VERITAS CONSTRUCTION, INC. | B= | C | 07/20/2023 | All other required Final inspections are complete. (This is a computer generated result) | ADAML | ADAML | | B= | C | 7804091 |
VERITAS CONSTRUCTION, INC. | B= | P | 03/08/2023 | Pending Zoning. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | ADAML | ADAML | | B= | P | 7680877 |
VERITAS CONSTRUCTION, INC. | B= | P | 02/16/2023 | Final items OK Pending Zoning -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | ADAML | ADAML | | B= | P | 7662842 |
VERITAS CONSTRUCTION, INC. | B= | P | 12/12/2022 | With all completed final inspections b= okay. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), MURPHY CO MECH CONTRS & ENGNRS Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 7607870 |
ENCORE ELECTRIC, INC. | E= | C | 11/30/2022 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 7595837 |
ENCORE ELECTRIC, INC. | E= | C | 11/30/2022 | | BRIAN | BRIAN | | E= | C | 7595836 |
ENCORE ELECTRIC, INC. | ER | C | 11/30/2022 | | BRIAN | BRIAN | | ER | C | 7595833 |
ENCORE ELECTRIC, INC. | E= | C | 10/31/2022 | | BRIAN | BRIAN | | E= | C | 7567203 |
ENCORE ELECTRIC, INC. | ER | P | 09/23/2022 | interior pipe --ok / | BRIAN | BRIAN | | ER | P | 7527932 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | C | 01/17/2023 | CORRECTION MADE - SEE IMAGES | MARKB | MARKB | | H= | C | 7635573 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HC | C | 01/17/2023 | RELEASE METER TO UPGRADE TO 2 PSI FOR BUILDING #7 | MARKB | MARKB | | HC | C | 7635567 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HI | C | 01/17/2023 | ALL REGULATORS COMPLETE. | MARKB | MARKB | | HI | C | 7635552 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HI | P | 01/12/2023 | --2 PSI APPROVAL FROM CSU ON FILE --ENTIRE GAS SYSTEM NEW AND EXISTING WAS OK FOR PRESSURE TEST UNDER PAST PRESSURE TEST. STILL NEED - AHU-4 still needs an external gas regulator installed. Existing 2 rtu's on lower roof require proper outdoor regulator vent protection (cannot use vent limiters outdoors). Label all existing and new gas piping every 10' for medium pressure per 2017 RBC section 305.4.2. | MARKB | MARKB | | HI | P | 7633203 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HI | L | 12/30/2022 | CALL AHEAD STATED GUYS WERE ON THEIR WAY - WAITED 20 MINS AND NO CONTRACTORS ON SITE. | MARKB | MARKB | | HI | L | 7623457 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HSP | R | 12/27/2022 | Gas connection diagram needs to be part of elevated pressure splice that needs to be stamped by engineer and submitted to plan review. | MARKB | MARKB | | HSP | R | 7619545 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HSP | P | 12/20/2022 | INSPECTION TODAY WAS BECAUSE CONTRACTOR WANTS TO INCREASE GAS PRESSURE TO BUILDING (service currently has 11" w.c. regulator) - Will need engineer plan to show what pressure it needs to be increased to. Engineer will need to show all existing and new appliances on plan. Will need a pressure test on all existing gas piping for this building. Will need an increased pressure approval from CSU for building #7. If increasing to medium pressure, will need medium pressure labels and regulators installed. Inspector will need to verify all existing and new gas appliances have regulators installed for a medium pressure system. | MARKB | MARKB | | HSP | P | 7616166 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | H= | P | 11/29/2022 | FINAL PENDING - Install secondary condensate switches in RTU'S and provide test and balance report. | MARKB | MARKB | | H= | P | 7595136 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HD | C | 11/29/2022 | ALL DUCT IS EXPOSED AND INSTALLED PER PLAN. | MARKB | MARKB | | HD | C | 7595133 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HC | C | 11/29/2022 | REMOVED UNIT HEATERS FROM GYM AND ADDED 3 RTU'S PER PLAN. | MARKB | MARKB | | HC | C | 7595131 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HI | P | 11/29/2022 | --INSPECTION CHANGED TO PARTIAL SO CONTRACTOR COULD ELEVATE PRESSURE WITH NEW SPLICE 12/30/22.-- FINAL GAS CONNECTIONS COMPLETE. | MARKB | MARKB | | HI | P | 7595130 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HO | P | 10/04/2022 | 60 LB TEST OK / GAS PER PLANS FROM VALVE ON SECOND FLOOR TO ALL RTU's / | MATTM | MATTM | | HO | P | 7538582 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | HI | P | 08/25/2022 | 60 PSI PRESSURE TEST ON 4" WELDED PIPE FROM METER TO VALVE A SECOND FLOOR INSTALLED PER PLAN OK TO COVER AT FIRST FLOOR. | MARKB | MARKB | | HI | P | 7495495 |
MURPHY COMPANY MECHANICAL CONTRACTORS AND ENGINEERS. | XMS | T | 12/29/2022 | PAID (REC#1923553): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised for 2psi gas | JUSTINC | JUSTINC | | XMS | T | 7621952 |
VERITAS CONSTRUCTION, INC. | XBS | T | 10/07/2022 | PAID (REC#1905480): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised opening requirements. | SHELLEY | SHELLEY | | XBS | T | 7543664 |