TURNER CONSTRUCTION COMPANY | B= | P | 02/23/2024 | Additional Inspections Required (computer generated): PIPE LINE SPECIALTIES INC. Mechanical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 8004041 |
TURNER CONSTRUCTION COMPANY | BSP | P | 01/03/2024 | Above drop ceiling penetrations and gyp ok at end of main hallway to "Retreat" / | ERIKK | ERIKK | | BSP | P | 7958713 |
TURNER CONSTRUCTION COMPANY | B= | P | 11/30/2023 | provide ANSI compliant signs at mens and womens restrooms / Missing positive stop shower controls for mens and womens ADA showers / Rest of 1st floor final ok pending "Retreat" space completion on 1st floor / Complete other inspection finals / -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, GREINER ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, SPECIAL SYSTEMS DESIGN,LLC Electrical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Mechanical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Plumbing Final Inspection is not Completed yet. | ERIKK | ERIKK | | B= | P | 7931539 |
TURNER CONSTRUCTION COMPANY | B= | P | 11/27/2023 | provide ANSI compliant signs at mens and womens restrooms, rest final on 2nd floor okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, GREINER ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, SPECIAL SYSTEMS DESIGN,LLC Electrical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Mechanical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7927754 |
TURNER CONSTRUCTION COMPANY | B= | P | 11/20/2023 | pending completion of other required inspections, need ansi compliant signs at rest rooms, rest of 3rd floor okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, GREINER ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, SPECIAL SYSTEMS DESIGN,LLC Electrical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Mechanical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7923725 |
TURNER CONSTRUCTION COMPANY | B= | P | 11/17/2023 | provide permanent ANSI compliant signage at all rest rooms on 4th floor, pending other required inspections, 4th floor okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yetRequest inspection through PPRBD system or contact 719-385-5982 for zoning questions, GREINER ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, SPECIAL SYSTEMS DESIGN,LLC Electrical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Mechanical Final Inspection is not Completed yet, PIPE LINE SPECIALTIES INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 7922366 |
TURNER CONSTRUCTION COMPANY | BSP | P | 10/11/2023 | courtesy visit to review requirements for stocking furniture in areas that are change of occupsncy | BOBF | BOBF | | BSP | P | 7884672 |
TURNER CONSTRUCTION COMPANY | BFR | P | 10/02/2023 | Grid - X framing in 1st floor elevator lobby okay | BOBF | BOBF | | BFR | P | 7873770 |
TURNER CONSTRUCTION COMPANY | BFR | P | 09/20/2023 | framing for interior walls south west corner on 1st floor okay per splice | BOBF | BOBF | | BFR | P | 7862516 |
TURNER CONSTRUCTION COMPANY | BFR | P | 09/05/2023 | 2nd floor North west space hard lid and soffit inspection ok / | ERIKK | ERIKK | | BFR | P | 7847130 |
TURNER CONSTRUCTION COMPANY | BSP | P | 08/23/2023 | hard lid and soffit framing throughout except elevator lobby on 1st floor okay | BOBF | BOBF | | BSP | P | 7835119 |
TURNER CONSTRUCTION COMPANY | BFR | P | 07/20/2023 | platform on 1st floor okay, hard lid framing on 2nd floor except nort west corner okay | BOBF | BOBF | | BFR | P | 7803894 |
TURNER CONSTRUCTION COMPANY | BFR | P | 07/14/2023 | penetration protection of shaftwall repair on 3rd and 4th floors okay | BOBF | BOBF | | BFR | P | 7798191 |
TURNER CONSTRUCTION COMPANY | BFR | P | 07/11/2023 | core board and 1st layer drywall install at Mech shaft repair on 3rd and 4th floors per U497 okay | BOBF | BOBF | | BFR | P | 7794805 |
TURNER CONSTRUCTION COMPANY | BFR | P | 06/21/2023 | 1ST FLOOR -- Interior light gauge frame at 1st floor OK except from grid lines E through 4 -- Reviewed accessible elements
3RD FLOOR -- Hard lids and soffits on 3rd floor OK | DAKOTAB | DAKOTAB | | BFR | P | 7777927 |
TURNER CONSTRUCTION COMPANY | BFR | R | 06/16/2023 | need to submit a stamped drawing by architect for mech shaft wall repair, drawing must be submitted to plan review and not to inspector | BOBF | BOBF | | BFR | R | 7773553 |
