HENSEL PHELPS CONSTRUCTION CO | B= | C | 12/01/2023 | building final OK | LONNYS | LONNYS | | B= | C | 7933820 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 10/23/2023 | site visit to review side grab bar at water closet with site reps | LONNYS | LONNYS | | BSP | P | 7896808 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 09/28/2023 | 5094- horizontal assembly 2nd and 3rd layer gyp attachment OK | LONNYS | LONNYS | | BSP | P | 7871876 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 09/27/2023 | 5094 horizontal assembly gyp attachment -- 1st layer OK per UL I501 pending other required inspections | LONNYS | LONNYS | | BSP | P | 7870251 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 09/07/2023 | above ceiling penetrations and labeling OK | LONNYS | LONNYS | | BSP | P | 7850090 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 08/21/2023 | med gas valve box penetration protection OK 5094 - hard lid rated horizontal assembly framing OK | LONNYS | LONNYS | | BSP | P | 7832793 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 08/04/2023 | 5074/5068 bathroom E2s wall for continuity of smoke barrier okay, per detail 6 page A504 of latest splice. | NATHAN | NATHAN | | BSP | P | 7818042 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 08/02/2023 | 5051 corridor door smoke barrier wall framing OK 5080 - fire barrier and smoke barrier gyp attachment OK for bottom 8' only 5082 - fire barrier gyo attachment adjacent wall to 5080 5070 - corridor side smoke barrier gyp attachment OK bottom 8' only | LONNYS | LONNYS | | BSP | P | 7815753 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 07/27/2023 | base and 2nd layer gyp attachment at 50-60 corridor shaft OK per UL V455 | LONNYS | LONNYS | | BSP | P | 7810627 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 07/24/2023 | MECH SHAFT FRAME AND CORE BOARD AT CORRIDOR 50-60 // frame and core board OK per UL V455 | LONNYS | LONNYS | | BSP | P | 7806704 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 07/18/2023 | East triangle fire wall framing and 5074/5068 fire wall framing. Install backing per ANSI requirements for restroom. | NATHAN | NATHAN | | BSP | P | 7801306 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 07/06/2023 | MECH SHAFT -- final side of framing and gyp attachment OK 5094 - site visit to review penetration protection of fire barrier on interior of room - fire barrier continuity incomplete above duct penetrations - reviewed continuity requirements with site rep and need for splice if design of fire barrier is to be changed | LONNYS | LONNYS | | BSP | P | 7791201 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 06/29/2023 | MECHANICAL SHAFT GYP ATTACHMENT // horizontal assembly portion -- interior 2 layers and 1st layer on bottom OK / vertical portion - 1st outer layer of 5/8" OK
5094 GYP ATTACHMENT -- still need to inspect all penetrations and horizontal assembly when ready - gyp attachment OK on both sides per UL U465
interior light gauge steel wall framing for rooms 5054,5055,5057,5058,5059 and 5059A OK - reviewed accessible elements with site rep | LONNYS | LONNYS | | BSP | P | 7786992 |
HENSEL PHELPS CONSTRUCTION CO | BSP | R | 06/23/2023 | MECHANICAL SHAFT FRAMING // vertical portion of shaft framing and core board OK per UL V455 on 3 sides / horizontal assembly for bottom of shaft termination requires USG type ULIX gyp per UL I506 - observed american type X | LONNYS | LONNYS | | BSP | R | 7781064 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 06/20/2023 | fire barrier, smoke partition and smoke barrier gyp attachment below ceiling in rooms 5053,5053,5069,5071,and 5072 OK - still need to inspect all penetrations
smoke barrier gyp attachment over duct above 5080a OK
reviewed smoke barrier continuity requirements with site reps at exterior wall in 5074a and shaft construction and termination | LONNYS | LONNYS | | BSP | P | 7777227 |
HENSEL PHELPS CONSTRUCTION CO | BSP | R | 06/19/2023 | Gyp attachment inspection only
Call ahead confirmed at 8:50 am, called contractor multiple times via work phone no answer. No inspection performed due to no access to controlled area. | ERAMIREZ | ERAMIREZ | | BSP | R | 7775248 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 06/09/2023 | 5071 shaft wall core board and framing OK | LONNYS | LONNYS | | BSP | P | 7768486 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 06/02/2023 | Level 5 shaft walls
