HOMEOWNER | B= | C | 12/12/2023 | Final approved certificates and test report for materials used in fire protection of floor per IRC 302.13 EX #4 on file / | TRENTP | TRENTP | | B= | C | 7941979 |
HOMEOWNER | B= | P | 12/11/2023 | Still need to provide fire protection of floors certificate and evaluation report / Rest okay -- Schedule a new Building Final when above items are complete. | TRENTP | TRENTP | | B= | P | 7941504 |
HOMEOWNER | B= | P | 12/08/2023 | Need to provide code compliant address numbers on house / Need to provide weather resistive exterior finish to north and rear elevations of garage / Provide product test report and installers certificate for material used in fire protection of floors per IRC 302.13 EX #4 // Finished basement, rear deck w/out stairs, AC -- Schedule a new Building Final when above items are complete. | TRENTP | TRENTP | | B= | P | 7939684 |
HOMEOWNER | BSP | P | 12/06/2023 | Evaluation report for spray foam insulation on file | TRENTP | TRENTP | | BSP | P | 7936688 |
HOMEOWNER | BSP | R | 12/06/2023 | Need to provide evaluation report for spray foam insulation used per provided installers certificate // Installers certificate for spray foam and blown in insulation on file / Air Leakage Testing report (Blower Door) Per 2015 IECC Section R402.4.1 on file / Update by TP on 12/6/23 changed to reject after image upload | TRENTP | TRENTP | | BSP | R | 7936616 |
HOMEOWNER | BIN | C | 08/02/2023 | Need to provide air leakage test result by final / R21 observed in garage walls | TRENTP | TRENTP | | BIN | C | 7814942 |
HOMEOWNER | BFR | C | 07/20/2023 | Items corrected / Front porch and rear deck okay | TRENTP | TRENTP | | BFR | C | 7803754 |
HOMEOWNER | BFR | P | 07/20/2023 | Engineer letter on file for balloon wall and sill plate shims / Pending inspection of other corrections | TRENTP | TRENTP | | BFR | P | 7802976 |
HOMEOWNER | BFR | R | 07/13/2023 | 1. Need to complete fireblocking throughout whole house / 2. Missing anchor bolt within 12 inches of plate break under eastern garage window / 3. Incomplete fastening of sheathing around headerless garage window / 4. Need to tie interrupted double top plates at multiple corners throughout house, will need full review / 5. Need to provide licensed design professional clarification for use of shims under sill plate at southeast corner of garage / 6. Balloon wall at southern kitchen exterior wall exceeds 10 ft max wall height / 7. Need to secure tops of 2x4 posts to steel beams in basement / Finished basement, rear deck / NOTE: Front porch and rear deck frame have not been inspected at this time | TRENTP | TRENTP | | BFR | R | 7796881 |
HOMEOWNER | BLA | C | 06/21/2023 | | DOUGC | DOUGC | | BLA | C | 7778478 |
HOMEOWNER | BFD | C | 06/21/2023 | | DOUGC | DOUGC | | BFD | C | 7778403 |
HOMEOWNER | BFN | C | 06/21/2023 | Complete per BSP inspection dated 12-27-22 | DOUGC | DOUGC | | BFN | C | 7778389 |
HOMEOWNER | BFI | C | 04/17/2023 | R10 installed at master bathroom on main level and throughout basement | TRENTP | TRENTP | | BFI | C | 7717894 |
HOMEOWNER | BFD | P | 01/10/2023 | complete BFN / engineer letter for updated open hole on file - no under slab drain required | LONNYS | LONNYS | | BFD | P | 7629966 |
HOMEOWNER | BFD | P | 12/28/2022 | Engineer letter for perimeter drain on file -- Damp proofing noted / Pending verification of connection to underdrain via photo or reinspection / | GREGT | GREGT | | BFD | P | 7620665 |
HOMEOWNER | BFI | P | 12/27/2022 | r-10 over entire garage floor okay, still need to complete walk out | BOBF | BOBF | | BFI | P | 7620098 |