TURNER CONSTRUCTION COMPANY | BFR | R | 06/09/2023 | need to complete splice and approval for repair of mech shaft wall on 3rd and 4th floors, cannot complete inspection until type of shaft wall assembly has been identified, full reinspect required | BOBF | BOBF | | BFR | R | 7767835 |
TURNER CONSTRUCTION COMPANY | BFR | P | 06/05/2023 | wall framing throughout 2nd floor okay, still need to complete soffits and hard lid framing, priority framing for walls with duct spassing through on 1st floor okay, please note - still need to inspect shaft wall framing at elevators in 3rd and 4th floors | BOBF | BOBF | | BFR | P | 7762478 |
TURNER CONSTRUCTION COMPANY | BFR | P | 05/10/2023 | wall and soffit framing on 3rd floor okay, grid X install on 4th floor except rest tooms okay | BOBF | BOBF | | BFR | P | 7740823 |
TURNER CONSTRUCTION COMPANY | BFR | P | 04/12/2023 | Pending other required inspections - wall framing on 4th floor complete, still need sofiits, priority wall framing on 2nd and 3rd floors okay,( see highlighted / initialed plans on site for specific walls | BOBF | BOBF | | BFR | P | 7714340 |
TURNER CONSTRUCTION COMPANY | BFR | P | 03/13/2023 | courtesy visit to review scope and inspect misc walls on 4th floor, see plans on site for walls high lighted in yellow and initialed for wall locations approved | BOBF | BOBF | | BFR | P | 7685804 |
GREINER ELECTRIC, LLC. | E= | C | 02/21/2024 | | DAVIDRO | DAVIDRO | | E= | C | 8001839 |
GREINER ELECTRIC, LLC. | ER | P | 01/19/2024 | rest of drop ceilings ok | RANDY | RANDY | | ER | P | 7972493 |
GREINER ELECTRIC, LLC. | ER | P | 01/18/2024 | suspended ceiling passage 114 | BRET | BRET | | ER | P | 7970933 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 01/18/2024 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 7970931 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 01/18/2024 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 7970930 |
GREINER ELECTRIC, LLC. | E= | P | 01/16/2024 | electric rooms 2 thru floor, suspended wood ceilings | BRET | BRET | | E= | P | 7968951 |
GREINER ELECTRIC, LLC. | ER | P | 01/16/2024 | 195 bench receptacle, wood ceilings 2 thru 4 | BRET | BRET | | ER | P | 7968947 |
GREINER ELECTRIC, LLC. | ER | P | 12/06/2023 | rest of hardlids ok | RANDY | RANDY | | ER | P | 7937396 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 12/04/2023 | FIRE ALARM INSPECTION: Fire alarm hard lid ceiling rough Hall 191, conference 192 | RANDY | RANDY | | ER | P | 7934623 |
GREINER ELECTRIC, LLC. | ER | P | 12/04/2023 | Break 189, Hall 191,194 & 185, Open Collab 193 & Conference room 192 Hard Lid. | RANDY | RANDY | | ER | P | 7934590 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 11/30/2023 | FIRE ALARM INSPECTION: Above ceiling rough 1st floor hall 127 | RANDY | RANDY | | ER | P | 7932457 |
GREINER ELECTRIC, LLC. | ER | P | 11/29/2023 | . not floor boxes, electrical room. studio, security rooms. Main entry grid ceiling rough.-------marked on plans | RANDY | RANDY | | ER | P | 7930962 |
GREINER ELECTRIC, LLC. | E= | P | 11/22/2023 | Partial for second floor / Inspected plugs & lights only & emergency lighting / Still need to inspect the following for 2 nd floor: All power distribution in all electric rooms. / IT rooms / Verify GFCI for all drinking fountains. / Executive conference room tv wall / Kitchen missing GFCI in various locations that are w/in 6 feet of sink ( Note Plans ID this room as a Kitchen however no range or oven) If it is a Kitchen then GFCI would be required for all plugs. | JOSEPH | JOSEPH | | E= | P | 7926109 |
GREINER ELECTRIC, LLC. | ER | P | 11/10/2023 | first floor ceilings marked on plans | BRET | BRET | | ER | P | 7914956 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 11/10/2023 | FIRE ALARM INSPECTION: ceilings same area as electrical marked on plans | BRET | BRET | | ER | P | 7914954 |
GREINER ELECTRIC, LLC. | ER | P | 11/08/2023 | 3rd floor Partial final. Wood ceiling level 2 room 279 executive board room. | RANDY | RANDY | | ER | P | 7913022 |
