EXECUTIVE CUSTOM CONSTRUCTION, INC. | B= | C | 09/21/2022 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 7525489 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | B= | P | 09/13/2022 | Final items OK pending all other finals. Additional Inspections Required (computer generated): BIBLE ELECTRIC, INC. Electrical Final Inspection is not Completed yet. | ADAML | ADAML | | B= | P | 7515506 |
EXECUTIVE CUSTOM CONSTRUCTION, INC. | BFR | P | 06/24/2022 | Pending all other required inspections / Light gauge metal framing OK for new offices and conference room / Reviewed accessible elements | ADAML | ADAML | | BFR | P | 7425022 |
BIBLE ELECTRIC, INC. | E= | C | 09/21/2022 | Corrections made | BRETC | BRETC | | E= | C | 7525488 |
BIBLE ELECTRIC, INC. | E= | P | 09/20/2022 | Install conference room floor box / Install panel schedules | BRETC | BRETC | | E= | P | 7522709 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 08/22/2022 | FIRE ALARM INSPECTION: All ceiling rough - OK | BRETC | BRETC | | E= | C | 7491190 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | C | 08/22/2022 | FIRE ALARM INSPECTION: All ceiling rough - OK | BRETC | BRETC | | ER | C | 7491189 |
BIBLE ELECTRIC, INC. | ER | R | 08/03/2022 | All low volt needs to be in and off grid / All existing low volt will need to be off grid / Fire Alarm contractors needs to attach to permit / Ceiling rough ok, FA not complete ---------do not close ceiling-------------- / | BRETC | BRETC | | ER | R | 7470370 |
BIBLE ELECTRIC, INC. | ER | P | 07/12/2022 | All walls - Ok | BRETC | BRETC | | ER | P | 7443393 |
BIBLE ELECTRIC, INC. | ER | P | 07/07/2022 | Walls - Ok, minus big office and conference room | BRETC | BRETC | | ER | P | 7437765 |
BIBLE ELECTRIC, INC. | ER | P | 06/17/2022 | 6 north office walls only - Ok | BRETC | BRETC | | ER | P | 7416201 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | C | 08/25/2022 | SPLICE ON FILE SHOWING THERMOSTAT LOCATIONS / MECHANICAL FINAL OK / | LIDO | LIDO | | H= | C | 7495969 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | P | 08/18/2022 | STAMPED ENGINEER LETTER APPROVING THE TEST AND BALANCE REPORT RECEIVED. SEE IMAGES / FINAL PENDING : NEED ENGINEER DETAIL FOR ALL RELOCATED THERMOSTAT LOCATIONS OR INSTALL PER PLAN / | LIDO | LIDO | | H= | P | 7486982 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | P | 08/12/2022 | FINAL PENDING : NEED ENGINEER DETAIL FOR ALL RELOCATED THERMOSTAT LOCATIONS OR INSTALL PER PLAN / NEED REVISED TEST AND BALANCE REPORT OR ENGINEER TO APPROVE THE READINGS. SEE TAB REPORT REVIEW NOTES / | LIDO | LIDO | | H= | P | 7481842 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HD | C | 08/12/2022 | DUCT ROUGH, SUPPLY GRILLS AND RETURN REGISTERS COMPLETE / | LIDO | LIDO | | HD | C | 7481832 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | P | 08/12/2022 | TEST AND BALANCE REPORT REVIEW : HP-1-1 - ALL GRILL READINGS ARE NOT PER THE DESIGNED CFM'S AND OUTSIDE THE 10% +/- ALLOWED / HP-3-2 - GRILL 6 READINGS ARE NOT PER THE DESIGNED CFM'S AND OUTSIDE THE 10% +/- ALLOWED /
| LIDO | LIDO | | H= | P | 7480678 |
NIELSEN MECHANICAL CONTRACTORS, LLC | H= | P | 08/11/2022 | TEST AND BALANCE REPORT IS BEING REVIEWED / | LIDO | LIDO | | H= | P | 7479010 |
NIELSEN MECHANICAL CONTRACTORS, LLC | HD | P | 07/26/2022 | PLAN PAGE M1.2 (BDA 14): HP-1 E BOX - MISSING SUPPLY AND RETURN GRILLS IN CONF / RECONFIG ROOM / REST OF FLEX DUCT, SUPPLY REGISTERS, AND RETURN AIR LAY- IN GRILLS OK / | LIDO | LIDO | | HD | P | 7459786 |
NIELSEN MECHANICAL CONTRACTORS, LLC | XMS | T | 08/10/2022 | PAID (REC#1890648): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised CFM values | JUSTINC | JUSTINC | | XMS | T | 7478580 |