TURNER CONSTRUCTION COMPANY | B= | C | 07/13/2023 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 7796745 |
TURNER CONSTRUCTION COMPANY | B= | P | 07/10/2023 | building final OK pending P=. Additional Inspections Required (computer generated): HEATING & PLUMBING ENGINEERS, INC Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7793782 |
TURNER CONSTRUCTION COMPANY | B= | P | 04/14/2023 | Provide above ceiling marking per 703.7 needed at end of staff hallway 1200, complete plumbing final and items. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection FHZ= by FIREDEPT is not Completed yet, HEATING & PLUMBING ENGINEERS, INC Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 7717105 |
TURNER CONSTRUCTION COMPANY | BFR | P | 02/06/2023 | Soffit and hard lid framing okay. | NATHAN | NATHAN | | BFR | P | 7653913 |
TURNER CONSTRUCTION COMPANY | BFR | P | 01/06/2023 | Reviewed 18" clear pull side of door for room 1217, With completed required inspections frame okay of all areas and rooms, install backing for accessible elements, reviewed accessible elements and dimensions of transfer showers. | NATHAN | NATHAN | | BFR | P | 7627791 |
TURNER CONSTRUCTION COMPANY | BFR | P | 12/12/2022 | With completed required inspections framing for 1200 hall, 1207 conference room, 1209 - 1212 telehealth and offices okay, discussed above ceiling marking by final inspection. | NATHAN | NATHAN | | BFR | P | 7607949 |
TURNER CONSTRUCTION COMPANY | BFR | P | 12/07/2022 | Inspection request is for damper framing which needs to be inspected by a mechanical inspector / Spoke to contractor via phone | ADAML | ADAML | | BFR | P | 7602925 |
STURGEON ELECTRIC CO INC | E= | C | 04/14/2023 | panel sch pics accepted / | BRIAN | BRIAN | | E= | C | 7716829 |
STURGEON ELECTRIC CO INC | E= | P | 04/10/2023 | Corrections made with GFCI protection and bath mirrors - still need panel schedule to complete - Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / | CHIPO | CHIPO | | E= | P | 7711379 |
STURGEON ELECTRIC CO INC | E= | P | 04/06/2023 | need gfci with in 6' of sink in 2 locations / panel sch / mirrors in bathrooms / rest ok / | BRIAN | BRIAN | | E= | P | 7708644 |
STURGEON ELECTRIC CO INC | ER | P | 03/31/2023 | grid ceiling common area --ok / | BRIAN | BRIAN | | ER | P | 7704124 |
STURGEON ELECTRIC CO INC | E= | C | 03/31/2023 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 7704123 |
STURGEON ELECTRIC CO INC | ER | C | 03/31/2023 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 7704120 |
STURGEON ELECTRIC CO INC | E= | P | 03/30/2023 | grid ceilings in rooms see plans / still need fire alarm / | BRIAN | BRIAN | | E= | P | 7702605 |
STURGEON ELECTRIC CO INC | ER | P | 03/09/2023 | bathroom hard lids / ( 3 ) | BRIAN | BRIAN | | ER | P | 7683378 |
STURGEON ELECTRIC CO INC | ER | P | 03/07/2023 | rest of the walls--ok / | BRIAN | BRIAN | | ER | P | 7679055 |
STURGEON ELECTRIC CO INC | ER | P | 01/31/2023 | walls see plans /marked on plans / | BRIAN | BRIAN | | ER | P | 7648998 |
STURGEON ELECTRIC CO INC | ER | P | 01/13/2023 | walls--see plans-- | BRIAN | BRIAN | | ER | P | 7635107 |
STURGEON ELECTRIC CO INC | ER | P | 12/08/2022 | 4 offices --see plans / | BRIAN | BRIAN | | ER | P | 7604542 |