GREINER ELECTRIC, LLC. | E= | P | 11/07/2023 | all 4th fl except panels and break area wood ceilings | RANDY | RANDY | | E= | P | 7910889 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 11/02/2023 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 7907575 |
GREINER ELECTRIC, LLC. | ER | P | 11/02/2023 | ceilings marked on plans | RANDY | RANDY | | ER | P | 7907500 |
GREINER ELECTRIC, LLC. | ER | P | 11/01/2023 | Second floor center core Wood Ceiling and First Floor break room 156 grid ceiling. | RANDY | RANDY | | ER | P | 7906236 |
GREINER ELECTRIC, LLC. | ER | P | 10/20/2023 | retreat space level 1----not marked on plans | RANDY | RANDY | | ER | P | 7894757 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 10/13/2023 | FIRE ALARM INSPECTION: Grid ceiling on level 1, 169,170,171,164,165,166,167,162,148. Grid Ceiling on level 2 226.256, 257,267, 268, 276, 279 | BRET | BRET | | ER | P | 7887053 |
GREINER ELECTRIC, LLC. | ER | P | 10/13/2023 | Grid ceiling on level 1, 169,170,171,164,165,166,167,162,148. Grid Ceiling on level 2 226.256, 257,267, 268, 276, 279 | BRET | BRET | | ER | P | 7887042 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 10/09/2023 | FIRE ALARM INSPECTION: elevator lobby 1st floor | BRET | BRET | | ER | P | 7881997 |
GREINER ELECTRIC, LLC. | ER | P | 10/06/2023 | elevator lobby marked on plans | RANDY | RANDY | | ER | P | 7880242 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 10/03/2023 | FIRE ALARM INSPECTION: North and south ceilings ok | RANDY | RANDY | | ER | P | 7875625 |
GREINER ELECTRIC, LLC. | ER | P | 10/03/2023 | Second Floor Room 242,243,244,236,235,233,239,237,231,232,230,227,203,205,221,219,253,261,258,259,252,264,247,246,254,253 | RANDY | RANDY | | ER | P | 7875620 |
GREINER ELECTRIC, LLC. | ER | P | 09/18/2023 | bathrooms 101,102,104,105, suspended ceiling 223, 226, 227, | BRET | BRET | | ER | P | 7859277 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 09/18/2023 | FIRE ALARM INSPECTION: bathrooms 101,102,104,105, suspended ceiling 223, 226, 227, | BRET | BRET | | ER | P | 7859263 |
GREINER ELECTRIC, LLC. | ER | P | 09/12/2023 | 3rd floor drop ceiling , 119 t.v wall | BRET | BRET | | ER | P | 7853527 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 09/12/2023 | FIRE ALARM INSPECTION: 3rd drop ceiling ok | BRET | BRET | | ER | P | 7853524 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 09/12/2023 | FIRE ALARM INSPECTION: 3rd drop ceiling ok | BRET | BRET | | ER | P | 7853525 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 09/07/2023 | FIRE ALARM INSPECTION: above ceiling rough 3rd floor south and middle areas | RANDY | RANDY | | ER | P | 7850124 |
GREINER ELECTRIC, LLC. | ER | P | 09/06/2023 | Second floor Multi-purpose room hard lid. Partial grid ceiling 3rd floor. | RANDY | RANDY | | ER | P | 7848551 |
GREINER ELECTRIC, LLC. | ER | P | 09/01/2023 | h 1st floor. Conf. 148, 162, 164. Breakout 155, Open Collab 138. | RANDY | RANDY | | ER | P | 7844671 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 08/29/2023 | FIRE ALARM INSPECTION: FIRE ALARM INSPECTION: Fire alarm above ceiling rough Open Office 335, 332, 334, 326,324. Office 330,328/,327 Tele-conf. 329,331. Grid Ceiling | BRET | BRET | | ER | P | 7840789 |
GREINER ELECTRIC, LLC. | ER | P | 08/29/2023 | open Office 335, 332, 334, 326,324. Office 330,328/,327 Tele-conf. 329,331. Grid Ceiling | BRET | BRET | | ER | P | 7840785 |
GREINER ELECTRIC, LLC. | ER | P | 08/18/2023 | 1st floor bathroom 101/105 mirror walls and hall 137 added TV, 2nd floor bathroom 201/207 hard lid. 4th floor breakroom 475 wood ceiling.
| RANDY | RANDY | | ER | P | 7830679 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 08/11/2023 | FIRE ALARM INSPECTION: 4th floor fire alarm above ceiling rough | RANDY | RANDY | | ER | P | 7824575 |
GREINER ELECTRIC, LLC. | ER | P | 08/11/2023 | all drop ceilings level 4 except rooms not highlighted on plans------ Second floor Hard lid Men's 249, Breakout 245 | RANDY | RANDY | | ER | P | 7824567 |
GREINER ELECTRIC, LLC. | ER | P | 08/09/2023 | Hard lid ceilings Level 2 and 1 marked on plans | RANDY | RANDY | | ER | P | 7821717 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 08/09/2023 | FIRE ALARM INSPECTION: 2nd floor fire alarm elevator lobby hard lid | RANDY | RANDY | | ER | P | 7821712 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 08/02/2023 | FIRE ALARM INSPECTION: 2nd floor hard lids east | RANDY | RANDY | | ER | P | 7815098 |