HOMEOWNER | BSP | P | 12/27/2022 | front and rear deck piers okay | BOBF | BOBF | | BSP | P | 7620095 |
HOMEOWNER | BFN | P | 12/13/2022 | Footing/foundation observation letters state exterior piers have not been observated, need to provide design professional observation or request inspection / Engineer letter for foundation on file -- Eufer noted / Foundation design on file (Bearing Capacity Verified) / | TRENTP | TRENTP | | BFN | P | 7608955 |
HOMEOWNER | BFT | C | 12/13/2022 | Engineer letter for footing on file / | TRENTP | TRENTP | | BFT | C | 7608948 |
HOMEOWNER | BFT | P | 12/01/2022 | Need to provide footing observation letter / Soils report/open hole on file, 2500 psf - entire - 10% / Foundation design on file, bearing capacity verifed | TRENTP | TRENTP | | BFT | P | 7596915 |
HOMEOWNER | BFT | P | 11/10/2022 | AUTHORIZED INSPECTION BY ENGINEER | BRITNEY | BRITNEY | BRITNEYP | BFT | P | 7578760 |
HOMEOWNER | BFN | P | 11/10/2022 | AUTHORIZED INSPECTION BY ENGINEER | BRITNEY | BRITNEY | BRITNEYP | BFN | P | 7578759 |
HOMEOWNER | E= | C | 11/28/2023 | E= OK ------ 20 AMP A/C ------ | GREGM | GREGM | | E= | C | 7928593 |
HOMEOWNER | EP | C | 11/20/2023 | 200 amp sub panel good | JOSEPH | JOSEPH | | EP | C | 7923627 |
HOMEOWNER | E= | R | 11/20/2023 | Following is a partial list only / complete reinspection required / Following is a partial list only / Need to install "Emergency Disconnect/Service Disconnect" label on the exterior of the service enclosure. / 40 amp 240 volt GFCI not working. / Exterior plugs should be WR type. / ID white wires used as a hot need to be tapped black / Install all screws for service & sub panels. / Can't use NM in flex at ac / Strap flex at AC / Use correct type of breaker locks / Caulk exterior fixtures. / Notes: Garage good. / Complete reinspection on exterior & I did not inspect interior. /AC is 20 amp | JOSEPH | JOSEPH | | E= | R | 7923350 |
HOMEOWNER | ES | C | 07/10/2023 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | TOMC | TOMC | | ES | C | 7793802 |
HOMEOWNER | ER | C | 07/10/2023 | 2 - # 6 , 2 - # 10 , ufer is not irreversible , no mcc , no central vac , finished basement | TOMC | TOMC | | ER | C | 7793801 |
HOMEOWNER | EUG | C | 04/14/2023 | EUG OK ----- 4/0 ------ | GREGM | GREGM | | EUG | C | 7716868 |
HOMEOWNER | H= | C | 11/10/2023 | Whole house ventilation switches located in master bath and main level powder room / | CASEYM | CASEYM | | H= | C | 7915005 |
HOMEOWNER | H= | P | 11/09/2023 | UNABLE TO LOCATE AND VERIFY WHOLE HOUSE VENTILATION/ LABEL WHOLE HOUSE VENTILATION SWITCH AND RE-CALL FOR INSPECTION WHEN READY/ NOTE / FINISHED BASEMENT / DIRECT VENT BOILER / DIRECT VENT FURNACE / NO OUTSIDE AIR TO FURNACE RETURN / A/C COMPLETE / | JONH | JONH | | H= | P | 7913753 |
ATLANTIC HEATING & A/C INC | H= | P | 09/29/2023 | not ready for heat final/ boiler piping to be completed/ thermostats to be installed/ label whole house fan/ re-call for inspection when ready | JONH | JONH | | H= | P | 7872442 |
ATLANTIC HEATING & A/C INC | H= | P | 09/29/2023 | duct leakage received, see image | JONH | JONH | | H= | P | 7872130 |
ATLANTIC HEATING & A/C INC | H= | P | 09/29/2023 | performance test received, see images | JONH | JONH | | H= | P | 7872095 |
HOMEOWNER | HC | C | 07/12/2023 | RELEASE METER | SAMS | SAMS | | HC | C | 7795633 |
HOMEOWNER | HV | C | 07/12/2023 | Main level fireplace clearance to combustibles and vent termination ok. / | SAMS | SAMS | | HV | C | 7795632 |