Unit 5071 shaft liner incomplete at top. Rest of shaft walls okay. | ERAMIREZ | ERAMIREZ | | BSP | P | 7761105 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 05/23/2023 | CENTER AND WEST POD LIGHT GAUGE STEAL WALL FRAMING // penetration protection incomplete though floor/ceiling all units / penetration protection at smoke barrier and fire barriers incomplete throughout / provide joint detail at smoke barrier termination room 5068 / rest of light gauge framing OK pending other required inspections / reviewed accessible elements with site rep
EAST POD SMOKE PARTITION TOP OUT / top out OK | LONNYS | LONNYS | | BFR | P | 7752588 |
HENSEL PHELPS CONSTRUCTION CO | BFR | P | 04/19/2023 | With completed required inspections 5078 - 5075 rough frame okay , control joints in rated walls and penetrations through rated walls will need approved and documented protection details, okay for top out of second side of all rated walls, 2nd side top out of rooms 5071 and 5056 okay. | NATHAN | NATHAN | | BFR | P | 7721160 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 04/04/2023 | Partial frame rooms 5094 - 5087, 5098 okay with completed required inspections, and completed fire stop inspection at penetrations. | NATHAN | NATHAN | | BSP | P | 7706647 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 03/29/2023 | 5th Floor - Framing and drywall at top of wall OK in Patient Toilet 5053 except for short Fire Barrier wall along Corridor C50-55 / Provide stamped RFI for how you are going to address framing and drywall continuity between the twin t's to deck / This includes the top of wall on Soiled Utility side / Framing and top out drywall OK for the header between Patient toilet 5053 and Electric 5052 / Framing and drywall OK for Fire Barrier walls at Soiled Utility 5072 and Equipment Storage 5080 / Complete head of wall and penetration protection | ADAML | ADAML | | BSP | P | 7701614 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 03/20/2023 | 5072, 5080 one side top out only okay | NATHAN | NATHAN | | BSP | P | 7691941 |
HENSEL PHELPS CONSTRUCTION CO | BSP | P | 03/08/2023 | 5th floor partial top out of exterior room side between 5080 and 5082, 5080 and corridor 50-57 / C50-54 and 5071, 5072 okay. | NATHAN | NATHAN | | BSP | P | 7681717 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 11/02/2023 | | BRIAN | BRIAN | | E= | C | 7907389 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | EP | C | 11/02/2023 | | BRIAN | BRIAN | | EP | C | 7907385 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | P | 10/31/2023 | units --ok / just need panels / | BRIAN | BRIAN | | E= | P | 7904983 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 10/12/2023 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | E= | C | 7886228 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | C | 10/12/2023 | FIRE ALARM INSPECTION: | BRIAN | BRIAN | | ER | C | 7886227 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/12/2023 | rest of ceilings inside area / just need the hallways on outside of work area / rest of nurses stations / | BRIAN | BRIAN | | ER | P | 7886217 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/28/2023 | FIRE ALARM INSPECTION: above ceilings in rooms --see plans / | BRIAN | BRIAN | | ER | P | 7870992 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/28/2023 | rooms see plans --ceilings / | BRIAN | BRIAN | | ER | P | 7870990 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/21/2023 | FIRE ALARM INSPECTION: same as elect ceilings--ok / | BRIAN | BRIAN | | ER | P | 7863478 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 09/21/2023 | wood ceilings---ok / | BRIAN | BRIAN | | ER | P | 7863476 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/30/2023 | FIRE ALARM INSPECTION: grid ceilings / | BRIAN | BRIAN | | ER | P | 7842223 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/30/2023 | grid ceilings ---see plans / | BRIAN | BRIAN | | ER | P | 7842222 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/15/2023 | bathroom hard lids --see plans / | BRIAN | BRIAN | | ER | P | 7826774 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 08/02/2023 | bathroom hard lids ---see plans / | BRIAN | BRIAN | | ER | P | 