GREINER ELECTRIC, LLC. | ER | P | 08/01/2023 | Level 2 hard lids - East | RANDY | RANDY | | ER | P | 7814097 |
GREINER ELECTRIC, LLC. | ER | P | 07/27/2023 | Partial exterior walls level 1-------marked on plans | RANDY | RANDY | | ER | P | 7810572 |
GREINER ELECTRIC, LLC. | ER | P | 07/24/2023 | MARKED ON PLANS WITH ORANGE HIGH LITE ---------------------- NOTE TALKED TO CONTRACTOR ABOUT 210.65 FOR MEETING ROOMS UNDER 2020 CODE | CRAIG | CRAIG | | ER | P | 7806099 |
GREINER ELECTRIC, LLC. | ER | P | 07/20/2023 | Wall Rough, Copy Print Room 410. Break Lounge 155, Storage 157, Prayer 158, | RANDY | RANDY | | ER | P | 7803013 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 07/13/2023 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 7797251 |
GREINER ELECTRIC, LLC. | ER | P | 07/13/2023 | 1st fl walls marked on plans | RANDY | RANDY | | ER | P | 7796993 |
GREINER ELECTRIC, LLC. | ER | P | 07/10/2023 | Second Partial walls, 4th Floor remaining hard lid. 3rd floor Bathroom hard lid.----rooms 456,357,223,217, 200 | RANDY | RANDY | | ER | P | 7793360 |
GREINER ELECTRIC, LLC. | E= | R | 06/30/2023 | no final at this time | RANDY | RANDY | | E= | R | 7788131 |
GREINER ELECTRIC, LLC. | ER | P | 06/30/2023 | exterior walls Level 2-----will mark on plans next inspection | RANDY | RANDY | | ER | P | 7788123 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 06/28/2023 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 7784317 |
GREINER ELECTRIC, LLC. | ER | P | 06/28/2023 | level 3. Tele-conference room 276 & Board room 279 walls. | RANDY | RANDY | | ER | P | 7784314 |
GREINER ELECTRIC, LLC. | ER | P | 06/21/2023 | Partial Second floor walls, Partial Third floor hard lid. Focus 339 & Men's 345. | RANDY | RANDY | | ER | P | 7778261 |
GREINER ELECTRIC, LLC. | ER | P | 06/15/2023 | 2nd floor partial wall rough. 3rd floor partial hard lid. | RANDY | RANDY | | ER | P | 7773203 |
GREINER ELECTRIC, LLC. | E= | P | 06/02/2023 | bathrooms 401 and 407 hard lids | RANDY | RANDY | | E= | P | 7761633 |
GREINER ELECTRIC, LLC. | ER | P | 05/23/2023 | 3rd floor walls. Second floor electrical room question. 4th floor hard lid. | RANDY | RANDY | | ER | P | 7752277 |
GREINER ELECTRIC, LLC. | ER | P | 05/17/2023 | 3rd floor South & South east office walls------marked on plans | RANDY | RANDY | | ER | P | 7746723 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 05/11/2023 | FIRE ALARM INSPECTION: Fa with electric | RANDY | RANDY | | ER | P | 7742419 |
GREINER ELECTRIC, LLC. | ER | P | 05/11/2023 | all walls and hard lids marked on plans | RANDY | RANDY | | ER | P | 7742183 |
GREINER ELECTRIC, LLC. | ER | P | 04/26/2023 | 4th floor walls and hard lid open work 434 & 472. Some walls was redesigned after last inspection. | RANDY | RANDY | | ER | P | 7728204 |
GREINER ELECTRIC, LLC. | ER | P | 04/20/2023 | walls not complete marked on plans | RANDY | RANDY | | ER | P | 7722674 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 04/20/2023 | FIRE ALARM INSPECTION: FA with electric | RANDY | RANDY | | ER | P | 7722669 |
GREINER ELECTRIC, LLC. | ER | P | 04/14/2023 | rooms 418,419,426,427,428,429,430,439,438,441,458,459,461,462 walls | RANDY | RANDY | | ER | P | 7717607 |
PIPE LINE SPECIALTIES INC. | H= | P | 04/19/2024 | MECHANICAL FINAL PENDING-----------------------TEST AND BALANCE REPORT. | TREVORH | TREVORH | | H= | P | 8058250 |
PIPE LINE SPECIALTIES INC. | HD | P | 02/21/2024 | MECHANICAL FINAL PENDING---------------------CONTRACTOR TO REMOVE 3 FORCED AIR FURNACES FROM THE SCOPE OF WORK, TEST AND BALANCE REPORT
| TREVORH | TREVORH | | HD | P | 8002062 |
PIPE LINE SPECIALTIES INC. | H= | P | 01/16/2024 | 1 ST FLOOR ABOVE CEILING OK , AT NEXT INSPECTION REQUEST CONTRACTOR WILL NEED TO UPDATE THEIR SCOPE OF WORK. WILL VERIFY THERMOSTAT LOCATIONS AND TEST AND BALANCE REPORT FOR THE ENTIRE BUILDING AT FINAL. | TREVORH | TREVORH | | H= | P | 7969049 |
PIPE LINE SPECIALTIES INC. | HD | P | 11/29/2023 | 1ST FLOOR ABOVE CEILING IN (NEW RETREAT) HARD LIDS OK. 1ST FLOOR THERMOSTATS PER PLAN.
TEST AND BALANCE REPORT BY FINAL | TREVORH | TREVORH | | HD | P | 7930776 |
