EMPOWER CONSTRUCTION LLC | BFR | P | 01/22/2024 | CHanged B= to BFR // Provide open hole observation to complete BFT inspection // 3rd party weld and bolt observation on file | DOUGC | DOUGC | | BFR | P | 7973086 |
EMPOWER CONSTRUCTION LLC | BE | P | 10/25/2023 | | RITA | RITA | | BE | P | 7898642 |
EMPOWER CONSTRUCTION LLC | BFT | P | 04/26/2023 | Provide open hole report. / Engineer letter for footing observation on file. | ERAMIREZ | ERAMIREZ | | BFT | P | 7727151 |
EMPOWER CONSTRUCTION LLC | BFT | R | 04/24/2023 | Provide 3rd party engineer observations with stamp. | ERAMIREZ | ERAMIREZ | | BFT | R | 7724352 |
EMPOWER CONSTRUCTION LLC | BFR | R | 04/21/2023 | no documents uploaded with request | LONNYS | LONNYS | | BFR | R | 7723099 |
EMPOWER CONSTRUCTION LLC | B= | P | 04/19/2023 | complete H= / provide open hole, and footing obs. to complete BFT / no framing inspections performed - provide design professional stamped observations for all structural and non structural framing / rest of building final OK pending other required inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), GOLDEN WAY MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 7720857 |
EMPOWER CONSTRUCTION LLC | BFT | P | 03/29/2023 | Authorized 3rd party engineer inspection with all observation paperwork to follow / spoke with Troy with Empower on phone - 3rd party observation letters to follow | BRIANB | BRIANB | | BFT | P | 7701096 |
KENNY ELECTRIC SERVICE, INC. | E= | C | 04/10/2023 | bell box installed on whip ok / | MIGUEL | MIGUEL | | E= | C | 7711382 |
KENNY ELECTRIC SERVICE, INC. | ER | C | 04/10/2023 | PVC coated MC and PVC on canopy ok / | MIGUEL | MIGUEL | | ER | C | 7711325 |
KENNY ELECTRIC SERVICE, INC. | E= | P | 04/10/2023 | final pending exposed MC above drive thru window terminated in box or removed / rest ok / | MIGUEL | MIGUEL | | E= | P | 7711324 |
GOLDEN WAY MECHANICAL, INC. | H= | C | 09/08/2023 | Note / Clearances for GIH #1 have been met / Installation ok. MECHANICAL CONTRACTOR COMPLETE. | PAULO | PAULO | | H= | C | 7851188 |
GOLDEN WAY MECHANICAL, INC. | H= | P | 04/18/2023 | ATTACHED INSTALLATION INSTRUCTIONS FOR GIH#1 DOES NOT LIST MODEL # FOR UNIT HEATER INSTALLED (2352-N-DA-CFA INSTALLED), IF GOING BY THE 2352 # ON INSTRUCTIONS & LABEL TOP CLEARANCES IS (T= 16") AND HEATER IS INSTALLED AT 9". APPEARS HEAT DEFLECTOR IS INSTALLED AND WILL NEED INSTALLATION INSTRUCTIONS FOR REDUCED CLEARANCES IF APPLICABLE. | PAULO | PAULO | | H= | P | 7719766 |
GOLDEN WAY MECHANICAL, INC. | H= | P | 04/18/2023 | Received Installation Instructions (SEE IMAGES). | PAULO | PAULO | | H= | P | 7718963 |
GOLDEN WAY MECHANICAL, INC. | H= | P | 04/10/2023 | NOT READY. CONTRACTOR TO ADDRESS THE FOLLOWING-- ADD 1 UNIT HEATER & 3 FANS TO THE SCOPE OF WORK, NEED INSTALLATION INSTRUCTIONS FOR GIH#1 FOR INSPECTION. | PAULO | PAULO | | H= | P | 7711415 |
GOLDEN WAY MECHANICAL, INC. | HC | C | 04/10/2023 | ADDED 50K TO LOAD. | PAULO | PAULO | | HC | C | 7711413 |
GOLDEN WAY MECHANICAL, INC. | HI | C | 04/10/2023 | CONTRACTOR TO ADDRESS THE FOLLOWING-- ADD 1 UNIT HEATER & 3 FANS TO THE SCOPE OF WORK, NEED INSTALLATION INSTRUCTIONS FOR GIH#1 FOR INSPECTION. 10 lb. test ok. Note / Gas piping installed per plans. | PAULO | PAULO | | HI | C | 7711410 |
GOLDEN WAY MECHANICAL, INC. | HI | P | 04/04/2023 | PRESSURE TEST TO BE AT 10 lbs. (26 lbs. ON GAUGE). CONTRACTOR TO ADDRESS THE FOLLOWING-- NEED ELECTRICAL CONTRACTOR TO ATTACH TO PERMIT, ADD 1 UNIT HEATER & 3 FANS TO THE SCOPE OF WORK, SEAL BOTH SIDES OF GAS PENETRATION TO PARAPET WALL (SEE DETAIL PG. M2.1), NEED INSTALLATION INSTRUCTIONS FOR GIH#1. Note / Gas piping installed per plans. | PAULO | PAULO | | HI | P | 7706777 |