7814888 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 07/20/2023 | 5th floor: marker on plans, walls, hard lids, | JOHNN | JOHNN | | ER | P | 7803517 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 06/06/2023 | FIRE ALARM INSPECTION: pipe and boxes --walls only marked on plans | BRIAN | BRIAN | | ER | P | 7763580 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 06/06/2023 | walls marked on plans / | BRIAN | BRIAN | | ER | P | 7763574 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 05/03/2023 | walls see plans / | BRIAN | BRIAN | | ER | P | 7734622 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 04/20/2023 | partial walls --see plans / | BRIAN | BRIAN | | ER | P | 7721937 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 04/14/2023 | head walls --ok units--5062--5068--5064--5074--5079--5066--5086--5088--5075--5077--5087--5090--5092--5076--5067--5089--5078--5063--5091--5065--- | BRIAN | BRIAN | | ER | P | 7716319 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 02/23/2023 | head wall prefab for rooms 6091 and 6065--ok / upload pics of rest / | BRIAN | BRIAN | | ER | P | 7669017 |
MECHONE, INC. | H= | C | 11/30/2023 | ENGINEER APPROVED TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | C | 7931334 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 10/16/2023 | INSULATION AND LABELS COMPLETE IN EAST, CENTER AND WEST PODS. | MARKB | MARKB | | H= | C | 7888809 |
MECHONE, INC. | HD | P | 10/10/2023 | FINAL PENDING - Provide test and balance report. CEILING RADIATION DAMPERS INSTALLED PER APPROVED ENGINEER DETAIL. FLEX, DIFFUSERS AND GRILL COMPLETE IN EAST, CENTER AND WEST PODS. | MARKB | MARKB | | HD | P | 7883188 |
MECHONE, INC. | HD | P | 09/26/2023 | ROOM 5094 - CEILING RADIATION DAMPER SUPPORTED PER CONSTRUCTION SPLICE DATED 9/21/23 PAGE A507. Still need mechanical splice showing damper make/model number and statement damper is supported to meet manufacturers instruction. CONTINUE AT OWN RISK. | MARKB | MARKB | | HD | P | 7867983 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 08/24/2023 | WEST POD: SUPPLY/RETURN HYDRONIC BRANCHES AND FINAL CONNECTIONS TO VAV'S OK TO INSULATE. | MARKB | MARKB | | HWP | P | 7836620 |
MECHONE, INC. | HD | P | 08/22/2023 | 4 FIRE/SMOKE EXHAUST DAMPERS SUPPORTED PER ENGINEER DETAIL OK FOR BREAKAWAY JOINTS, ANGLES AND ACCESS DOORS. | MARKB | MARKB | | HD | P | 7833817 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 08/16/2023 | SUPPLY/RETURN BRANCH PIPING TO VAV'S AND ROOM HEATERS FOR CENTER POD, ROOM 5071 & 5072 UNDER OPERATING PRESSURE OK TO WRAP. | MARKB | MARKB | | HWP | P | 7828402 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 08/10/2023 | SUPPLY/RETURN MAINS IN EAST, CENTER & WEST PODS - INSULATE AT OWN RISK, NO PRESSURE TEST AT THIS TIME. SUPPLY/RETURN BRANCHES IN EAST POD - INSULATE AT OWN RISK, NO PRESSURE TEST AT THIS TIME. | MARKB | MARKB | | HWP | P | 7822966 |
MECHONE, INC. | HSP | P | 07/20/2023 | ENGINEER STAMPED FIRE DAMPER SUPPORT DETAIL RECEIVED - SEE IMAGES | MARKB | MARKB | | HSP | P | 7803331 |
MECHONE, INC. | HD | P | 07/13/2023 | NOTE ADDED 7/14/23 - CALLED CRAIG AT MECH ONE -----ENGINEER TO ADDRESS: How are 4 fire/smoke dampers for exhaust (per note 23 on M205 splice date 5/2/23) supported to meet manufacturers instructions where installed in shaft wall with no support from floor. Shaft wall supported from ceiling.---- ANNULAR SPACE FOR THESE DAMPER ARE OK. | MARKB | MARKB | | HD | P | 7797407 |
MECHONE, INC. | HD | P | 06/22/2023 | THIS INSPECTION FOR BDA PAGE #286,, PLAN PAGE M205--- (ROOM EVS-5095. HIGHLIGHTED WITH RED PLAN SPLICE CLOUD)-- 2 SUPPLY AIR AND 2 RETURN AIR SHAFT DAMPER OPENINGS OK. | BILLS | BILLS | | HD | P | 7779395 |
MECHONE, INC. | HD | P | 06/13/2023 | WEST POD: ABOVE CEILING DUCT - MEDIUM PRESSURE TO VAV'S, LOW PRESSURE SUPPLY/RETURN AND EXHAUST INSTALLED PER PLAN OK TO WRAP. No flex or diffusers this inspection. | MARKB | MARKB | | HD | P | 7770513 |
MECHONE, INC. | HD | P | 05/16/2023 | EAST POD: ABOVE CEILING DUCT - MEDIUM PRESSURE TO VAV'S, LOW PRESSURE SUPPLY/RETURN AND EXHAUST INSTALLED PER PLAN OK TO WRAP. No flex or diffusers this inspection. | MARKB | MARKB | | HD | P | 7745917 |
MECHONE, INC. | HD | P | 03/31/2023 | ABOVE CEILING DUCT - MEDIUM PRESSURE SUPPLY MAINS 64X18, 30X16, 24X16 & 28X16 OK TO WRAP. | MARKB | MARKB | | HD | P | 7704149 |