PIPE LINE SPECIALTIES INC. | HD | P | 11/21/2023 | ALL GRILLE, REGISTERS AND DIFFUSER OK, ALL THERMOSTATS INSTALLED PER PLAN MECHANICAL FINAL FROM 4 TH FLOOR THROUGH TO 2 ND FLOOR OK PENDING TEST AND BALANCE REPORT. | TREVORH | TREVORH | | HD | P | 7925751 |
PIPE LINE SPECIALTIES INC. | HD | P | 11/09/2023 | STILL NEED TO UPDATE SCOPE OF WORK. 1 ST FLOOR FLEX TO ALL REGISTER,GRILLE AND DIFFUSER NOW COMPLETE ///////NOT INCLUDING WORK ON NEW PLAN SPLICE FOR THE ASI ////////// | TREVORH | TREVORH | | HD | P | 7914589 |
PIPE LINE SPECIALTIES INC. | HD | P | 11/01/2023 | (ASI # 13 ) 1 ST FLOOR MAIN TRUNK LINES AND ROUND LATERAL RUN OUTS OK, OK TO WRAP, MEDIUM PRESSURE SUPPLY TO VAV'S OK, OK TO WRAP. 2 ND FLOOR SLOT DIFFUSERS ARE NOW COMPLETE. | TREVORH | TREVORH | | HD | P | 7906030 |
PIPE LINE SPECIALTIES INC. | HD | P | 10/26/2023 | 2 ND FLOOR SLOT DIFFUSERS ABOVE WOOD CLOUDS OK. 1 ST FLOOR DUCT ROUGH COMPLETE ////////EXCEPT ALL ITEMS RELATED TO NEW PLAN SPLICE DATED 10-25-23////////// 1 ST FLOOR FLEX AND REGISTERS ALSO OK NOT INCLUDING SPLICE | TREVORH | TREVORH | | HD | P | 7900717 |
PIPE LINE SPECIALTIES INC. | HWP | P | 10/26/2023 | 80 PSI TEST OK, HWS & HWR 1ST FLOOR HYDRONIC PIPING INSTALLED OK, OK TO INSULATE AND LABEL. | TREVORH | TREVORH | | HWP | P | 7900694 |
PIPE LINE SPECIALTIES INC. | H= | P | 10/13/2023 | BY FINAL WILL NEED TO SEE PLAN SPLICE FOR CHANGING SLOT DIFFUSER SIZE AND ADDING CEILING IN JANITOR CLOSET, 2 ND FLOOR ABOVE CEILING ALL FLEX AND REGISTERS INSTALLED PER PLAN AT NEXT 2ND FLOOR INSPECTION WILL VERIFY THERMOSTAT LOCATIONS PER PLAN. | TREVORH | TREVORH | | H= | P | 7888057 |
PIPE LINE SPECIALTIES INC. | HD | P | 10/06/2023 | 1 ST FLOOR ELEVATOR LOBBY ABOVE HARD LID CEILING ROUGH OK, OK TO WRAP-, ACCESS DOOR LOCATIONS OK. | TREVORH | TREVORH | | HD | P | 7880848 |
PIPE LINE SPECIALTIES INC. | HD | P | 09/22/2023 | 1 ST FLOOR FIRE DAMPER FRAMING RELOCATING EXISTING DAMPER/ FRAMING OPENING NOT SIZED PROPERLY FRAMING ABOVE DOOR RIGHT SIDE OF DAMPER FRAMING WILL NEED TO FRAME TO INSTALLATION INSTRUCTIONS RE INSPECT WHEN READY. | TREVORH | TREVORH | | HD | P | 7865735 |
PIPE LINE SPECIALTIES INC. | HV | P | 09/14/2023 | CONTRACTOR WILL NEED TO ADD VENT TO THEIR SCOPE OF WORK , WILL NEED TO SEE PRESSURE TEST AT NEXT INSPECTION REQUEST VENTING RAN PER MANUFACTURES INSTALLATION INSTRUCTIONS. | TREVORH | TREVORH | | HV | P | 7857090 |
PIPE LINE SPECIALTIES INC. | HWP | P | 09/08/2023 | WORK ROOM 115 50 LB TEST OK FOR THE HWS/HWR AND CWS/CWR PIPING TO FCU'S 2,3 AND 4 OK, OK TO INSULATE AND LABEL. VERIFY CONDENSATE PIPING WHEN READY. | TREVORH | TREVORH | | HWP | P | 7851483 |
PIPE LINE SPECIALTIES INC. | HD | P | 08/30/2023 | PLAN SHEET M2 . 01 LINEAR SLOT TO HARD LID THROUGH OUT OK, EXCEPT STILL NEED TO VERIFY SLOT INSTALL IN THE ELEVATOR CORRIDOR. DUCT ROUGH IN MECHANICAL ROOM: FCU-2-2 & 2-3 ARE NOW INSTALLED OK, SUPPLY DUCTING OK, OK TO WRAP. CUH-1-1 INSTALLED OK. AT NEXT INSPECTION STILL NEED TO SEE FIRE DAMPER FRAMING FOR RELOCATED FIRE DAMPER WHEN READY. | TREVORH | TREVORH | | HD | P | 7842941 |
PIPE LINE SPECIALTIES INC. | HD | P | 08/16/2023 | 3 RD FLOOR ABOVE CEILING: SUPPLY FLEX AND REGISTERS INSTALLED PER PLAN STILL NEED TO VERIFY RETURN AIR BOOT INSTALL WHEN READY.
1ST FLOOR BATH EXHAUST DUCTING : MENS AND WOMENS SHOWER EXHAUST DUCTING OK. | TREVORH | TREVORH | | HD | P | 7828126 |
PIPE LINE SPECIALTIES INC. | HD | P | 08/15/2023 | CANCELLED BY CONTRACTOR RESCHEDULED FOR TOMORROW | TREVORH | TREVORH | | HD | P | 7827404 |
PIPE LINE SPECIALTIES INC. | H= | P | 08/09/2023 | 4 th FLOOR ABOVE CEILING: ALL FLEX AND REGISTERS INSTALLED PER PLAN, RETURN AIR GRILLES PER PLAN . THERMOSTATS INSTALLED PER PLAN | TREVORH | TREVORH | | H= | P | 7821946 |
PIPE LINE SPECIALTIES INC. | HD | P | 08/01/2023 | 2 ND FLOOR FLEX AND CANS TO HARD LIDS ARE NOW OK. | TREVORH | TREVORH | | HD | P | 7814217 |
PIPE LINE SPECIALTIES INC. | HSP | P | 08/01/2023 | IN OFFICE REVIEW OF PLAN PRIOR TO ON-SITE INSPECTION / (PLAN SHEET M2.02 ) (BDA PAGE 73) STILL NEED TO SEE VAV'S AND DUCTING COMPLETED FOR # 9, # 43, # 24,# 17,#18 VERIFY WHEN READY. ALL REMAINING VAV'S MEDIUM PRESSURE SUPPLY , LOW PRESSURE SUPPLY MAINS AND ROUND LATERAL RUN OUTS OK,OK TO WRAP. NO BATH EXHAUST AT THIS TIME VERIFY DUCT TO HARD LIDS WHEN READY. | TREVORH | TREVORH | | HSP | P | 7813613 |
