STREAMHOME CONSTRUCTION LLC | B= | C | 09/28/2023 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 7870617 |
STREAMHOME CONSTRUCTION LLC | BE | P | 04/05/2023 | | AMYP | AMYP | | BE | P | 7707485 |
STREAMHOME CONSTRUCTION LLC | B= | P | 10/31/2022 | Building final items OK pending fire and mechanical. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), EAGLE PRECISION PLUMBING & MECHANICAL, L Mechanical Final Inspection is not Completed yet. | ADAML | ADAML | | B= | P | 7567596 |
STREAMHOME CONSTRUCTION LLC | B= | P | 10/28/2022 | pending other required inspections / missing entrance doors / missing international sign of accessibility at new rest room / rest OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), FOSTER ELECTRIC CORPORATION Electrical Final Inspection is not Completed yet, EAGLE PRECISION PLUMBING & MECHANICAL, L Mechanical Final Inspection is not Completed yet, TRI-STAR MECHANICAL Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7565926 |
STREAMHOME CONSTRUCTION LLC | BFR | P | 08/25/2022 | Provide backing for grab bars at restrooms. / Attach mechanical and electrical to permit. / Complete other rough inspections. / Reviewed Accessible Elements / | ERAMIREZ | ERAMIREZ | | BFR | P | 7496373 |
FOSTER ELECTRIC CORPORATION | E= | C | 10/31/2022 | Correction made with GFCI devices - complete | CHIPO | CHIPO | | E= | C | 7566857 |
FOSTER ELECTRIC CORPORATION | E= | R | 10/28/2022 | Need GFCI protection for south east corner room counter top receps - all else okay - Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / | CHIPO | CHIPO | | E= | R | 7565751 |
FOSTER ELECTRIC CORPORATION | E= | P | 10/17/2022 | Above ceilings okay | CHIPO | CHIPO | | E= | P | 7552046 |
FOSTER ELECTRIC CORPORATION | ER | C | 09/14/2022 | 517.13 wiring method in the suites OK --- matt s checking on why the 517.25 requirement | CRAIGS | CRAIGS | | ER | C | 7516954 |
FOSTER ELECTRIC CORPORATION | ER | R | 09/01/2022 | -------inspection performed by Brian Maxa--------stamp drawings show compliance with 517 NEC/ need to meet reach ranges on recep / complete re-inspect | MATTHEW | MATTHEW | | ER | R | 7504585 |
EAGLE PRECISION PLUMBING & MECHANICAL, LLC | H= | C | 11/10/2022 | ENGINEER LETTER RECEIVED FOR TEST AND BALANCE REPORT - SEE IMAGES | MARKB | MARKB | | H= | C | 7578546 |
EAGLE PRECISION PLUMBING & MECHANICAL, LLC | H= | P | 11/08/2022 | FINAL PENDING - Address test and balance report. THERMOSTATS COMPLETE. | MARKB | MARKB | | H= | P | 7576744 |
EAGLE PRECISION PLUMBING & MECHANICAL, LLC | H= | R | 11/01/2022 | TEST AND BALANCE REPORT IS STILL OUTSIDE ALLOWABLE +/- 10% | MATTM | MATTM | | H= | R | 7568495 |
EAGLE PRECISION PLUMBING & MECHANICAL, LLC | HSP | R | 10/13/2022 | Test and balance report is outside of 10% of approved plan. Either need engineer approval letter with engineer stamp or system balanced within 10% of approved plan. | MARKB | MARKB | | HSP | R | 7549053 |
EAGLE PRECISION PLUMBING & MECHANICAL, LLC | H= | P | 10/10/2022 | FINAL PENDING - Install thermostats. Provide test and balance report. SPLICE ON FILE. DRYER DUCT ADDRESSED. FLEX, DIFFUSERS AND GRILLS COMPLETE. | MARKB | MARKB | | H= | P | 7545292 |
EAGLE PRECISION PLUMBING & MECHANICAL, LLC | HD | P | 09/06/2022 | ----ENGINEER TO ADDRESS: Dryer and bath exhaust are routed different than shown on plans to different termination point.---- ABOVE CEILING DUCT - Contractor to address dryer duct in plenum and need to install lint trap per dryer booster install instructions. ABOVE CEILING SUPPLY DUCT INSTALLED PER PLAN OK TO WRAP. No flex or diffusers at this time. | MARKB | MARKB | | HD | P | 7507565 |
TRI-STAR MECHANICAL | P= | C | 10/28/2022 | | CODYP | CODYP | | P= | C | 7566011 |
TRI-STAR MECHANICAL | PTO | P | 08/26/2022 | Need engineers letter for AAV's at washer box, break room siink, and lav, Still need plan revision from previous inspection, NOTE/ Rest o.k. | CODYP | CODYP | | PTO | P | 7497236 |
TRI-STAR MECHANICAL | PB | P | 08/25/2022 | Need plan revision showing new location for break room sink, NOTE/ Rest o.k. for PB inspection | CODYP | CODYP | | PB | P | 7495483 |
FOSTER ELECTRIC CORPORATION | XES | T | 10/20/2022 | PAID (REC#1910432): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revised one line and panel schedules. | SHELBY | SHELBY | | XES | T | 7557744 |
TRI-STAR MECHANICAL | XPS | P | 10/06/2022 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 1 revisions: Adjusted sheet P1. | SHANEN | SHANEN | | XPS | P | 7541540 |
FOSTER ELECTRIC CORPORATION | XES | T | 09/20/2022 | PAID (REC#1903479): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add water heater. | SHELBY | SHELBY | | XES | T | 7523864 |
EAGLE PRECISION PLUMBING & MECHANICAL, LLC | XMS | T | 09/20/2022 | PAID (REC#1903751): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new dryer exhaust. | TCRIPPEN | TCRIPPEN | | XMS | T | 7522501 |