COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | C | 07/25/2023 | Observed corrections. / Trained DougC on the following items: Interior finishes, changes of occupancy and accessibility, | ERAMIREZ | ERAMIREZ | | B= | C | 7807346 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | P | 07/14/2023 | Temp CO: Pending final inspections ( Expires: 8/13/2023 12:00:00 AM) | JACKIEP | JACKIEP | | B= | P | 7798662 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | P | 06/12/2023 | Temp CO: Pending electrical and building finals ( Expires: 7/12/2023 12:00:00 AM) | RITA | RITA | | B= | P | 7769608 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | P | 05/15/2023 | Temp CO: need finals ( Expires: 6/14/2023 12:00:00 AM) | JANE | JANE | | B= | P | 7744729 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BSP | P | 05/05/2023 | training with inspector Paul P / reviewed accessible elements / interior finish vs. interior remodel / type of OCC - required egress components | LONNYS | LONNYS | | BSP | P | 7736908 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | B= | P | 05/05/2023 | Pending other required inspections
Top of sinks in both bathrooms over 34 inches Rest ok Training with Lonny S
-- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, DAVIS GAS SHOP INC Mechanical Final Inspection is not Completed yet, KENT SHEET METAL, INC Mechanical Final Inspection is not Completed yet, DMB PLUMBING SERVICES INC. Plumbing Final Inspection is not Completed yet. | PAULP | PAULP | | B= | P | 7736905 |
COMMERCE CENTER COMMERCIAL BUILDERS, INC. | BFR | P | 10/28/2022 | Complete other rough inspections. / Reviewed Accessible Elements / | ERAMIREZ | ERAMIREZ | | BFR | P | 7566734 |
EL PASO ELECTRIC, LLC. | ES | C | 07/24/2023 | Commercial Service: no action needed | JOHNN | JOHNN | | ES | C | 7805637 |
EL PASO ELECTRIC, LLC. | E= | C | 07/24/2023 | | JOHNN | JOHNN | | E= | C | 7805632 |
EL PASO ELECTRIC, LLC. | E= | P | 07/03/2023 | plans do not show series rated / still shows fully rated / | BRIAN | BRIAN | | E= | P | 7788663 |
EL PASO ELECTRIC, LLC. | E= | P | 06/26/2023 | still need plans spliced for series rating / roof ok / #2 bonding jumper--ok / panel sch--ok / | BRIAN | BRIAN | | E= | P | 7782423 |
EL PASO ELECTRIC, LLC. | E= | P | 04/12/2023 | still need : roof top unit, panel schedule, AIC labels, / notes: AIC at panel is 11.4K, has 10 K cb's, rest is ok | JOHNN | JOHNN | | E= | P | 7713938 |
EL PASO ELECTRIC, LLC. | ES | P | 03/10/2023 | Commercial Service: commercial, 200 amp,4w, ok to set meter/ CHECK LATER: 2al or 4cu bond jumper to gutter nipple/ | JOHNN | JOHNN | | ES | P | 7683899 |
EL PASO ELECTRIC, LLC. | ER | P | 02/17/2023 | above grid ceiling ok / | MIGUEL | MIGUEL | | ER | P | 7664729 |
EL PASO ELECTRIC, LLC. | ER | P | 11/16/2022 | walls complete, | JOHNN | JOHNN | | ER | P | 7585429 |
EL PASO ELECTRIC, LLC. | ER | P | 10/28/2022 | Soffits and hard lids / Need front sign circuit for next above ceiling inspection | BRETC | BRETC | | ER | P | 7566208 |
EL PASO ELECTRIC, LLC. | ER | P | 10/24/2022 | walls--ok | BRIAN | BRIAN | | ER | P | 7560003 |
EL PASO ELECTRIC, LLC. | ESL | C | 08/18/2022 | pvc pipe only / | BRIAN | BRIAN | | ESL | C | 7487887 |
DAVIS GAS SHOP INC | H= | C | 05/15/2023 | | MARKB | MARKB | | H= | C | 7744363 |
KENT SHEET METAL, INC | H= | C | 05/09/2023 | TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | C | 7738957 |