PIPE LINE SPECIALTIES INC. | HD | P | 07/06/2023 | INSPECTED FIRE/SMOKE DAMPERS AS PER PLAN SPLICE M6.01 DETAIL 6 ON ALL THREE FLOORS/ ANNULAR SPACE AND BREAKAWAYS OK/ STILL TO VERIFY ANGLES SECURED TO FLOOR AND LABELED DAMPER ACCESS WHEN READY/ M2.01 (1 ST FLOOR DUCT ROUGH) PER CONTRACTOR THERE WILL BE AN UPCOMING PLAN SPLICE FOR THE RELOCATION OF VAV-20, 24 AND ASSOCIATED DUCTWORK/ VAV'S 16,18 AND 20-30 INSPECTED. MEDIUM PRESSURE SUPPLY AND SUPPLY DOWNSTREAM OF VAV'S TO INCLUDE ROUND LATERAL RUN OUTS FROM COLUMN LINE E TO H AND LINE 3 TO 7 (SOUTH WEST) OK TO WRAP. 3 RD FLOOR ABOVE HARD LIDS FLEX AND REGISTERS INSTALLED PER PLAN. | JONH | JONH | | HD | P | 7790669 |
PIPE LINE SPECIALTIES INC. | HSP | P | 07/06/2023 | IN OFFICE REVIEW OF PLAN / INSTALL INSTRUCTIONS PRIOR TO ON-SITE INSPECTION / REVIEWED FIRE/ SMOKE DAMPER (Greenheck FSD 312) INSTALL LOCATION FOR FIRE DAMPER FRAME INSPECTION IN CONCRETE FLOOR / | LIDO | LIDO | | HSP | P | 7790476 |
PIPE LINE SPECIALTIES INC. | HWP | P | 06/21/2023 | 2 ND FLOOR CWS AND CWR PIPE IDENTIFICATION OK FOR ENTIRE FLOOR. | TREVORH | TREVORH | | HWP | P | 7778377 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/21/2023 | (1 ST FLOOR DUCT ROUGH) PER CONTRACTOR THERE WILL BE AN UPCOMING PLAN SPLICE FOR THE RELOCATION OF VAV-1-13, 1-5 AND 1-6, VAV, MEDIUM PRESSURE SUPPLY AND SUPPLY DOWNSTREAM OF VAV'S TO INCLUDE ROUND LATERAL RUN OUTS FROM COLUMN LINE C TO H AND LINE 2 ALL THE WAY NORTH OK, OK TO WRAP. 3 RD FLOOR ABOVE HARD LIDS FLEX AND REGISTERS INSTALLED PER PLAN. | TREVORH | TREVORH | | HD | P | 7778372 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/15/2023 | 4 TH FLOOR PER CONTRACTOR THERE WILL BE A FORTHCOMING PLAN SPLICE FOR DUCT CHANGES FOR VAV-4-35 DUCT SIZE AND ROUTING . 3 RD FLOOR: 78 X 28 FIRE SMOKE DAMPER ANNULAR SPACING OK. | TREVORH | TREVORH | | HD | P | 7773184 |
PIPE LINE SPECIALTIES INC. | HSP | P | 06/15/2023 | PLAN SPLICE DATED 6-9-23 ) CONSULTATION FOR THE IN FLOOR FIRE SMOKE DAMPERS ANNULAR SPACING CURRENTLY OVER SIZED FOR ONE SIDE ANGLE. | TREVORH | TREVORH | | HSP | P | 7773178 |
PIPE LINE SPECIALTIES INC. | HWP | P | 06/12/2023 | (PLAN SHEET M302) BDA PAGE 78, HYDRONICS 50 LB TEST OK FOR HWS/HWR FOR ENTIRE VAV SYSTEM PIPING RAN PER PLAN, OK, OK TO INSULATE. PIPING IDENTIFICATION COMPLETE ON 4TH AND 3 RD FLOORS. | TREVORH | TREVORH | | HWP | P | 7769486 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/06/2023 | 4 th FLOOR DUCT ROUGH: SLOT DIFFUSERS LOCATED IN THE HARD LID SOFFIT OK. WHEN READY WILL VERIFY DUCTING ABOVE HARD LIDS IN NEW REST ROOMS. 3 RD FLOOR FIRE SMOKE DAMPER BREAK AWAY INSIDE SHAFT OK, WHEN READY WILL VERIFY ANNULAR SPACING AND RETAINING ANGLE AT SAME SHAFT. | TREVORH | TREVORH | | HD | P | 7764497 |
PIPE LINE SPECIALTIES INC. | HD | P | 06/01/2023 | (PLAN SHEET M2.02 ) (BDA PAGE 73) STILL NEED TO SEE VAV'S AND DUCTING COMPLETED FOR # 9, # 43, # 24,# 17,#18 VERIFY WHEN READY. ALL REMAINING VAV'S MEDIUM PRESSURE SUPPLY , LOW PRESSURE SUPPLY MAINS AND ROUND LATERAL RUN OUTS OK,OK TO WRAP. NO BATH EXHAUST AT THIS TIME VERIFY DUCT TO HARD LIDS WHEN READY. | TREVORH | TREVORH | | HD | P | 7760262 |
PIPE LINE SPECIALTIES INC. | HSP | P | 05/15/2023 | CONSULTATION WITH RAY @ PIPE LINE ON REQUIRED PLAN SPLICE CHANGING LOCATION OF EXHAUST RISER NEED TO SEE PLAN SPLICE . | TREVORH | TREVORH | | HSP | P | 7744217 |
PIPE LINE SPECIALTIES INC. | HD | P | 05/12/2023 | 3RD FLOOR PLAN SHEET M2.03 SOUTH SIDE ALL MEDIUM PRESSURE SUPPLY ,VAV'S MAIN TRUNK LINES AND ROUND LATERAL RUN OUTS OK, OK TO WRAP. NO EXHAUST DUCTING INSTALLED AT THIS TIME. | JONH | JONH | | HD | P | 7743098 |
PIPE LINE SPECIALTIES INC. | HWP | P | 05/10/2023 | PLAN SHEET M3.03 (BDA PAGE 79) HYDRONIC PIPING HWS/HWR 50 LB TEST OK PIPING RAN PER PLAN OK, OK TO INSULATE //////EXCEPT VAV-3-30 NOT CONNECTED OK TO SEND PICTURE WHEN COMPLETED. | TREVORH | TREVORH | | HWP | P | 7741230 |
PIPE LINE SPECIALTIES INC. | HWP | P | 05/08/2023 | INSPECTION CANCELED BY CONTRACTOR VIA PHONE CALL | TREVORH | TREVORH | | HWP | P | 7738272 |
PIPE LINE SPECIALTIES INC. | HD | P | 05/05/2023 | Wrong inspection requested Contractor Needed a Plumbing inspection, Inspection Canceled by Contractor. | TREVORH | TREVORH | | HD | P | 7737122 |
