ZAPPLIN ELECTRIC LLC | E= | C | 01/19/2024 | 20 amp ckt ok | TIMA | TIMA | | E= | C | 7972673 |
ZAPPLIN ELECTRIC LLC | EP | L | 01/08/2024 | called contractor no answer left message to call back to verify if meeting on site no return call----will need point of contact --- | TIMA | TIMA | | EP | L | 7962413 |
ZAPPLIN ELECTRIC LLC | EE | L | 01/08/2024 | Renewed online for Half Fee at Jan 8 2024 7:01AM (RECEIPT #: 2022304) | WEBSITE | WEBSITE | | EE | L | 7961726 |
ALL TYPE MECHANICAL SERVICES INC | HV | R | 05/03/2024 | NOT READY, CONTRACTOR TO ADDRESS- Z-FLEX VENT INSTALLATION INSTRUCTIONS, NEED THE ADAPTOR FOR FLEX TO RIGID VENT PER PG.#24 THROUGH #26 FOR INSTALLATION PRACTICES, RUN FLUE VENT CONDENSATE THROUGH NEUTRALIZER. Note / Boiler installation & clearances ok / Outside Combustion Air to Mechanical Room / | PAULO | PAULO | | HV | R | 8073480 |
ALL TYPE MECHANICAL SERVICES INC | HV | R | 12/08/2023 | NOT READY, AFTER REVIEW OF THE Z-FLEX VENT INSTALLATION INSTRUCTIONS, NEED THE ADAPTOR FOR FLEX TO RIGID VENT PER PG.#24, CAN NOT CO-MINGLE 2 DIFFERENT VENT BRANDS UNLESS PER MANUFACTURE INSTRUCTIONS PG.# (Read the following before installation of venting system.) AS ROOF JACK, JACK CONNECTION, TERMINATION HOOD & VENTING ARE ALL OF METAL FAB, WATER LEAK COMING FROM ROOF JACK AT TERMINATION, REMOVE PVC PIPE BEING USED AS SUPPORT UNDER VENT IN CHIMNEY, NEED PROPER SUPPORT FOR ALL HORIZONTAL & VERTICAL VENTING. RE-INSPECT ALL. | PAULO | PAULO | | HV | R | 7940071 |
ALL TYPE MECHANICAL SERVICES INC | HV | P | 12/01/2023 | Received photos of lower vent connections inside chimney (SEE IMAGES). STILL NEED AN ON SITE VISIT TO VERIFY 8" Z-FLEX INSTALLATION WITH INSTRUCTIONS GIVEN, Z-FLEX WITHIN THE CHASE, TERMINATION & EQUIPMENT. | PAULO | PAULO | | HV | P | 7932626 |
ALL TYPE MECHANICAL SERVICES INC | HWP | C | 11/28/2023 | Inspection note to alert the state for a replacement boiler (1,250,000k). | PAULO | PAULO | | HWP | C | 7928414 |
ALL TYPE MECHANICAL SERVICES INC | HV | P | 11/28/2023 | Received attached un-approved revised plans (SEE IMAGES), NEED TO SUBMIT REVISED PLANS TO PPRBD FOR APPROVAL, STILL NEED AN ON SITE VISIT TO VERIFY 8" Z-FLEX FOR PREVIOUS NOTES, Z-FLEX WITHIN THE CHASE, TERMINATION & EQUIPMENT. | PAULO | PAULO | | HV | P | 7928376 |
ALL TYPE MECHANICAL SERVICES INC | HV | P | 11/27/2023 | Received Installation Instructions for Z-Flex venting (SEE IMAGES). | PAULO | PAULO | | HV | P | 7927270 |
ALL TYPE MECHANICAL SERVICES INC | H= | P | 11/22/2023 | Install instructions are for Metal Fab and only show up to 8 inch / Provide correct Z-Vent install manual and install correct size liner or have engineer address / Flex to extend past thimble per install instructions / recall inspection or attach clear photos Note: Regulator ok | SEANM | SEANM | | H= | P | 7926237 |
ALL TYPE MECHANICAL SERVICES INC | HI | C | 11/21/2023 | PLANS NOW ATTACHED / CONFIRMED GAS LINE PER PLANS | SEANM | SEANM | | HI | C | 7924685 |
