CASCO ENTERPRISES, INC. | B= | C | 07/31/2023 | All other required Final inspections are complete. (This is a computer generated result) | SHAUN | SHAUN | | B= | C | 7812994 |
CASCO ENTERPRISES, INC. | B= | P | 07/12/2023 | Building final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, MICK HEATING & SHEET METAL CO. Mechanical Final Inspection is not Completed yet. | SHAUN | SHAUN | | B= | P | 7795568 |
CASCO ENTERPRISES, INC. | BFR | P | 11/08/2022 | Pending all other required inspections / Metal framing OK / Backing in restrooms must be non combustible material as this is a 1B building / Reviewed accessible elements | ADAML | ADAML | | BFR | P | 7576890 |
MATRIX ELECTRIC, INC. | E= | C | 06/29/2023 | Splice ok | JIMMY | JIMMY | | E= | C | 7785990 |
MATRIX ELECTRIC, INC. | E= | P | 06/01/2023 | Splice still shows RL1 as 200 amp main breaker--- all else ok RTU, panel RL2, kitchen, dining, bathrooms all ok | JIMMY | JIMMY | | E= | P | 7760484 |
MATRIX ELECTRIC, INC. | ER | C | 06/01/2023 | Ceilings ok | JIMMY | JIMMY | | ER | C | 7760474 |
MATRIX ELECTRIC, INC. | EP | P | 04/27/2023 | will need to revise plans to show new panel RL1 is main lug only---- | TIMA | TIMA | | EP | P | 7728771 |
MATRIX ELECTRIC, INC. | ES | C | 04/27/2023 | Commercial Service: 200 amp 4/w ok to set meter | TIMA | TIMA | | ES | C | 7728770 |
MATRIX ELECTRIC, INC. | ER | P | 12/01/2022 | 3 bathroom hard lids ok / | MIGUEL | MIGUEL | | ER | P | 7598096 |
MATRIX ELECTRIC, INC. | ER | P | 11/07/2022 | Walls ok--- Walls still need inspecting is marked in pink on page E1.1 on site ---- Note for future--suite 100 is currently addressed 3015 | JIMMY | JIMMY | | ER | P | 7574610 |
MICK HEATING & SHEET METAL CO. | H= | C | 07/28/2023 | CORRECTION MADE, SEE IMAGES / | MATTM | MATTM | | H= | C | 7810824 |
MICK HEATING & SHEET METAL CO. | H= | P | 07/26/2023 | FIX HOLE IN WELDED PATCH ON EF 2 / PLUMBING STACK WITHIN 10 FEET OF MAU INTAKE / OK TO ATTACH PICTURES TO NEXT INSPECTION REQUEST / INTERLOCKS VERIFIED / | MATTM | MATTM | | H= | P | 7808845 |
MICK HEATING & SHEET METAL CO. | HD | R | 07/25/2023 | CHANGED TO HD / INSPECTION FOR EXHAUST FANS ONLY: THERE'S A HOLE IN THE PATCH WELD ON EXHAUST FAN #2 / NEED CONTRACTOR ON-SITE FOR FINAL SO INTERLOCKS CAN BE VERIFIED / | MATTM | MATTM | | HD | R | 7807510 |
MICK HEATING & SHEET METAL CO. | H= | P | 07/25/2023 | NOTE / TAB REPORT RECEIVED / | JERRYF | JERRYF | | H= | P | 7806850 |
MICK HEATING & SHEET METAL CO. | HSP | P | 06/08/2023 | ELECTRICAL WHIP CAN NOT PENETRATE THROUGH GREASE DUCT OR FAN. NEED TO PATCH HOLES ON BOTH. FAN NEEDS TO OPEN FULLY TO STOPS. | NICKE | NICKE | | HSP | P | 7766659 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | H= | C | 06/07/2023 | NOTE / CORRECTION MADE / SEE IMAGES / | JERRYF | JERRYF | | H= | C | 7764761 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | H= | P | 06/06/2023 | PARTIAL PENDING REMOVING REGULATORS INSTALLED ON ROOF ((CONTRACTOR TO ATTACH PICTURES TO NEXT INSPECTION REQUEST)) NOTE / ALL TIE DOWN / FINAL CONNECTIONS / DISCONNECTS ARE COMPLETE AT OTHER OTHER EQUIPMENT | JERRYF | JERRYF | | H= | P | 7763545 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HC | C | 05/01/2023 | RELEASE METER | JERRYF | JERRYF | | HC | C | 7731458 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HI | C | 05/01/2023 | AT FUTURE INSPECTION VERIFY TIE DOWNS AND DISCONNECTS UNDER HOOD AND FINAL CONNECTIONS ON ROOF NOTE / PRESSURE TEST ON COOK LINE (((OK))) / ALL LINES CAPPED | JERRYF | JERRYF | | HI | C | 7731448 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | HI | P | 04/28/2023 | NEED THE FOLLOWING - UNION INSTALLED AT ANSUL VALVE - PRESSURE TEST ON COOK LINE - CAP OR CONNECT ALL OPEN LINES - VERIFY ALL DISCONNECTS AND TIE DOWNS UNDER HOOD AT FUTURE INSPECTION NOTE / PRESSURE TEST ON ROOF OK / PIPING PER PLAN FOR ROOF / | JERRYF | JERRYF | | HI | P | 7729987 |
MICK HEATING & SHEET METAL CO. | HD | P | 01/05/2023 | THIS INSPECTION FOR KITCHEN AREA ABOVE GRID. NEED SPLICE FOR HOODS. SEE PREVIOUS INSPECTION NOTES. NOTE / DUCT, FLEX, AND DIFFUSERS OK FOR SUPPLY AND EXHAUST FAN IN KITCHEN AREA. | NICKE | NICKE | | HD | P | 7626595 |
MICK HEATING & SHEET METAL CO. | HD | P | 12/13/2022 | NEED APPROVED PLAN SPLICE FOR ACCUREX HOODS WHERE PLANS SHOW VENTILATION DIRECT HOODS NOTE / 2 LAYERS GREASE WRAP ONLY OK / | JERRYF | JERRYF | | HD | P | 7609995 |
MICK HEATING & SHEET METAL CO. | HD | P | 12/09/2022 | NOTE / GREASE DUCT AND MUA DUCT OK TO WRAP / | JERRYF | JERRYF | | HD | P | 7606002 |
MICK HEATING & SHEET METAL CO. | HD | P | 12/01/2022 | 1 PIN-HOLE AT TRANSITION WELD. MARKED WITH ARROWS, DATED TODAYS DATE, AND INSPECTORS INITIALS. SECOND SPOOLED PIECE OK. | BILLS | BILLS | | HD | P | 7597247 |
MICK HEATING & SHEET METAL CO. | HD | P | 11/09/2022 | THIS INSPECTION WAS FOR TO GREASE DUCT DROPS FROM CURBS - 2 LAYERS WRAP (((OK))) - HOOD WALL PLUMBING INSPECTOR TO VERIFY INSULATION PAPER HAS BEEN REMOVED FROM WATER PIPING IN WALL ((((OK)))) | JERRYF | JERRYF | | HD | P | 7577410 |
MICK HEATING & SHEET METAL CO. | HSP | P | 11/09/2022 | WILL NEED INSTALLATION MANUAL FOR WRAP WHEN INSPECTION IS CALLED NOTE / PICTURES OF 1ST AND 2ND LAYER GREASE WRAP RECEIVED - SEE IMAGES / ((((WRAP OK)))) | JERRYF | JERRYF | | HSP | P | 7576995 |
MICK HEATING & SHEET METAL CO. | HD | P | 11/07/2022 | AT FUTURE INSPECTION VERIFY GREASE WRAP INSTALLATION AND WELDS AT CONNECTIONS ABOVE HOODS / WILL NEED GREASE WRAP INSTALLATION MANUAL FOR INSPECTION NOTE / LIGHT TEST ON TO EXHAUST DROPS FOR CURBS (((OK)) - 2 16 X 16 DROPS 6' LONG / | JERRYF | JERRYF | | HD | P | 7574472 |
MICK HEATING & SHEET METAL CO. | HD | P | 10/31/2022 | THIS INSPECTION WAS FOR RESTROOM HARD LID AREA'S ONLY NOTE / SA / EX MAINS AND RUN OUTS OK IN RESTROOMS ONLY / | JERRYF | JERRYF | | HD | P | 7567246 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | P= | C | 07/31/2023 | | CODYP | CODYP | | P= | C | 7812993 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | P= | P | 07/07/2023 | UPDATED 7/26/23 Can not reduce t & p drain from 1" to 3/4" | CODYP | CODYP | | P= | P | 7792420 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PTO | C | 06/26/2023 | Note/ Grease vent o.k. | CODYP | CODYP | | PTO | C | 7782501 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | P= | P | 06/13/2023 | Upon further review partial pending grease interceptor vents being completed in unfinished unit next door, NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7770642 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | P= | P | 06/07/2023 | Toilet in women's restroom still lacks 16-18" side