERVING ARULA SALES FLOOR OK, AT NEXT INSPECTION REQUEST WILL VERIFY OUTSIDE AIR INTAKES AT EACH FURNACE. | TREVORH | TREVORH | | HD | P | 7472833 |
PEAK HEATING & AIR CONDITIONING, INC. | HRP | P | 08/05/2022 | IN WALL LINE SET INSTALL OK, ON 5 SETS, WHEN READY WILL VERIFY PRESSURE TEST | TREVORH | TREVORH | | HRP | P | 7472826 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/01/2022 | CURRENT INSTALL DOES NOT MATCH PLAN (ENGINEER TO ADDRESS) AHU-1,2 AND 3 HAVE BEEN RELOCATED FROM BACK OF HOUSE TO SALES FLOOR WILL NEED PLAN SPLICE , SUPPLY FED FROM THE PREVIOUSLY MENTIONED AHU'S HAVE BEEN CONVERTED FROM RECTANGLE TO ROUND WILL NEED DUCT SIZE ADDED TO DRAWING , ARULA SALES IS NOW A HARD LID CEILING . WILL NEED TO SEE SERVICE ACCESS TO AHU'S , NEED TO VERIFY, VENTING ,LINE SETS , CONDENSATE DRAIN LINES DO NOT CONCEAL UNTIL INSPECTED, ALL SUPPLY DUCTING MAINS AND ROUND LATERAL RUN OUTS AT EACH SALES FLOOR OK, EF-4 DUCTING ABOVE DRESSING ROOMS OK, STILL NEED TO SEE TIE IN TO EF-4 NO ROOF TODAY, NO OUTSIDE AIR DUCTING YET OR ANY OTHER EXHAUST DUCTING OR FANS AT THIS TIME. | TREVORH | TREVORH | | HD | P | 7466115 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/23/2023 | ok | TREBORB | TREBORB | | P= | C | 7781261 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 06/23/2023 | engineer letter for backflow attached / deleting isolation backflow on main water supply to tenant finish // | TREBORB | TREBORB | | P= | P | 7780188 |
LANDMARK PLUMBING AND HEATING, INC. | P= | L | 11/17/2022 | CANCELLED PER MIKE | LEE | LEE | | P= | L | 7587196 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | L | 11/17/2022 | CANCELLED PER MIKE | LEE | LEE | | PTO | L | 7587191 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 11/17/2022 | ENTRY FOR DREAM STEAMER BACKFLOW AND MIXING VALVE LETTER FROM ENGINEER -- STILL NEED SUB METER / R.P LETTER ( NOT INSTALLED AT THIS TIME ) | LEE | LEE | | P= | P | 7586161 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 11/15/2022 | SEE PTO | LEE | LEE | | P= | P | 7584219 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 11/15/2022 | DREAM STEAMERS NOT PLUMBED, PLANS REQUIRE 9-D WITH VENT FOR BACK-FLOWS - WHERE ARE YOU GOING TO PIPE THE DRAINS TO -- STILL NEED SPLICES / LETTERS FOR ITEMS PREVIOUSLY NOTED ( RESTROOM LAY-OUT OK ) -- PROVIDE PLUMBING INSTALLATION INSTRUCTIONS FOR WATER HOOK UP ON WATER VAPOR FIREPLACE AND INSTALL BACK-FLOW IF REQUIRED -- OTHER OK | LEE | LEE | | PTO | P | 7584216 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 08/24/2022 | STILL NEED REVISIONS -- DOMESTIC COLD TO BE INSULATED PER ENGINEER -- UPDATE - REVISIONS TO INCLUDE : DELETED R.P - DELETED MIXING VALVE AT W/H - TWO NEW STEAMER OUTLETS - RESTROOM LAY-OUT CHANGE | LEE | LEE | | PTO | P | 7494626 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 08/23/2022 | TEST LACKING AT MOP SINK VENT -- NEED TO ADD SUPPORT ON 3/4" COPPER AT WATER FEATURE H20 ( AT 90 DEGREE OFFSET ) -- NEED REVISIONS STILL | LEE | LEE | | PTO | P | 7493023 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 08/23/2022 | | LEE | LEE | | PB | C | 7492997 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 08/19/2022 | WATER FEATURE PIPING OK | LEE | LEE | | PB | P | 7489735 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | R | 08/12/2022 | PB INCOMPLETE -- NEED END OF LINE C/O ( SEE PREVIOUS NOTES ) -- NEED ADDED WATER FEATURE FOUNTAIN DWV WITH WATER SUPPLY COMPLETED -- PTO -- NEED TO COMPLETE VENTING AT MOP SINK -- NEED OTHER VTR PENETRATION -- ((( NEED ENGINEER TO APPROVE R.P DELETED AND TWO NEW STEAMER OUTLETS ))) | LEE | LEE | | PTO | R | 7481684 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 06/23/2022 | NEED PLANS REVISED TO SHOW RESTROOM LAY-OUT CHANGES -- LACKS END OF LINE FLOOR C/O ( SEE PLANS ) -- FLOOR DRAIN NOT VENTED TO CODE TOILET ROOM # 119 | LEE | LEE | | PB | P | 7422074 |
LANDMARK PLUMBING AND HEATING, INC. | PB | L | 06/21/2022 | cancelled by contractor. | TAYLOR | TAYLOR | | PB | L | 7418743 |
MERIDIAN FIRE AND SECURITY LLC | XES | T | 01/06/2023 | PAID (REC#1926558): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Removed air curtain. | BERTHA | BERTHA | | XES | T | 7628387 |
KNOEBEL CONSTRUCTION, INC. | XBS | T | 09/29/2022 | PAID (REC#1908762): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Structural detail revisions. | MICHAELA | MICHAELA | | XBS | T | 7534711 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 09/13/2022 | PAID (REC#1913999): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Cloud | DALEH | DALEH | | XMS | T | 7514677 |
KNOEBEL CONSTRUCTION, INC. | XBS | T | 09/13/2022 | PAID (REC#1901780): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Alteration to the exterior elevation | MICHAELA | MICHAELA | | XBS | T | 7514292 |
KNOEBEL CONSTRUCTION, INC. | XBS | T | 08/16/2022 | PAID (REC#1892113) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Floor plan revision | MICHAELA | MICHAELA | | XBS | T | 7484529 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 08/02/2022 | PAID (REC#1888162) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouds | DALEH | DALEH | | XMS | T | 7467503 |
ADVANCED ELECTRIC GROUP | XES | P | 08/01/2022 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Minor power and lighting revisions. Revised schedules. | BERTHA | BERTHA | | XES | P | 7466695 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | P | 08/01/2022 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Clouded revisions only: Adjusted sheet P1.0 and P2.0. | SHANEN | SHANEN | | XPS | P | 7466479 |
KNOEBEL CONSTRUCTION, INC. | XBS | T | 07/06/2022 | PAID (REC#1884496): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revised floor plan | MICHAELA | MICHAELA | | XBS | T | 7435560 |