KENT SHEET METAL, INC | H= | P | 05/08/2023 | FINAL PENDING - Provide test and balance report CONDUIT FOR WATER HEATER VENT AND THERMOSTAT COMPLETE. | MARKB | MARKB | | H= | P | 7738819 |
KENT SHEET METAL, INC | HSP | P | 05/08/2023 | ENGINEER LETTER RECEIVED FOR WATER HEATER VENT - SEE IMAGES | MARKB | MARKB | | HSP | P | 7737708 |
KENT SHEET METAL, INC | HD | P | 03/24/2023 | ----ENGINEER TO ADDRESS: Water heater vent is not allowed to be in return plenum space.---- --APPEARS AT THIS TIME THAT REFRIGERATION EQUIPMENT WILL BE SELF CONTAINED. YOGURT MACHINES ARE PORTABLE SELF CONTAINED. ABOVE CEILING DUCT - FLEX AND DIFFUSERS ARE COMPLETE. | MARKB | MARKB | | HD | P | 7697816 |
KENT SHEET METAL, INC | HD | P | 10/18/2022 | NEED REFRIGERATION CONTRACTOR TO ATTACH TO PERMIT / No flex or diffusers or roof inspection at this time / Will need test and balance report by final / Verify duct smoke detector at final / | MATTM | MATTM | | HD | P | 7554461 |
DAVIS GAS SHOP INC | HC | C | 10/18/2022 | RELEASE METER | MATTM | MATTM | | HC | C | 7554460 |
DAVIS GAS SHOP INC | HI | C | 10/18/2022 | NEED REFRIGERATION CONTRACTOR TO ATTACH TO PERMIT / 10 LB TEST OK ON NEW AND EXISTING GAS SYSTEM / | MATTM | MATTM | | HI | C | 7554453 |
KENT SHEET METAL, INC | HD | P | 10/05/2022 | NEED REFRIGERATION AND GAS CONTRACTORS TO ATTACH TO PERMIT / DUCT INSTALLED PER PLANS / OK TO WRAP / No flex or diffusers or roof inspection at this time / All new material in plenum is required to be plenum rated per the 2015 IMC Section 602.2.1 / Will need test and balance report by final / Verify duct smoke detector at final / Further research required, will update ASAP (NO UPDATE REQUIRED) / | MATTM | MATTM | | HD | P | 7540665 |
DMB PLUMBING SERVICES INC. | P= | C | 05/24/2023 | | CODYP | CODYP | | P= | C | 7753306 |
DMB PLUMBING SERVICES INC. | P= | P | 05/10/2023 | Still need mixing valve at hand sink, Need to complete insulation on pvc in plenum, Missing trap guards at floor drains in restrooms, NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7740368 |
DMB PLUMBING SERVICES INC. | P= | P | 05/02/2023 | Need to verify Listing number on silver tape for duct around water heater vent needs to be UL 181, Need to properly seal all plenum rated insulation around pvc in ceiling, Need proper air gaps at t & p, 3 comp sink, and dump sink, Need mixing valve at hand sink, Need access to see water heater vent termination, NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7732923 |
DMB PLUMBING SERVICES INC. | PTO | P | 10/05/2022 | UPDATED 10/18/22 Water heater is called out to be Direct vent on plumbing but the model number for the water heater is a power vent 76k BTU water heater, Engineer to address this issue | CODYP | CODYP | | PTO | P | 7540402 |
DMB PLUMBING SERVICES INC. | PTO | P | 09/19/2022 | See PTO with updated notes on 10/18/22 NOTE/ Check water heater at final | CODYP | CODYP | | PTO | P | 7521262 |
DMB PLUMBING SERVICES INC. | PB | C | 08/16/2022 | | JOSEPHD | JOSEPHD | | PB | C | 7483832 |
EL PASO ELECTRIC, LLC. | XES | T | 07/19/2023 | PAID (REC#1971824): PLAN SPLICE FEE: $50 by: DANIELG for Electrical: Revised fault current information. | DANIELG | DANIELG | | XES | T | 7801754 |
EL PASO ELECTRIC, LLC. | XES | T | 06/30/2023 | PAID (REC#1966222): PLAN SPLICE FEE: $50 by: DANIELG for Electrical: Revised fault current schedule. | DANIELG | DANIELG | | XES | T | 7788107 |
DMB PLUMBING SERVICES INC. | XPS | T | 03/16/2023 | PAID (REC#1940336): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 1 revisions: Adjusted sheet P1. | SHANEN | SHANEN | | XPS | T | 7688714 |