M. BEATY DESIGN & BUILD, LLC | B= | C | 09/01/2022 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 7503008 |
M. BEATY DESIGN & BUILD, LLC | B= | P | 08/31/2022 | pending other required inspections, building okay. Additional Inspections Required (computer generated): HIGH PERFORMANCE PLUMBING Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7501846 |
M. BEATY DESIGN & BUILD, LLC | BSP | R | 08/31/2022 | plumbing photos need to be submitted by plumbing subcontractor to plumbing inspector | BOBF | BOBF | | BSP | R | 7501648 |
M. BEATY DESIGN & BUILD, LLC | BFR | P | 07/29/2022 | need to attach elec to permit / pending completion of all other required inspections, interior wall framing okay | BOBF | BOBF | | BFR | P | 7465333 |
OMEGA ELECTRICAL SERVICES LLC | E= | C | 08/31/2022 | | CRAIGS | CRAIGS | | E= | C | 7501842 |
OMEGA ELECTRICAL SERVICES LLC | E= | P | 08/30/2022 | gfci for the drinking fountain has to be accessible --- breaker locks for the hand dryer | CRAIGS | CRAIGS | | E= | P | 7501184 |
OMEGA ELECTRICAL SERVICES LLC | ER | P | 08/18/2022 | track lighting needs supported to the structure every 4' ---- back room 2x2 fixtures need supported back to structure --- leave tiles out in these areas for final | CRAIGS | CRAIGS | | ER | P | 7487061 |
OMEGA ELECTRICAL SERVICES LLC | ER | P | 08/04/2022 | 1" / 3/4" pvc to table legs and 1 floor plug ---------- west / south walls on sales floor ---------- drinking fountain / bathroom / vault room / break room / data board | CRAIG | CRAIG | | ER | P | 7471436 |
EPIC HVAC INC | H= | C | 08/31/2022 | NOTE / TAB REPORT RECEIVED / SEE IMAGES / | JERRYF | JERRYF | | H= | C | 7501301 |
EPIC HVAC INC | H= | P | 08/18/2022 | PARTIAL PENDING TAB REPORT NOTE / ALL CONTROLS / SA / RA / EXHAUST GRILLES ARE COMPLETE / | JERRYF | JERRYF | | H= | P | 7487866 |
EPIC HVAC INC | HD | P | 08/18/2022 | ABOVE CEILING SA / RA / MAINS / RUN OUTS / EXHAUST OK / | JERRYF | JERRYF | | HD | P | 7487863 |
HIGH PERFORMANCE PLUMBING | P= | C | 09/01/2022 | | CODYP | CODYP | | P= | C | 7503007 |
HIGH PERFORMANCE PLUMBING | PTO | C | 08/19/2022 | | JOSEPHD | JOSEPHD | | PTO | C | 7488610 |
HIGH PERFORMANCE PLUMBING | P= | P | 08/19/2022 | need open front toilet seat ipc 425.3, rest ok, Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / | JOSEPHD | JOSEPHD | | P= | P | 7488606 |
HIGH PERFORMANCE PLUMBING | PTO | P | 08/04/2022 | need to see water pipe insulation, need to see toilet flange set and anchored, need to see dwv vent connected, rest ok note: check electric water heater at final, discussed accessible requirements | JOSEPHD | JOSEPHD | | PTO | P | 7470842 |
HIGH PERFORMANCE PLUMBING | PB | C | 08/04/2022 | wraps ok | JOSEPHD | JOSEPHD | | PB | C | 7470835 |
HIGH PERFORMANCE PLUMBING | PB | P | 07/29/2022 | Need pipe wraps / rest ok. Note: By final fix scope of work ( remove whole house re-ipe and add 1 toilet, 1 lavatory, 1 sink, 1 floor drain, 1 drinking fountain 1 utility sink, and 1 water heater) | DANR | DANR | | PB | P | 7464490 |