ROGERS AND SONS, INC. | H= | L | 03/06/2024 | THERE ARE TWO MECHANICAL CONTRACTOR ATTACHED TO THE PERMIT. PER CONVERSATION WITH VET-MECH LLC THEY WILL BE REMOVING THEMSELVES FROM THE PERMIT / NEED ELECTRICAL CONTRACTOR ATTACHED TO PERMIT FOR NEW ELECTRICAL INSTALLED / PLANS SHOW THREE JANDY MODEL EHE 400 NC BOILERS TO BE INSTALLED, THREE JANDY EHE350NS BOILERS WAS INSTALLED. NEED REVISED EQUIPMENT SCHEDULE OR ENGINEER APPROVED SUBMITTAL FOR BOILERS INSTALLED / ADD THREE BOILERS, THREE VENTS AND THREE GAS OUTLETS TO SCOPE OF WORK / SEE HV NOTES /. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, , . | LIDO | LIDO | | H= | L | 8016087 |
ROGERS AND SONS, INC. | HV | P | 03/06/2024 | BOILER VENT CONDENSATE DISPOSAL TUBING BOTTOM FAR NORTH BOILER IS KINKED. OK TO ATTACH PICTURE OF CORRECTION TO AN INSPECTION REQUEST / REST OF VENTS OK / | LIDO | LIDO | | HV | P | 8016081 |
VET-MECH LLC | HI | C | 03/06/2024 | FINAL GAS CONNECTIONS TO BOILERS OK / | LIDO | LIDO | | HI | C | 8016073 |
ROGERS AND SONS, INC. | HWP | C | 03/06/2024 | THREE 350K BTU BOILERS INSTALLED / HWR / HWS WATER PIPING UNDER OPERATING PRESSURE. NO VISIBLE LEAKS / INSTALLED PER PLAN / | LIDO | LIDO | | HWP | C | 8016072 |
ROGERS AND SONS, INC. | HSP | L | 02/13/2024 | THERE ARE TWO MECHANICAL CONTRACTOR ATTACHED TO THE PERMIT. PER CONVERSATION WITH VET-MECH LLC THEY WILL BE REMOVING THEMSELVES FROM THE PERMIT / | LIDO | LIDO | | HSP | L | 7994581 |
ROGERS AND SONS, INC. | H= | L | 02/13/2024 | ADD THREE BOILERS TO SCOPE OF WORK / PLANS SHOW THREE JANDY MODEL EHE 400 NC BOILERS TO BE INSTALLED, THREE JANDY EHE350NS BOILERS WAS INSTALLED. NEED REVISED EQUIPMENT SCHEDULE OR ENGINEER APPROVED SUBMITTAL FOR BOILERS INSTALLED / BOILERS ARE NOT READY FOR INSPECTION /. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, , . | LIDO | LIDO | | H= | L | 7994549 |
ROGERS AND SONS, INC. | HI | L | 02/13/2024 | ADD THREE GAS OUTLETS TO SCOPE OF WORK / 10LB TEST OK / GAS INSTALLED PER PLAN / NEED FINAL GAS CONNECTION TO BOILERS / | LIDO | LIDO | | HI | L | 7994524 |
ROGERS AND SONS, INC. | HV | L | 02/13/2024 | ADD THREE VENT TO SCOPE OF WORK / VENTS ARE NOT READY FOR INSPECTION / NEED FULL VENT INSPECTION FOR ALL THREE BOILERS / | LIDO | LIDO | | HV | L | 7995217 |
ROGERS AND SONS, INC. | HWP | L | 02/13/2024 | STILL NEED BOILER HEAT WATER SUPPLY AND RETURN PIPING INSPECTION WHEN READY / CAN INSPECT UNDER OPERATING PRESSURE / | LIDO | LIDO | | HWP | L | 7995222 |
ROGERS AND SONS, INC. | HE | L | 02/09/2024 | Renewed online for Half Fee at Feb 9 2024 1:30PM (RECEIPT #: 2032647) | WEBSITE | WEBSITE | | HE | L | 7992402 |
VET-MECH LLC | H= | P | 11/28/2023 | MET WITH MECHANICAL CONTRACTOR (VET -MECH / PATRICK) TO DISCUSS THE FOLLOWING: NEED ELECTRICAL ATTACHED TO PERMIT / THE TYPE OF BOILER PLATFORMS TO BE UTILIZED / CLEARANCES FOR SERVICE AND REPAIR / GAS PIPE INSTALL TO BE PER PLAN / CONDENSATE DISPOSAL / GAS PIPING TO BE PER PLAN / HEAT WATER SUPPLY AND RETURN PIPING TO BE PER PLAN AND MANUFACTURER REQUIREMENTS /. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, , . | LIDO | LIDO | | H= | P | 7929237 |
ROGERS AND SONS, INC. | HE | P | 07/26/2023 | | AMYP | AMYP | | HE | P | 7808340 |
