MARK YOUNG CONSTRUCTION, LLC | B= | C | 02/22/2023 | | ERAMIREZ | ERAMIREZ | | B= | C | 7666976 |
MARK YOUNG CONSTRUCTION, LLC | B= | R | 02/13/2023 | Called contractor no answer, no one on site. Additional Inspections Required (computer generated): INTEGRATED CONTROLS & ELECTRIC Electrical Final Inspection is not Completed yet, H20 PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | ERAMIREZ | ERAMIREZ | | B= | R | 7660117 |
MARK YOUNG CONSTRUCTION, LLC | BFR | P | 01/24/2023 | Attach mechanical to permit. / Observed light gauge framing for area A. | ERAMIREZ | ERAMIREZ | | BFR | P | 7643097 |
INTEGRATED CONTROLS & ELECTRIC | E= | C | 02/13/2023 | | BRIAN | BRIAN | | E= | C | 7660662 |
INTEGRATED CONTROLS & ELECTRIC | ER | C | 02/10/2023 | ceiling,ok/ panel PFA,ok/ label fed from PF/ coolers will need disco's. | JOHNN | JOHNN | | ER | C | 7658790 |
INTEGRATED CONTROLS & ELECTRIC | ER | P | 01/24/2023 | some walls, see plans, | JOHNN | JOHNN | | ER | P | 7642918 |
REEVES SPECIALTY SERVICES, INC. | H= | C | 02/21/2023 | TEST AND BALANCE REPORT RECEIVED - SEE IMAGES | MARKB | MARKB | | H= | C | 7665148 |
REEVES SPECIALTY SERVICES, INC. | H= | P | 02/14/2023 | MECHANICAL FINAL PENDING TEST AND BALANCE REPORT. | BILLS | BILLS | | H= | P | 7661500 |
H2O PLUMBING & HEATING, INC. | P= | C | 02/17/2023 | | TRAVISR | TRAVISR | | P= | C | 7663899 |
H2O PLUMBING & HEATING, INC. | PTO | C | 02/17/2023 | SPLICE ADDED | TRAVISR | TRAVISR | | PTO | C | 7663898 |
H2O PLUMBING & HEATING, INC. | PB | C | 02/17/2023 | SPLICE UPLOADED | TRAVISR | TRAVISR | | PB | C | 7663896 |
H2O PLUMBING & HEATING, INC. | PTO | P | 01/24/2023 | In Wall DWV & H20 @ Floral Area OK /
Need Engineer Letter For AAV @ 2 Hub Drains & Floral Sink / To Complete Inspection Please Submit Photo With Inspection Request /
Photo upload requested. If unfamiliar with uploading photos for an inspection, please click the following link: https://youtu.be/QS0hdGSBA6o / | TRAVISR | TRAVISR | | PTO | P | 7643241 |
H2O PLUMBING & HEATING, INC. | PB | P | 01/17/2023 | NOTES UPDATED - 2/8/23 Tie In Point On Plans Does Not Match What Was In Field / Need Plans To Reflect Size Of Tie Ins ( Plans Called For DWV ToTie In To 4" - Tie In Was Made On 2" ) / What Was Piped Meets Code
Undersized Underground DWV Tie Ins And Design @ Both Floral Sink & Hub Drains / Cover @ Own Risk / Currently 2" DWV Tie In's & 2" DWV To Floral Sink & 2" DWV To 2 Floral Cabinets With AAV In wall
Note: Need Plans Revised To Reflect Changes Made | TRAVISR | TRAVISR | | PB | P | 7635982 |
MARK YOUNG CONSTRUCTION, LLC | XBS | T | 02/15/2023 | PAID (REC#1933920): PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Update to index on G0.1 | JUSTINL | JUSTINL | | XBS | T | 7662797 |
H2O PLUMBING & HEATING, INC. | XPS | T | 02/15/2023 | PAID (REC#1933640): PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Delta 4 revisions: Adjusted sheet P0.1 and P1.1. | SHANEN | SHANEN | | XPS | T | 7662768 |