COMMERCIAL INTERIOR SPECIALISTS, LLC. | BE | P | 01/23/2024 | | JACKIEP | JACKIEP | | BE | P | 7975073 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BSP | P | 07/27/2023 | For clarification purposes the drinking fountain requires a forward approach per ICC A117.1-2009 code 602.2 only allows for a forward approach of 48" length and 30" width centered on the fountain. The clear floor space can only be met as built by using a parallel approach that is not provided for in the code. | NATHAN | NATHAN | | BSP | P | 7810431 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BFR | P | 07/20/2023 | Clear floor space at drinking fountain does not meet ANSI requirements. / Please update plans and splice for new added skylights. / Provide 3rd party observation letter for welding. / Complete other final inspections. / | ERAMIREZ | ERAMIREZ | | BFR | P | 7803524 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | B= | P | 07/14/2023 | Complete other Final inspections
Clear floor space at drinking fountain Horizontal grab bars in bathroom over 36 inches Missing door hardware Reviewed with site rep -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), PEAK HEATING & AIR CONDITIONING, INC. Mechanical Final Inspection is not Completed yet, CASCADE PLUMBING & HEATING Plumbing Final Inspection is not Completed yet. | PAULP | PAULP | | B= | P | 7798433 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BFR | P | 02/07/2023 | Complete other rough inspections. / Walls and hard lid for storage closet okay. | ERAMIREZ | ERAMIREZ | | BFR | P | 7655322 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BFR | P | 02/02/2023 | Complete all required MEP's , frame of bathroom and hard lids okay. | NATHAN | NATHAN | | BFR | P | 7651734 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BSP | P | 12/14/2022 | Reviewed Fire Wall requirements and occupancy classifications / Training with Nathan and Eric R. | ANGELW | ANGELW | | BSP | P | 7611519 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BFR | P | 12/14/2022 | Partial frame only (bathroom and demising wall only inspected). Missing kickers for bathroom walls. / Obtain and attach mechanical to permit. / Complete other rough inspections. / Reviewed to provide backing for grab bars and toilet flange exceeds center line. / Reviewed Accessible Elements / Training with NathanR. | ERAMIREZ | ERAMIREZ | | BFR | P | 7611484 |
719 ELECTRIC INC | E= | C | 06/16/2023 | | BRIAN | BRIAN | | E= | C | 7774496 |
719 ELECTRIC INC | ER | C | 06/16/2023 | ceilings--ok / | BRIAN | BRIAN | | ER | C | 7774485 |
719 ELECTRIC INC | ER | P | 02/07/2023 | all walls, | JOHNN | JOHNN | | ER | P | 7655109 |
719 ELECTRIC INC | ER | P | 12/20/2022 | center wall, see plans, | JOHNN | JOHNN | | ER | P | 7616383 |
719 ELECTRIC INC | ER | P | 12/14/2022 | bathroom walls --ok / | BRIAN | BRIAN | | ER | P | 7611569 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 08/30/2023 | TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | C | 7842004 |
CASCADE PLUMBING & HEATING | H= | C | 06/08/2023 | SPLICE ON FILE. FINAL GAS CONNECTION COMPLETE | MARKB | MARKB | | H= | C | 7766540 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 06/06/2023 | FINAL PENDING - Provide test and balance report. CONTROLS AND ROOF OK. | MARKB | MARKB | | H= | P | 7764005 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 06/06/2023 | ABOVE CEILING DUCT - DUCT MATCHES APPROVED SPLICE. FLEX, DIFFUSERS AND GRILLS COMPLETE. | MARKB | MARKB | | HD | P | 7764004 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 05/31/2023 | ABOVE CEILING DUCT - Duct not installed per plan. No splices found. RTU lacks secondary condensate switch. CONTINUE AT OWN RISK. | MARKB | MARKB | | HD | P | 7758746 |
CASCADE PLUMBING & HEATING | H= | P | 04/20/2023 | MECHANICAL SPLICE HAS NOT BEEN ATTACHED TO PERMIT YET. | BILLS | BILLS | | H= | P | 7721813 |
CASCADE PLUMBING & HEATING | H= | P | 04/10/2023 | NEED REVISED/APPROVED GAS PLANS ATTACHED TO PERMIT SHOWING THE ACTUAL INSTALL, SEE INSPECTION NOTES DATED 3-22-2023. | BILLS | BILLS | | H= | P | 7711291 |
CASCADE PLUMBING & HEATING | HI | C | 03/22/2023 | BY FINAL: NEED REVISED GAS PLAN ATTACHED TO PERMIT SHOWING ACTUAL INSTALL. 10 LB TEST OK. | BILLS | BILLS | | HI | C | 7695097 |
CASCADE PLUMBING & HEATING | P= | C | 08/15/2023 | See Images For Alternate Method & Material | TRAVISR | TRAVISR | | P= | C | 7826220 |
CASCADE PLUMBING & HEATING | P= | P | 06/21/2023 | See Tim C. for details per Joel Need Clear Floor Space ANSI - 602.2 @ Drinking Fountain / Rest OK | TRAVISR | TRAVISR | | P= | P | 7778374 |
CASCADE PLUMBING & HEATING | P= | R | 06/20/2023 | Call Ahead Rejected @ 11:25 / Door Locked @ 12:40 | TRAVISR | TRAVISR | | P= | R | 7776696 |
CASCADE PLUMBING & HEATING | P= | P | 06/05/2023 | Need To Dap All Fixtures / Need To Strap Hot Water Line To Lav @ Bathroom Pop Ceiling / All Hot Water Still Needs Insulated Per Plans / Need Clear Floor Space ANSI - 602.2 @ Drinking Fountain / Rest OK | TRAVISR | TRAVISR | | P= | P | 7762776 |
CASCADE PLUMBING & HEATING | PTO | P | 11/10/2022 | Need Letter From Engineer For Tie In @ DCW Being Vega Press Instead Of Solder Joint As Plans Call For / Rest OK
Note: Went Over Accessible With Contractor | TRAVISR | TRAVISR | | PTO | P | 7578855 |
CASCADE PLUMBING & HEATING | PB | C | 10/12/2022 | | LEE | LEE | | PB | C | 7548580 |
719 ELECTRIC INC | XES | P | 06/05/2023 | PLAN SPLICE: (No Fee) by: DANIELG for Electrical: As builts. | DANIELG | DANIELG | | XES | P | 7762253 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | P | 06/05/2023 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: rEVISED SCHEDULE AND WATER HEATER | TCRIPPEN | TCRIPPEN | | XMS | P | 7762243 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 06/05/2023 | PAID (REC#1959221) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Revised ducts and Gas Pipe | TCRIPPEN | TCRIPPEN | | XMS | T | 7762239 |