clearance, NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7765505 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | P= | P | 06/06/2023 | Water heater t & p lacks air gap, Women's restroom accessible toilet lacks 16-18" side clearance, Need to see back flow preventer for soda machine, NOTE/ Rest o.k. | CODYP | CODYP | | P= | P | 7764331 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PAV | P | 05/09/2023 | WATER HEATER VENT AND TEST O.K./ Support concentric vent by final | CODYP | CODYP | | PAV | P | 7739871 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PAV | P | 05/05/2023 | Need to test through all fittings, Need to have access to roof to check vent termination location, Re inspect vent, o.k. to attach photo of vent test at next inspection request | CODYP | CODYP | | PAV | P | 7737380 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PTO | P | 11/14/2022 | Need engineers letter for AAV @ Kitchen mop sink and ice maker floor sink, Need to see vtr penetrations, NOTE/ Over head water lines and venting o.k./ Check insulation and mech room at final | CODYP | CODYP | | PTO | P | 7582805 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PTO | P | 11/04/2022 | NOTE/ In wall dwv and water lines o.k. only | CODYP | CODYP | | PTO | P | 7573922 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PB | C | 09/29/2022 | | TAYLOR | TAYLOR | | PB | C | 7535067 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PB | P | 09/26/2022 | Need to see grease vents, NOTE/ Rest o.k .for PB Inspection | CODYP | CODYP | | PB | P | 7530200 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PB | P | 09/19/2022 | Need pipe wrap on risers and shallow area, Need to see grease stubbed out, NOTE/ Rest o.k. | CODYP | CODYP | | PB | P | 7521608 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | PB | L | 09/16/2022 | no key in lock box. | TAYLOR | TAYLOR | | PB | L | 7520276 |
MATRIX ELECTRIC, INC. | XES | T | 06/07/2023 | PAID (REC#1960425): PLAN SPLICE FEE: $50 by: RICHG for Electrical: REVISED ONE LINE AND PANEL SCHEDULE. PER INSPECTION SPLICED PANEL | RICHG | RICHG | | XES | T | 7765553 |
MATRIX ELECTRIC, INC. | XES | T | 05/09/2023 | PAID (REC#1953288): PLAN SPLICE FEE: $50 by: RICHG for Electrical: REVISED ELECTRICAL PLAN SHEETS. | RICHG | RICHG | | XES | T | 7739993 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | XPS | P | 05/09/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Clouded revisions only: Adjusted sheet P1.1, P1.2, P4.1 and P5.1. | SHANEN | SHANEN | | XPS | P | 7738949 |
MICK HEATING & SHEET METAL CO. | XMS | T | 03/24/2023 | PAID (REC#1942428): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Changed hood manufacturer | DALEH | DALEH | | XMS | T | 7697186 |
MATRIX ELECTRIC, INC. | XES | P | 03/24/2023 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: As built. | DANIELG | DANIELG | | XES | P | 7697177 |
CASCO ENTERPRISES, INC. | XBS | T | 03/23/2023 | PAID (REC#1942311): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Sliding door clarification. | SHELLEY | SHELLEY | | XBS | T | 7696675 |
CLEAR WATER PLUMBING, HEATING & UTILITIES, LLC | XPS | T | 11/16/2022 | PAID (REC#1915643): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 1 revisions: Adjusted sheet P0.1. Delta 5 revisions: Adjusted sheet P4.1 and P4.2. | SHANEN | SHANEN | | XPS | T | 7585797 |