MECHONE, INC. | HD | P | 03/17/2023 | ABOVE CEILING DUCT - RETURN MAIN 66X24, 66X22 & 54X18 OK TO WRAP. | MARKB | MARKB | | HD | P | 7690513 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 10/26/2023 | | CODYP | CODYP | | P= | C | 7900288 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 08/02/2023 | NOTE/ Over head dwv and water lines o.k. in 5051, 5095, 5079, and 5080 | CODYP | CODYP | | PTO | P | 7815236 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/27/2023 | NOTE/ In wall o.k. for 5095/ Over head water lines o.k. for 5054 and 5053 | CODYP | CODYP | | PTO | P | 7810064 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/21/2023 | NOTE/ In wall dwv and water lines o.k. for 5051/ Over head water lines o.k. for 5072 | CODYP | CODYP | | PTO | P | 7805034 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/14/2023 | NOTE/ All water mains o.k./ Over head water lines o.k. for 5069, 5059, 5062, and 5063 | CODYP | CODYP | | PTO | P | 7798424 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 07/06/2023 | NOTE/ Over head water lines o.k. for 5065, 5064, and 5063/ All over head vent o.k. | CODYP | CODYP | | PTO | P | 7790930 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/29/2023 | NOTE/ Over head water lines o.k. for 5067/ Over head vent o.k. for 5065, 5064, and 5060 | CODYP | CODYP | | PTO | P | 7786275 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/27/2023 | NOTE/ Over head vent o.k. for 5072, 5069, 5067, and 5066/ Over head water lines o.k. for 5074, 5068, 5067, Nutrition station, and 5066 just the dialysis box | CODYP | CODYP | | PTO | P | 7783626 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/23/2023 | Still need engineer's approval as previously stated, NOTE/ In wall for dialysis box in unit 5092 o.k./ over head venting o.k. in East pod, Center pod, and room 5082 | CODYP | CODYP | | PTO | P | 7780768 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/21/2023 | NOTE/ Over head water lines o.k. for 5076 and 5075 | CODYP | CODYP | | PTO | P | 7777835 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/15/2023 | NOTE/ Overhead venting o.k. for units 5074 and 5068 just the bathrooms | CODYP | CODYP | | PTO | P | 7773173 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/14/2023 | Still need plan engineer's approval as previously stated, NOTE/ Over head water lines o.k. from 5092 through to 5077/ Over head mains o.k. from 5076 to 5067 | CODYP | CODYP | | PTO | P | 7771313 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/13/2023 | Still need plan revision or engineer's letter for dialysis piping as per previous inspections, NOTE/ Over head venting o.k. for 5079, 5078, 5077, 5076, 5075, and 5074 just the sink | CODYP | CODYP | | PTO | P | 7770036 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/07/2023 | NOTE/ Venting o.k. for 5088, 5087, 5086, and 5079 just the bathroom group | CODYP | CODYP | | PTO | P | 7765048 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 06/05/2023 | Still need engineer to address dialysis drains, NOTE/ All dwv and water in wall o.k./ Under floor tie ins o.k. | CODYP | CODYP | | PTO | P | 7762422 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/24/2023 | Under floor o.k. for West pod, Need to see tie ins | CODYP | CODYP | | PTO | P | 7753231 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/17/2023 | NOTE/ In wall dwv and water o.k. for rooms 5076, 5075, 5074, and 5068 just the bathroom | CODYP | CODYP | | PTO | P | 7746582 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/10/2023 | NOTE/ In wall dwv and water lines o.k. for rooms 5072, 5079, 5078, 5077 and 5076 just the sink and box/ Over head vent o.k. for 5089 | CODYP | CODYP | | PTO | P | 7740651 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/05/2023 | NOTE/ In wall dwv and water lines o.k. for rooms 5082, 5054, 5053 | CODYP | CODYP | | PTO | P | 7737008 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 05/03/2023 | NOTE/ In wall dwv and water lines o.k. for 5086 and 5079 just the bathroom/ In wall dwv and water o.k. for clinical sink in 5072/ Over head vent o.k. for 5092, 5091, and 5090 just the sink | CODYP | CODYP | | PTO | P | 7734283 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/28/2023 | In wall dwv, water lines, and accessibility measurements