PIPE LINE SPECIALTIES INC. | HD | P | 05/02/2023 | 3RD FLOOR PLAN SHEET M2.03 NORTH SIDE ALL MEDIUM PRESSURE SUPPLY ,VAV'S MAIN TRUNK LINES AND ROUND LATERAL RUN OUTS OK, OK TO WRAP. NO EXHAUST DUCTING INSTALLED AT THIS TIME . (FYI) IF CONVERTING DUCT FROM RECTANGLE TO ROUND PLAN SPLICE WILL BE NEEDED | TREVORH | TREVORH | | HD | P | 7733310 |
PIPE LINE SPECIALTIES INC. | HD | P | 04/20/2023 | PLAN SHEET M2.04 : PER CONVERSATION WITH CONTRACTOR THERE IS A FORTHCOMING PLAN SPLICE TO INCLUDE BUT NOT LIMITED TO ADDING FIRE SMOKE DAMPER FOR NEW EXHAUST SHAFT AND RELOCATION OF VAV-17. (DUCT ROUGH) 4 TH FLOOR WORK FROM CENTER OF FLOOR TO THE SOUTH SIDE VAV INSTALL OK, SUPPLY MAINS AND ROUND LATERAL RUN OUTS OK, OK TO WRAP MARKED ON PLANS WILL VERIFY REMAINING DUCTWORK IN SAME AREA WHEN READY. NO ROOF TODAY. ON 4TH FLOOR STILL NEED TO SEE EXPOSED DUCTING IN CLEAR STORY, NEW EXHAUST FANS, | TREVORH | TREVORH | | HD | P | 7722872 |
PIPE LINE SPECIALTIES INC. | HWP | P | 04/19/2023 | 4 TH FLOOR , PLAN SHEET M301 (BDA PAGE 80) HYDRONIC PIPING :EXISTING MAINS DO NOT MATCH PLANS, 50 LB TEST OK, HWS/HWR PIPING RAN PER PLAN OK, OK TO INSULATE AND LABEL. | TREVORH | TREVORH | | HWP | P | 7721140 |
PIPE LINE SPECIALTIES INC. | HSP | P | 04/03/2023 | NEED TO CORRECT SCOPE OF WORK AND ALSO INCLUDE HYDRONICS WILL INSPECT PIPING AND PRESSURE TEST WHEN READY. | TREVORH | TREVORH | | HSP | P | 7705856 |
PIPE LINE SPECIALTIES INC. | HD | P | 04/03/2023 | PLAN SHEET M2.04 : PER CONVERSATION WITH CONTRACTOR THERE IS A FORTHCOMING PLAN SPLICE TO INCLUDE BUT NOT LIMITED TO ADDING FIRE SMOKE DAMPER FOR NEW EXHAUST SHAFT. (DUCT ROUGH) WORK FROM CENTER OF FLOOR TO THE NORTH VAV INSTALL OK, SUPPLY MAINS AND ROUND LATERAL RUN OUTS OK, OK TO WRAP MARKED ON PLANS WILL VERIFY REMAINING DUCTWORK IN SAME AREA WHEN READY. NO ROOF TODAY. | TREVORH | TREVORH | | HD | P | 7705830 |
PIPE LINE SPECIALTIES INC. | P= | P | 02/13/2024 | Still need plan splice for deletion of fixtures on 4th floor per 4/19/23 inspection / Need plan splice for changes to vent per 6/1/23 inspection / Need plan splice for vent size changes to sinks all 2" per 7/7/23 inspection / Need plans splice for water line changes per 10/4/23 inspection / Rest OK | ADRIANM | ADRIANM | | P= | P | 7994179 |
PIPE LINE SPECIALTIES INC. | P= | P | 02/12/2024 | Will follow up 2/13/24 to verify all splices necessary are complete / Rest OK | ADRIANM | ADRIANM | | P= | P | 7993345 |
PIPE LINE SPECIALTIES INC. | P= | P | 12/12/2023 | need to see sink installed at Conference Room 188 / Accessible showers on 1st floor require a handheld shower with non-positive shut-off / still need plan splices / rest ok | TREBORB | TREBORB | | P= | P | 7943304 |
PIPE LINE SPECIALTIES INC. | P= | P | 11/07/2023 | still need splices as per pto notes / 1st floor urinals and showers not completed, need to inspect / 2nd and 3rd floor drinking fountains need proper clearances / need trap guards installed at emergency floor drains / need to inspect mech room/boiler room / need to inspect warming kitchen | TREBORB | TREBORB | | P= | P | 7911243 |
PIPE LINE SPECIALTIES INC. | PTO | P | 10/06/2023 | breakout lounge 189 water piping insulation ok | TREBORB | TREBORB | | PTO | P | 7880902 |
PIPE LINE SPECIALTIES INC. | PTO | P | 10/04/2023 | breakout lounge 189 - dwv ok, water ok less insulation / will need plan splice for water line changes | TREBORB | TREBORB | | PTO | P | 7877047 |
PIPE LINE SPECIALTIES INC. | PAV | P | 10/04/2023 | water heater vent and test ok, roof term with concentric / intake has backgrade, can inspect at final | TREBORB | TREBORB | | PAV | P | 7877046 |
PIPE LINE SPECIALTIES INC. | PTO | P | 08/31/2023 | 2" dwv waste underbelly in crawl space ok to S-1 sink at "Conference" room 188 | TREBORB | TREBORB | | PTO | P | 7843555 |
PIPE LINE SPECIALTIES INC. | PTO | P | 07/17/2023 | 1st floor in wall and over head ok / piping insulation ok | TREBORB | TREBORB | | PTO | P | 7799207 |
PIPE LINE SPECIALTIES INC. | PTO | P | 07/11/2023 | 1st floor in wall pipe insulation ok. | TAYLOR | TAYLOR | | PTO | P | 7794308 |