ROGERS AND SONS, INC. | H16 | P | 01/31/2023 | MET WITH MECHANICAL CONTRACTOR Roger and sons) AARON, GENERAL CONTRACTOR (Savvy) LYDIA AND PROPERTY MANAGEMENT. WENT OVER CODE REQUIRED PASSAGE PER 2015 IFGC 306.2 AND THE FOLLOWING. WENT OVER HV NOTES DATED 12/27/22. BOILER VENTS MUST BE INSTALLED PER MANUFACTURER REQUIREMENTS / GAS TO BE INSTALLED PER PLAN OR REVISED AND APPROVED GAS PLAN SPLICE IS REQUIRED. SEE HI NOTES DATED 12/27/22 / INFORMED EVERYONE AT MEETING THAT HYDRONIC PIPING INSPECTION IS STILL NEEDED AND WILL INSPECT UNDER OPERATING PRESSURE | LIDO | LIDO | | H16 | P | 7649155 |
ROGERS AND SONS, INC. | H= | P | 12/28/2022 | REVIEWED 2015 IFGC CODE SECTION 306.1 WITH SENIOR. 18" SERVICE CLEARANCE WILL SUFFICE./ CODE SECTION 306.2 FOR 36" PASSAGE TO POOL HEATERS MUST BE ACHIEVED (the replacement of boiler / pool heater furthest to the north would not be able to be replaced without removing the other boilers / pool heaters / SEE ALL NOTES DATED 12/27/22 FOR ALL ITEMS THAT NEED TO BE ADDRESSED /. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), . | LIDO | LIDO | | H= | P | 7620755 |
ROGERS AND SONS, INC. | HV | P | 12/27/2022 | NEED VERIFICATION THAT RUBBER COUPLER INSTALLED FOR VENT CONNECTION TO BOILER IS MANUFACTURER PROVIDED / VENT MUST SLOPE UP AWAY FROM THE BOILER A MINIMUM OF 1/4" PER FOOT ( see page 10) / ALL THREE BOILER EXHAUST TERMINATION ARE NOT PER MANUFACTURER REQUIREMENTS / RE-INSPECT ALL / | LIDO | LIDO | | HV | P | 7620556 |
ROGERS AND SONS, INC. | HI | P | 12/27/2022 | Added notes (LM) 12/28/22 (1.5" new gas pipe was installed) / PLANS SHOW 2" GAS NEW GAS PIPE FROM EXISTING 2" TO BOILERS. NEED TO INSTALL PER PLAN OR ENGINEER TO ADDRESS / WILL NEED PRESSURE TEST FOR NEW GAS PIPING INSTALLED (fyi- pressure test to be 10lb on a 30lb gauge) / | LIDO | LIDO | | HI | P | 7620552 |
ROGERS AND SONS, INC. | HWP | P | 12/27/2022 | NEED HYDRONIC PIPING INSPECTION AFTER ALL ITEMS ARE ADDRESSED / | LIDO | LIDO | | HWP | P | 7620551 |
ROGERS AND SONS, INC. | H= | P | 12/27/2022 | ADD 3 BOILERS, 3 VENTS AND 3 GAS PIPE OUTLETS TO SCOPE OF WORK / EQUIPMENT SCHEDULE FOR BOILERS SHOWS JANDY MODEL # EHE400 NC TO BE INSTALLED, JANDY MODEL # EHE 350 NS INSTALLED. NEED REVISED EQUIPMENT SCHEDULE OR ENGINEER APPROVED SUBMITTAL / PLANS SHOW NEW 2" GAS PIPE FROM EXISTING 2" TO BOILERS. NEED TO INSTALL PER PLAN OR ENGINEER TO ADDRESS / ALL THREE BOILERS ARE LACKING 36" PASSAGE. SEE IFGC CODE SECTION 306.2 / NEED TO REVIEW 2015 IFGC CODE SECTION 306.1 WITH SENIOR. WILL UPDATE NOTES AFTER / NEED CONTRACTOR TO PROVIDE VERIFICATION THAT BOILER ON STAND DOES NOT EXCEED 300LBS WITH WATER INCLUDED OR STAND WILL NEED TO BE ENGINEERED (see page 5)/ NEED VERIFICATION THAT RUBBER COUPLER INSTALLED FOR VENT CONNECTION TO BOILER IS MANUFACTURER PROVIDED / VENT MUST SLOPE UP AWAY FROM THE BOILER A MINIMUM OF 1/4" PER FOOT ( see page 10) / ALL THREE BOILER EXHAUST TERMINATION ARE NOT PER MANUFACTURER REQUIREMENTS / NEED FULL RE-INSPECTION AFTER ALL ISSUES ARE ADDRESSED, THERE MAY BE MORE ISSUES DUE TO LACK OF ACCESS TO BOILERS FOR A THOROUGH INSPECTION /
. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: mmaloney@springsgov.com or 385-5080), . | LIDO | LIDO | | H= | P | 7620549 |