o.k. for units 5092, 5091, 5090, 5089, 5088, 5087 and 5086 just the sink | CODYP | CODYP | | PTO | P | 7730459 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/25/2023 | Splice received for 3" to mop sink and toilet, Under floor o.k. for 5078, 5077, 5076, 5075 and just the sink in 5074 | CODYP | CODYP | | PTO | P | 7726466 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 04/17/2023 | Need engineer's approval for CPVC and cast iron on acid waste piping, NOTE/ Under floor dwv o.k. for rooms 5074 and 5072 | CODYP | CODYP | | PTO | P | 7717973 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/30/2023 | Inspected under floor DWV the following rooms, need tie ins completed, need engineers approval for CPVC and cast on acid waste piping - drawings show polypropylene: 5082, 5087, 5088, 5089, 5090, 5091, and 5092. Note: Pictures okay for tie ins. | DANR | DANR | | PTO | P | 7702547 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/23/2023 | NOTE/ Under floor dwv o.k. for units 5086 and 5079/ Need to see tie in | CODYP | CODYP | | PTO | P | 7696122 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/06/2023 | NOTE/ re routed water and dwv mains from 6th floor to 4th floor o.k. | CODYP | CODYP | | PTO | P | 7677439 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 03/01/2023 | Phase 2
Under floor o.k. for dwv only for phase 2 | CODYP | CODYP | | PTO | P | 7673778 |
OLSON PLUMBING & HEATING COMPANY | PTO | P | 02/01/2023 | Phase 1
Need plan revision showing 3" to mop sink and toilet plans call for 4", NOTE/ Rest o.k. for under floor for phase 1 | CODYP | CODYP | | PTO | P | 7650359 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 10/17/2023 | PAID (REC#2000043): PLAN SPLICE FEE: $50 by: DANM for Construction: Minor architectural revisions including a ceiling height and film added to door | DANM | DANM | | XBS | T | 7890799 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 10/02/2023 | PAID (REC#1993924): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Add sheet A602 for clarification of accessibility width at roll in showers. | JUSTINL | JUSTINL | | XBS | T | 7873365 |
OLSON PLUMBING & HEATING COMPANY | XMS | T | 09/27/2023 | PAID (REC#1993314): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Added damper location and support detail | JUSTINC | JUSTINC | | XMS | T | 7869382 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 09/21/2023 | PAID (REC#1990624): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Ceiling damper framing. | JUSTINL | JUSTINL | | XBS | T | 7863418 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | T | 09/15/2023 | PAID (REC#1990346): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: As built | SHELBY | SHELBY | | XES | T | 7857969 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 09/13/2023 | PAID (REC#1988666): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Minor revisions to reflective ceiling plan and interior finishes. | JUSTINL | JUSTINL | | XBS | T | 7854712 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | P | 08/28/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power, lighting and schedules. | BERTHA | BERTHA | | XES | P | 7840160 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 08/23/2023 | PAID (REC#1981243): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Revised sheet P205. | SHANEN | SHANEN | | XPS | T | 7834630 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 08/21/2023 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Added dampers | JUSTINC | JUSTINC | | XMS | P | 7832434 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 08/21/2023 | PAID (REC#1980445): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Revise reflective ceiling, adjust sill heights, add damper support detail. | JUSTINL | JUSTINL | | XBS | T | 7832151 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | P | 08/18/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised power and lighting. Revised schedules. | BERTHA | BERTHA | | XES | P | 7831303 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 07/25/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Revised sheet P001. | SHANEN | SHANEN | | XPS | P | 7807282 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 07/25/2023 | PAID (REC#1973006): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Ceiling