PIPE LINE SPECIALTIES INC. | PTO | P | 07/07/2023 | 1st floor dwv and water ok less piping insulation / in wall ok less piping insulation / will need plan splice for vent size changes to sinks all 2" | TREBORB | TREBORB | | PTO | P | 7791875 |
PIPE LINE SPECIALTIES INC. | PTO | P | 06/20/2023 | 2nd floor piping insulation ok / 2nd floor complete | TREBORB | TREBORB | | PTO | P | 7777206 |
PIPE LINE SPECIALTIES INC. | PTO | P | 06/07/2023 | 1st floor dwv underbelly ok / will need plan splice for changes | TREBORB | TREBORB | | PTO | P | 7765285 |
PIPE LINE SPECIALTIES INC. | PTO | P | 06/02/2023 | water piping on 2nd floor ok less piping insulation | TREBORB | TREBORB | | PTO | P | 7760868 |
PIPE LINE SPECIALTIES INC. | PTO | P | 06/01/2023 | DWV in wall and underbelly ok at breakroom 234, and executive breakroom 275 - will need plan splice for changes to vent // welness 205 and drinking fountain 2nd floor dwv in wall ok // warming kitchen in wall dwv ok on 2nd floor // 3rd floor water piping insulation complete | TREBORB | TREBORB | | PTO | P | 7760049 |
PIPE LINE SPECIALTIES INC. | PTO | P | 05/16/2023 | insulation at DWP for 3rd floor at rooms 345, 357, 379, and 381 ok. | TAYLOR | TAYLOR | | PTO | P | 7745156 |
PIPE LINE SPECIALTIES INC. | PTO | P | 05/09/2023 | 2nd floor 3" dwv riser to 3rd floor breakroom and wellness sinks ok / 3rd floor water mains on less piping insulation / 3rd floor dwv at breakroom and wellness sink ok, underbelly ok, in wall ok less piping insulation / 4th floor PTO complete, piping insulation ok | TREBORB | TREBORB | | PTO | P | 7739130 |
PIPE LINE SPECIALTIES INC. | PTO | P | 04/25/2023 | 4th floor restrooms, overhead ok / in wall ok / 4th floor wellness and breakroom in wall ok | TREBORB | TREBORB | | PTO | P | 7726886 |
PIPE LINE SPECIALTIES INC. | PTO | P | 04/21/2023 | water in wall ok 2nd thru 3rd floors less piping insulation and hammer arrestors / water ok on 4th floor restrooms, in wall complete / dwv ok 2nd- 4th floors and under belly for 2nd floor / dwv and water ok 4th floor breakroom and wellness sinks less piping insulation / | TREBORB | TREBORB | | PTO | P | 7723215 |
PIPE LINE SPECIALTIES INC. | PTO | P | 04/19/2023 | 1st floor in wall dwv and water ok at showers, grid lines B.5-C.4, 2-5 ok less hammer arrestors, water pipe insulation, need to see 2" vent tie in in wall // 4th floor domest water piping ok less hammer arrestors and pipe insulation // need plan splice for deletion of fixtures on fourth floor | TREBORB | TREBORB | | PTO | P | 7721492 |
PIPE LINE SPECIALTIES INC. | PTO | P | 03/08/2023 | dwv under belly ok for restrooms at men's 105 and women's 101 , grid lines B.5-D, and 2-4, less grease waste | TREBORB | TREBORB | | PTO | P | 7682005 |
TURNER CONSTRUCTION COMPANY | XBS | T | 10/23/2023 | PAID (REC#2003083): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Numerous minor architectural changes. See narrative for comprehensive list. | BPHILLIPS | BPHILLIPS | | XBS | T | 7895543 |
GREINER ELECTRIC, LLC. | XES | T | 10/16/2023 | PAID (REC#2000058): PLAN SPLICE FEE: $50 by: DANIELG for Electrical: As built changes. | DANIELG | DANIELG | | XES | T | 7888530 |
GREINER ELECTRIC, LLC. | XES | T | 08/16/2023 | PAID (REC#1979779): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Added area to scope, see E 2.01 | SHELBY | SHELBY | | XES | T | 7828755 |
PIPE LINE SPECIALTIES INC. | XMS | T | 07/17/2023 | PAID (REC#1974226): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Clouds | DALEH | DALEH | | XMS | T | 7799166 |
PIPE LINE SPECIALTIES INC. | XPS | P | 07/17/2023 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Revised sheet P2.00, P2.01 and P3.00. | SHANEN | SHANEN | | XPS | P | 7798915 |
TURNER CONSTRUCTION COMPANY | XBS | T | 07/14/2023 | PAID (REC#1969714): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Revised level 1 floor plan, provided assembly detail, revised door schedule. | BPHILLIPS | BPHILLIPS | | XBS | T | 7798267 |
TURNER CONSTRUCTION COMPANY | XBS | T | 07/07/2023 | PAID (REC#1967570): PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided assembly for shaft wall rebuild. | BPHILLIPS | BPHILLIPS | | XBS | T | 7791701 |
PIPE LINE SPECIALTIES INC. | XMS | T | 06/09/2023 | PAID (REC#1960890): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: CLOUDS | DALEH | DALEH | | XMS | T | 7767479 |