HEATING & PLUMBING ENGINEERS, INC | HWP | C | 04/13/2023 | FINAL CONNECTIONS COMPLETE | MARKB | MARKB | | HWP | C | 7715897 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 04/12/2023 | TEST AND BALANCE REPORT RECEIVED - SEE IMAGES 5TH & 6TH FLOORS ARE UNDER CONSTRUCTION AND ARE ON THE SAME AIR HANDLING EQUIPMENT. THOSE FLOORS WILL GET THEIR OWN TEST AND BALANCE REPORT. | MARKB | MARKB | | H= | C | 7713804 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 04/04/2023 | FINAL PENDING - Provide test and balance report. FLEX, DIFFUSERS, GRILLS AND CONTROLS COMPLETE. | MARKB | MARKB | | H= | P | 7706719 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/22/2023 | ABOVE CEILING DUCT - MEDIUM PRESSURE CONNECTIONS AND VAV'S COMPLETE OK TO WRAP. FIRE/SMOKE DAMPERS - ANNULAR SPACE TO SHEET ROCK OK FOR BOTH DAMPERS. | MARKB | MARKB | | HD | P | 7667474 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 01/27/2023 | 60 PSI PRESSURE TEST FOR SUPPLY/RETURN HYDRONIC MAINS/BRANCHES OK TO INSULATE. Still need to complete piping at TB units. | MARKB | MARKB | | HWP | P | 7646591 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 01/11/2023 | ----ENGINEER TO ADDRESS: The return duct is not installed per approved plan.---- ABOVE CEILING DUCT - SUPPLY/EXHAUST, MAINS/BRANCHES, MEDIUM/LOW PRESSURE DUCT INSTALLED PER PLAN OK TO WRAP. No flex, diffusers or terminal boxes installed at this time. | MARKB | MARKB | | HD | P | 7631888 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/30/2022 | FIRE/SMOKE DAMPER FRAMING - FRAMING FOR 2 DAMPERS AT 1209 & 1210 OK. | MARKB | MARKB | | HD | P | 7623475 |
HEATING & PLUMBING ENGINEERS, INC | HD | R | 12/27/2022 | FIRE DAMPER FRAMING - Top and bottom damper framing needs to be tied into full length studs that go to floor and tabs fastened on both side of studs per manufacturer instructions. | MARKB | MARKB | | HD | R | 7619779 |
HEATING & PLUMBING ENGINEERS, INC | HD | R | 12/08/2022 | FIRE/SMOKE DAMPER FRAMING AT STAFF LOUNGE 309 - Both dampers not framed per manufacturer instructions. | MARKB | MARKB | | HD | R | 7604875 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 07/13/2023 | | CODYP | CODYP | | P= | C | 7796744 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 04/04/2023 | Both transfer type showers need to meet 36" by 36"/ Need to complete lav in room 1202/ Lav in patient bathroom 1202 does not meet 15" clearance to center/ NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7706637 |
HEATING & PLUMBING ENGINEERS, INC | PTO | C | 01/27/2023 | NOTE/ Discussed accessibility requirements with contractor/ Rest o.k. | CODYP | CODYP | | PTO | C | 7646914 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/11/2023 | Need to complete dwv in 1202, Exam room 1 and 2, Shower valves in both bathrooms, Need accessibility measurements, Need to see tie in NOTE/ In wall water lines and the rest of dwv o.k./ Over head water lines in bathrooms o.k./ Over head vents o.k./ | CODYP | CODYP | | PTO | P | 7631688 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 12/14/2022 | NOTE/ Room 1216T o.k./ Need tie in | CODYP | CODYP | | PB | P | 7610610 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 12/05/2022 | Looked at underground for room 1218T and 1214 only, Need to see tie in for both | CODYP | CODYP | | PB | P | 7599929 |
STURGEON ELECTRIC CO INC | XES | P | 03/24/2023 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: As built. | DANIELG | DANIELG | | XES | P | 7697487 |
HEATING & PLUMBING ENGINEERS, INC | XPS | P | 03/24/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 1, 2, 3 revisions: Adjusted sheet P-101, P-201 and PD-201. | SHANEN | SHANEN | | XPS | P | 7696881 |
HEATING & PLUMBING ENGINEERS, INC | XMS | P | 03/23/2023 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout revised | JUSTINC | JUSTINC | | XMS | P | 7696761 |
TURNER CONSTRUCTION COMPANY | XBS | T | 03/23/2023 | PAID (REC#1943245): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Add sheet A-551. Revised soffit framing. Revised ceiling heights. Revised door location at room 1207. | JUSTINL | JUSTINL | | XBS | T | 7696734 |