details, card reader/PP locations, flooring and finish clarifications. | JUSTINL | JUSTINL | | XBS | T | 7807257 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 07/12/2023 | PAID (REC#1969133): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Revised smoke barrier termination detail C6 of A504 | JUSTINL | JUSTINL | | XBS | T | 7796281 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | P | 06/22/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Added dampers. | BERTHA | BERTHA | | XES | P | 7779793 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 06/19/2023 | PAID (REC#1962802): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Added wall types, minor floor plan revision | JUSTINL | JUSTINL | | XBS | T | 7775521 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | T | 06/01/2023 | PAID (REC#1959331): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: New fire/smoke damper. | BERTHA | BERTHA | | XES | T | 7760113 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 05/04/2023 | PAID (REC#1952085): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Add listed assembly / Revised dimensions and minor interior finishes. | JUSTINL | JUSTINL | | XBS | T | 7735149 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | P | 05/02/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Minor power and lighting revisions. | BERTHA | BERTHA | | XES | P | 7733235 |
MECHONE, INC. | XMS | T | 05/02/2023 | PAID (REC#1951845): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Layout revisions and note for FSD | JUSTINC | JUSTINC | | XMS | T | 7733206 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 04/06/2023 | PAID (REC#1945028): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Minor changes to interior finishes | JUSTINL | JUSTINL | | XBS | T | 7708662 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | P | 04/04/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised lighting - revised locations. | BERTHA | BERTHA | | XES | P | 7706271 |
OLSON PLUMBING & HEATING COMPANY | XPS | T | 04/03/2023 | PAID (REC#1947285): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 4 revisions: Adjusted sheet P204. | SHANEN | SHANEN | | XPS | T | 7705414 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | XES | P | 03/20/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised circuits for plug mold. | BERTHA | BERTHA | | XES | P | 7692354 |
OLSON PLUMBING & HEATING COMPANY | XMS | P | 03/15/2023 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Layout revised | JUSTINC | JUSTINC | | XMS | P | 7687727 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 03/14/2023 | PAID (REC#1940373): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Update to wall types and rated assemblies / Update to ceiling heights and ceiling plans | JUSTINL | JUSTINL | | XBS | T | 7686350 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 02/16/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 3 revisions: Adjusted sheet P204, P205, P206, P401 and P501. | SHANEN | SHANEN | | XPS | P | 7663328 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 02/16/2023 | PAID (REC#1934136): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Update bathroom configuration at room 5091A and 6091A | JUSTINL | JUSTINL | | XBS | T | 7663311 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 02/09/2023 | PAID (REC#1933153): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Revised ceiling heights | JUSTINL | JUSTINL | | XBS | T | 7657606 |
HENSEL PHELPS CONSTRUCTION CO | XES | P | 02/06/2023 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Minor power and lighting changes. | BERTHA | BERTHA | | XES | P | 7654367 |
OLSON PLUMBING & HEATING COMPANY | XPS | P | 01/27/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Delta 2 revisions: Adjusted sheet P204, P205, P206, P401, P501 and P601. | SHANEN | SHANEN | | XPS | P | 7647090 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 01/27/2023 | PAID (REC#1930282): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Minor changes to interior finish and equipment | JUSTINL | JUSTINL | | XBS | T | 7647046 |
HENSEL PHELPS CONSTRUCTION CO | XBS | T | 01/25/2023 | PAID (REC#1929042): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Minor changes to interior finishes | JUSTINL | JUSTINL | | XBS | T | 7643739 |