PEAK VIEW PLUMBING, INC. | HI | C | 07/07/2023 | 10LB TEST OK / 1-1/4" MAIN / 1 FURNACE / 1 BOILER / 1 FIREPLACE / 1 FUTURE 1/2" GAS STUB BACK DECK AT 140 FEET IS GOOD FOR 31K) / FUTURE 1/2" GAS STUB FRONT OF HOUSE LEFT SIDE AT 100 FEET IS GOOD FOR 38K) / | LIDO | LIDO | | HI | C | 7791976 |
HOMEOWNER | HRR | C | 07/03/2023 | performance test due by final/ duct leakage report due by final/ WHOLE HOUSE VENTILATION BEING ACHIEVED THROUGH EXHAUST FAN LOCATED IN BATHROOM(x2) / VERIFY WHOLE HOUSE VENTILATION SWITCH LOCATION AT FINAL / note/ direct vent boiler/ direct vent furnace/A/C rough, coil and lineset. / | JONH | JONH | | HRR | C | 7788767 |
HOMEOWNER | HRR | P | 06/30/2023 | BOILER VENT OK/ CALL IN FOR BATH EXHAUST WHEN READY/ | JONH | JONH | | HRR | P | 7787458 |
ATLANTIC HEATING & A/C INC | HRR | P | 06/19/2023 | STILL NEED ALL BATH EXHAUST FANS INSTALLED AND INSPECTED/ BOILER VENT INSTALLED/ RE-CALL FOR INSPECTION WHEN READY | JONH | JONH | | HRR | P | 7775752 |
HOMEOWNER | HWP | C | 06/07/2023 | 80 lb test on main level zone ok/ | JONH | JONH | | HWP | C | 7765229 |
HOMEOWNER | HWP | P | 04/21/2023 | (changed to partial) 6/7/2023 jh) 80 lb test on basement and master bedroom piping ok/ R-10 installed/ ok to cover. | JONH | JONH | | HWP | P | 7724013 |
ATLANTIC HEATING & A/C INC | HRR | P | 04/19/2023 | 2ND FLOOR ONLY/PERFORMANCE TEST DUE BY FINAL/ HOW WILL CONDENSATE BE REMOVED FOR THE FURNACE AND A/C? REST OF 2ND FLOOR OK/ WILL NEED 1ST FLOOR AND BASEMENT BOILER PIPING TESTED AND EXHAUST FAN INSPECTIONS/ | JONH | JONH | | HRR | P | 7721414 |
HOMEOWNER | HWP | P | 12/27/2022 | 80lb test ok on garage system / Ok to cover / | CASEYM | CASEYM | | HWP | P | 7620409 |
HOMEOWNER | P= | C | 12/08/2023 | see images. | TAYLOR | TAYLOR | | P= | C | 7939438 |
HOMEOWNER | P= | C | 12/08/2023 | Correction complete via image | FRANKM | FRANKM | | P= | C | 7939432 |
HOMEOWNER | P= | P | 12/07/2023 | need air gap/ undersized T&P drain, rest ok. | TAYLOR | TAYLOR | | P= | P | 7938614 |
HOMEOWNER | P= | P | 12/06/2023 | Terminate boiler backflow and side arm water heater T&P drains to floor drain / Caulk up hall tub spout / Rest OK /// NOTE: PVB INSTALLED | ADRIANM | ADRIANM | | P= | P | 7937739 |
PEAK VIEW PLUMBING, INC. | P= | P | 12/06/2023 | Terminate boiler backflow and side arm water heater T&P drains to floor drain / Caulk up hall tub spout / Rest OK /// NOTE: PVB INSTALLED | ADRIANM | ADRIANM | | P= | P | 7937736 |
HOMEOWNER | P= | P | 12/06/2023 | WATER CERT UPLOADED TO IMAGES / ON SITE INSPECTION SCHEDULED 12/6/23 | ADRIANM | ADRIANM | | P= | P | 7936705 |
HOMEOWNER | PWO | C | 06/23/2023 | NOTE: H2O RAN FROM WELL TO THROUGH BASEMENT FOUNDATION / WATER CERT BY FINAL | ADRIANM | ADRIANM | | PWO | C | 7781266 |
PEAK VIEW PLUMBING, INC. | PTO | C | 06/15/2023 | | LEE | LEE | | PTO | C | 7772697 |
PEAK VIEW PLUMBING, INC. | PTO | P | 06/13/2023 | NEED HOT DOMESTIC 3/4" - 1" INSULATED -- OTHER OK -- NOTES FOR RBD -- FOUR VTR -- AAV @ UTILITY SINK -- TUB TEMPERING IN WALL -- SIDE ARM FOR DOMESTIC -- ACCESS PANEL AT WATER ENTRY FOR ISOLATION VALVE -- CHECK ALL EJECTOR PIPING AT FINAL | LEE | LEE | | PTO | P | 7770239 |
PEAK VIEW PLUMBING, INC. | PB | C | 04/11/2023 | UPPER AND LOWER BASE SECTIONS OK -- EJECTOR ON LOWER SECTION -- H20 THRU WALL AT LATER DATE | LEE | LEE | | PB | C | 7712471 |
HOMEOWNER | XBS | T | 04/07/2023 | PAID (REC#1946714) PLAN SPLICE FEE: $50 by: JUSTINL for Construction: Revise roof framing at front porch / Revise mech room at upper floor | JUSTINL | JUSTINL | | XBS | T | 7710832 |
HOMEOWNER | XMS | T | 03/21/2023 | PAID (REC#1946714) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised for forced air system for upper level | JUSTINC | JUSTINC | | XMS | T | 7693618 |