ALL TYPE MECHANICAL SERVICES INC | HV | L | 11/17/2023 | PERMIT LOCKED TO KEEP IT IN ADMINISTRATIVELY CLOSED STATUS / CONTRACTOR TO SUBMIT PLANS FOR OUTSIDE GAS, INSIDE GAS & BOILER TO PPRBD FOR APPROVAL PRIOR TO NEXT INSPECTION (NO INSPECTION PRIOR TO APPROVED PLANS), NEED VENT (Z-VENT) INSTALLATION INSTRUCTIONS ON SITE FOR INSPECTION, INSTALLATION INSTRUCTIONS FOR GAS REGULATOR. RE-INSPECTION FOR ALL IS NEEDED. | PAULO | PAULO | | HV | L | 7923014 |
ALL TYPE MECHANICAL SERVICES INC | HE | L | 10/05/2023 | Renewed online for Half Fee at Oct 5 2023 2:37PM (RECEIPT #: 1995429) | WEBSITE | WEBSITE | | HE | L | 7879389 |
GLASER ENERGY GROUP INC. | HE | L | 07/03/2023 | Renewed online for Half Fee at Jul 3 2023 3:04PM (RECEIPT #: 1966518) | WEBSITE | WEBSITE | | HE | L | 7789224 |
ALL TYPE MECHANICAL SERVICES INC | HSP | P | 03/01/2023 | Received Engineered plans but un-approved from PPRBD for outside gas, inside gas & equipment schedule (SEE IMAGES). | PAULO | PAULO | | HSP | P | 7673164 |
ALL TYPE MECHANICAL SERVICES INC | HSP | P | 12/28/2022 | HAD PHONE CONVERSATION WITH (EVEN/ALL TYPE MECHANICAL) ABOUT THE PROGRESS OF THE JOB & HE HAS STATED THAT ALL TYPE MECHANICAL WILL BE TAKING OVER ALL NEW WORK BEING DONE TO INCLUDE OUTSIDE GAS AS GLASER WILL BE VOIDING THEIR PERMIT (PERMIT SCOPE FOR (ALL TYPE) WILL INCLUDE HO/HI/HV & HWP INSPECTIONS FOR SCOPE OF WORK BEING DONE AND PLANS ARE IN THE WORKINGS FOR ALL WORK BEING DONE TO BE SUBMITTED TO RBD FOR APPROVAL). | PAULO | PAULO | | HSP | P | 7621349 |
ALL TYPE MECHANICAL SERVICES INC | HI | P | 12/02/2022 | CONTRACTOR TO ADDRESS THE FOLLOWING-- ADD 1 GAS OUTLET TO THE SCOPE OF WORK, NEED APPROVED PLANS FOR INSIDE GAS LINE/NEW L.P. BOILER (1,250,000K) WITH VENT (CONTRACTOR IS PROCEEDING AT OWN RISK WITHOUT APPROVED PLANS & MAY NEED A RE-INSPECTION IF ENGINEERED PLANS DO NOT MATCH INSTALL). 10 lb test ok / Note / 60' of 1 1/4' blk to new Boiler (1,250,000k). | PAULO | PAULO | | HI | P | 7598644 |
ALL TYPE MECHANICAL SERVICES INC | HSP | P | 09/29/2022 | received Boiler installation instructions (SEE IMAGES). | PAULO | PAULO | | HSP | P | 7533800 |
GLASER ENERGY GROUP INC. | HO | C | 09/22/2022 | NEED ENGINEERED & APPROVED GAS PLANS FOR NEW GAS PIPING TO FOUNTAIN VALLEY AUTHORITY BUILDING AND CAUSTIC BUILDING (CONTRACTOR IS PROCEEDING AT OWN RISK/OK TO BURY). Note / 3/4" poly at 70' from L.P. tank to Caustic Building & 3/4" poly at 120' from L.P. tank to Fountain Valley Authority Building. | PAULO | PAULO | | HO | C | 7527007 |
GLASER ENERGY GROUP INC. | HO | P | 08/12/2022 | NEED ENGINEERED & APPROVED GAS PLANS FOR NEW GAS PIPING TO FOUNTAIN VALLEY AUTHORITY BUILDING AND CAUSTIC BUILDING, ALL GAS PIPING TO BE A MINIMUM OF 18" FROM TOP OF PIPING TO GRADE (EARTH) LEVEL. 10 lb test ok / Note / 3/4" poly at 70' from L.P. tank to Caustic Building & 3/4" poly at 120' from L.P. tank to Fountain Valley Authority Building. | PAULO | PAULO | | HO | P | 7481632 |
ALL TYPE MECHANICAL SERVICES INC | XMS | P | 01/11/2024 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 7966212 |